Ahmet Emrah Türker

Quality Manager at Güralp Vinç
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
İzmir, Turkey, TR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Türkiye
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Quality Manager
      • Aug 2022 - Present

      İzmir, Türkiye

    • Türkiye
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Head Of Quality Management
      • Nov 2021 - May 2022

      İzmir, Türkiye

    • Türkiye
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • QA/QC Manager & Welding Coordinator
      • Apr 2021 - Nov 2021

      Milas, Muğla, Türkiye - ISO 9001 - EN 1090-1 - EN 1090-2 - EN ISO 3834-2 - EN ISO 5817 - EN 15609-1, EN 15614-1, EN 9606-1 - ISO 13920 etc.

    • Türkiye
    • Legal Services
    • 100 - 200 Employee
    • QA/QC Manager of Doğ-Ser Makina
      • Feb 2020 - Apr 2021

      Mugla, Turkey YENİKÖY KEMERKÖY POWER PLANT - REHABILITATION PROJECT / ESP DISCHARGE SYSTEM GE & GKE Consortium Doğ-Ser Makina (I was assignmented by TÜV Austria Türk for all QA/QC works of Doğ-Ser Makina) - Controlling ESP Discharge System manufacturing and preparing the quality control file at Kemerköy Power Plant - Rehabilitation Project - QA/QC management of 'Doğ-Ser Makina' - Building the quality management system (ISO 9001, EN ISO 3834-2, EN 1090-2 Exc.3) - Preparation of all control… Show more YENİKÖY KEMERKÖY POWER PLANT - REHABILITATION PROJECT / ESP DISCHARGE SYSTEM GE & GKE Consortium Doğ-Ser Makina (I was assignmented by TÜV Austria Türk for all QA/QC works of Doğ-Ser Makina) - Controlling ESP Discharge System manufacturing and preparing the quality control file at Kemerköy Power Plant - Rehabilitation Project - QA/QC management of 'Doğ-Ser Makina' - Building the quality management system (ISO 9001, EN ISO 3834-2, EN 1090-2 Exc.3) - Preparation of all control forms, procedures, WPS, WPQR etc. for quality management system Show less

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Industrial Inspector & Expediting & Supervizor of 'INTERTEK Quality Services'
      • Sep 2018 - Feb 2020

      Izmir, Turkey GÖZTEPE STADIUM PROJECT (Gürsel Aksel Sağlıklı Yaşam ve Spor Merkezi) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the assembly of structural steels according to the standard ´EN 1090-2 EXC3´ - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Prepared daily weekly inspection reports and NCRs - Reviewed quality control files

    • Belgium
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Industrial Inspector & Expediting & Supervizor of 'TÜV AUSTRIA TÜRK'
      • Mar 2018 - Aug 2018

      Aydin, Turkey Air Cooled Condenser Steel Structure Manufacturing & Installation (LİMGAZ Buharkent Geothermal Power Plant Project) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting, galvanizing - Controlled the manufacturing of structural steels according to the standard ´EN 1090-2 EXC3´ - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized… Show more Air Cooled Condenser Steel Structure Manufacturing & Installation (LİMGAZ Buharkent Geothermal Power Plant Project) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting, galvanizing - Controlled the manufacturing of structural steels according to the standard ´EN 1090-2 EXC3´ - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Supervized on site during installation of steel structures and mechanical equipments - Prepared daily / weekly inspection reports and NCRs - Prepared punch lists - Reviewed quality control files Show less

    • Türkiye
    • Legal Services
    • 100 - 200 Employee
    • Project (inspection) Coordinator & Industrial Inspector
      • Dec 2016 - Dec 2017

      Aydin, Turkey BATISÖKE SÖKE ÇİMENTO (CEMENT) SANAYİİ T.A.Ş. - 3. Line 5.000 tons/day Capacity Clinker Production Plant and Cement Grinding, Storage and Packing Plant Investment Project - Organized the industrial inspectors that were responsible of manufacturing and coordinated the project (inspection) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the… Show more BATISÖKE SÖKE ÇİMENTO (CEMENT) SANAYİİ T.A.Ş. - 3. Line 5.000 tons/day Capacity Clinker Production Plant and Cement Grinding, Storage and Packing Plant Investment Project - Organized the industrial inspectors that were responsible of manufacturing and coordinated the project (inspection) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Controlled the mechanical assembly and piping - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Prepared daily / weekly inspection reports and NCRs - Prepared punch lists - Reviewed quality control files

