Aidan Petersen

Civil Engineer at Smart Nine Project Management
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Civil Engineer
      • Apr 2017 - Present

      General project support including:• Preparation and review of Project Management Plans including quality, construction, safety, environmental, severe weather.• Preparation and review of ITPs and Construction Procedures for various types of activities including asphalt, concrete, earthworks, landscaping, guardrail etc.• Procurement vendor analysis during the tender stage of various projects.• Assist projects with gaps in quality documentation and provide quality control support.• Manage construction programs using various software, including Microsoft Project and Primavera P6.

    • Pre-Contracts Engineer
      • Dec 2019 - Aug 2021

      Worked with Ventia, part of the SPARK Consortium, on Melbourne's North East Link Project during tender stage. The $7 Billion project will link the M80 Ring Road in the north, to the Eastern Freeway to the south. The Primary Package includes a 6km twin-tunnel, adjacent shared user paths, new interchanges for major roads and tie-ins to the existing freeways. My work with the Operations & Maintenance (O&M) team involved managing the interface between Design-Construction-Architects-O&M, advising on maintenance implications of design choices, regular presentations to key stakeholders, defining maintenance scope and boundaries.

    • Project Control Engineer
      • Jul 2018 - Jun 2021

      Worked with Fulton Hogan Seymour Whyte Joint Venture on the Caloundra Road to Sunshine Motorway Bruce Highway Upgrade. Provided Project Controls Engineering support to the commercial team by compiling information and costs for wet weather insurance claims, investigating scope change costs and preparing reports for submission to TMR.

    • Site Engineer
      • Jan 2021 - May 2021

      Worked with Bielby Holdings on the Everton Park Link Road. The project involved the construction of a new link road between Stafford Rd and South Pine Road, including new intersections, upgrades to existing roads and new accesses to the surrounding shopping centres.

    • Site Engineer
      • Aug 2019 - Oct 2019

      Worked with WBHO Infrastructure as a Site Engineer on the Bruce Highway Safety Upgrade - Bororen to Tannum Sands. The project involved the construction of new overtaking lanes, upgrading intersections, formation widening and general safety upgrades along the Bruce Highway. I was responsible for tracking costs, preparing variations, composing quality documentation, managing subcontractors and planning the remainder of the works.

    • Site Engineer
      • Feb 2019 - May 2019

      Worked with Civil Mining and Construction (CMC) on NDRRA Works in the Central Highlands Regional Council area. Provided Site Engineering support including the management of subcontractors, organising testing, completing quality records (managed through CivPro), collated documentation for progress claims. Works involved remove and replace pavement material, in-situ stabilisation, two-coat spray seal, concrete floodway construction.

    • Project Engineer
      • Mar 2018 - Jul 2018

      Worked with RPQ Asphalt on the Warrego Highway Resurfacing Project. Performed a Project Engineering role involving Site engineering and supervision, liaising with TMR for inspections, preparation of paving plans and lookahead programs, organising core testing. Coordinated work requirements with RPQ managers to organise asphalt crews, asphalt supply and equipment for works across multiple sites. Works involved profiling of existing pavement, deep-lift asphalt paving (AC20), corrector course (AC10), waterproof PMB seal, open-grade asphalt wearing course (OG10), guardrail removal and re-installation.

    • Site Engineer/CQR
      • Sep 2017 - Feb 2018

      Worked with WBHO Infrastructure on the Bruce Highway Intersections Upgrade Project, south of Rockhampton. Key responsibilities included:• Worked with the Site Supervisor and PM to ensure project milestones were met and the programme was adhered to.• Assisted in the procurement of subcontractors and communication with subcontractors to complete the required works.• Provided information for, and assisted in the development of, the end of month progress claims.• Provided site inductions to new personnel.• Organised testing and survey for all works including GST, embankment, subgrade, unbound pavement, cement stabilised pavement and concrete works.• Carried out Hold Point and Witness Point checks with TMR Inspector such as proof rolling, steel inspections, slump testing, drop rate tests etc.• Monitored works to ensure activities were carried out in accordance with the client’s requirements, TMR specifications and AS/NZS ISO 9001:2008.• Ensured all works were signed off by the relevant persons in the ITP checklists. • Prepared all the relevant documentation for each Lot and closed out the Conformed Lots. • Documented NCRs and promptly notified the TMR Inspector, the Administrator and the PM.• Closed out NCRs once rectification works were completed.• Prepared, verified and submitted all Lot Conformance Reports to TMR upon completion of works.

    • Site Engineer/CQR
      • Jun 2017 - Sep 2017

      Worked with Civil Mining and Construction (CMC) on the Pine Creek Road Flood Repairs Project. Provided Site Engineering and CQR support including recording daily costs, coordinating works with the PM and Supervisor, organising inspections with TMR, providing site inductions to subcontractors. The works involved cutting and filling of the river crossing, the placing of a shotcrete rock wall on both sides, pavement works with an asphalt surface, landscaping works and guardrail installation.

    • Civil Engineering
    • 1 - 100 Employee
    • Undergraduate Engineer
      • Nov 2016 - Feb 2017

      Worked as an Undergraduate Site Engineer on the Toowoomba Second Range Crossing Viaduct (Nexus). Some key responsibilities included: - Setup and maintenance of project tracking systems and registers. - Checked reinforcement and form-work deliveries to ensure compliance with the project drawings and TMR specifications. - Tracked daily labour hours and costs. - Organised and coordinated worker inductions. - Liased with Contractor Engineers during major works. Worked as an Undergraduate Site Engineer on the Toowoomba Second Range Crossing Viaduct (Nexus). Some key responsibilities included: - Setup and maintenance of project tracking systems and registers. - Checked reinforcement and form-work deliveries to ensure compliance with the project drawings and TMR specifications. - Tracked daily labour hours and costs. - Organised and coordinated worker inductions. - Liased with Contractor Engineers during major works.

Education

  • The University of Queensland
    Bachelor's Degree, Civil Engineering
    2013 - 2017
  • Brisbane Boys' College
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now