    • Project (inspection) Coordinator & Industrial
      • Mar 2016 - Dec 2016

      Izmir, Turkey BATIÇİM BATI ANADOLU ÇİMENTO (CEMENT) SANAYİİ A.Ş. - Modernization of Rotary Kiln - Cooler & Revision of Rotary Kiln Gas Cooling Tower and Modernization Pre-Heaters & Clinker Conveyor Line Investment Projects - Organized the industrial inspectors that were responsible of manufacturing and coordinated the project (inspection) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting… Show more BATIÇİM BATI ANADOLU ÇİMENTO (CEMENT) SANAYİİ A.Ş. - Modernization of Rotary Kiln - Cooler & Revision of Rotary Kiln Gas Cooling Tower and Modernization Pre-Heaters & Clinker Conveyor Line Investment Projects - Organized the industrial inspectors that were responsible of manufacturing and coordinated the project (inspection) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the manufacturing and assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Controlled the mechanical assembly and piping - Witnessed to mechanical assembly supervizors - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Prepared daily / weekly inspection reports and NCRs - Prepared punch lists - Reviewed quality control files - Prepared quality control file

    • Industrial Inspector
      • May 2015 - Mar 2016

      Izmir, Turkey BATIÇİM BATI ANADOLU ÇİMENTO (CEMENT) SANAYİİ A.Ş. - Raw Dosing and Conveyor System Line Investment Project - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the manufacturing and assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Controlled the mechanical assembly and piping - Witnessed to mechanical assembly… Show more BATIÇİM BATI ANADOLU ÇİMENTO (CEMENT) SANAYİİ A.Ş. - Raw Dosing and Conveyor System Line Investment Project - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the manufacturing and assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Controlled the mechanical assembly and piping - Witnessed to mechanical assembly supervizors - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Prepared daily / weekly inspection reports and NCRs - Prepared punch lists - Prepared quality control file

    • Industrial Inspector
      • Dec 2014 - May 2015

      Aydin, Turkey BATISÖKE SÖKE ÇİMENTO (CEMENT) SANAYİİ T.A.Ş. - Roller Press & V-Seperator Investment Project - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Controlled the mechanical assembly and piping - Witnessed to mechanical assembly supervizors - Inspected the… Show more BATISÖKE SÖKE ÇİMENTO (CEMENT) SANAYİİ T.A.Ş. - Roller Press & V-Seperator Investment Project - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Controlled the mechanical assembly and piping - Witnessed to mechanical assembly supervizors - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Prepared daily / weekly inspection reports and NCRs - Prepared punch lists - Prepared quality control file

    • Germany
    • Public Safety
    • 700 & Above Employee
    • Industrial Inspector
      • May 2014 - Dec 2014

      Izmir, Turkey BATIÇİM BATI ANADOLU ÇİMENTO (CEMENT) SANAYİİ A.Ş. - Reinforcement of Pre-heater Constructions Investment Project - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the manufacturing and assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT… Show more BATIÇİM BATI ANADOLU ÇİMENTO (CEMENT) SANAYİİ A.Ş. - Reinforcement of Pre-heater Constructions Investment Project - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Controlled the manufacturing and assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Prepared daily / weekly inspection reports and NCRs - Prepared punch lists - Prepared quality control file

    • Industrial Inspector
      • Mar 2014 - May 2014

      Izmir, Turkey BATIÇİM BATI ANADOLU ÇİMENTO SANAYİİ A.Ş. Closed Clinker Stock Hall Investment Project - Controlled the assembly of structural steels according to the standard ´EN 1090-2 EXC2´ - Inspected the weldseams according to the standard ´EN ISO 5817´ - Organized NDT activities and checked the NDT reports - Prepared daily / weekly inspection reports and NCRs - Prepared punch lists - Prepared quality control file

    • Quality Control Engineer & Welding Engineer & Industrial Inspector
      • Jun 2013 - Mar 2014

      Izmir, Turkey - Industrial Inspector of projects (FOLKART Bayraklı Twin TOWERS – structural steels, MIKROPUL – ındustrial filters, VENTECH - pressure vessels) as a third party - Responsible of manufacturing and quality of companies such as MICHA, TEKOMPUK, PAGETEL, CANTEK, DİKKAN VANA, DOĞUŞ VANA, EKSAŞ EKSAN etc. - Prepared WPS, WPQR and welder certificate accroding to standards EN and ASME. - Organized and performed preparing test specimens, testing and reporting of mechanical tests according… Show more - Industrial Inspector of projects (FOLKART Bayraklı Twin TOWERS – structural steels, MIKROPUL – ındustrial filters, VENTECH - pressure vessels) as a third party - Responsible of manufacturing and quality of companies such as MICHA, TEKOMPUK, PAGETEL, CANTEK, DİKKAN VANA, DOĞUŞ VANA, EKSAŞ EKSAN etc. - Prepared WPS, WPQR and welder certificate accroding to standards EN and ASME. - Organized and performed preparing test specimens, testing and reporting of mechanical tests according to releated standards - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Prepared reports in English - Responsible of radiation protection Show less

    • Türkiye
    • Mining
    • 700 & Above Employee
    • Industrial Inspector of 'TÜV SÜD'
      • Sep 2012 - Jun 2013

      Izmir, Turkey İSDEMİR (ERENCO & ERDEMİR) - Quality control of all manufacturig steps of Ladles for İsdemir’s Steelworks (Controlled the manufacturig of 6 pieces (ladles) at ASMAŞ in İzmir) - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination)

    • Italy
    • Professional Services
    • 700 & Above Employee
    • Industrial Inspector of 'IIES'
      • Aug 2012 - Aug 2012

      Izmir, Turkey - Yeni Elektrik Üretim A.Ş. (Controlled the ducts that manufactured by HAVATEK)

    • Türkiye
    • Computers and Electronics Manufacturing
    • 700 & Above Employee
    • Production Engineer
      • Feb 2012 - Jul 2012

      Manisa, Turkey - Responsible of Smart Board production (project : FATİH) - Responsible of LGP (light guide plate) production - Organized production lines and charged employees - Arranged increasing actions for production score/ hour

    • Technical Office Engineer & Welding Engineer
      • Jul 2010 - Feb 2012

      - Prepared WPS, WPQR and welder certificate (WPQ) according to releated standards EN and ASME. - Organized and performed preparing test specimens, testing and reporting of mechanical tests according to releated standards - Reported the Radiographic, Ultrasonic, Dye-penetrant, Magnetic Particle and Visual examinations according to releated standards EN and ASME. - Performed Dye-floresan penetrant, Magnetic-floresan magnetic particle testing and visual examination - Prepared price… Show more - Prepared WPS, WPQR and welder certificate (WPQ) according to releated standards EN and ASME. - Organized and performed preparing test specimens, testing and reporting of mechanical tests according to releated standards - Reported the Radiographic, Ultrasonic, Dye-penetrant, Magnetic Particle and Visual examinations according to releated standards EN and ASME. - Performed Dye-floresan penetrant, Magnetic-floresan magnetic particle testing and visual examination - Prepared price quote and purchased - Prepared the invoices form of performed jobs - Qaulity control responsible or ındustrial inspector of project-based as a second or third party - Controlled the documentation (metarial certificates, WPQ, WPS, WPQR etc.) - Controlled the fit-up, dimensions, weldseams (visual examination), sandblasting and painting - Organized NDT activities - Planning of project-based quality activities Show less

Education

  • Orta Doğu Teknik Üniversitesi (Middle East Technical University – Ankara & DVS GSI SLV München)
    Bachelor of Engineering - BE, International Welding Engineering
    2009 - 2009
  • Sakarya Üniversitesi
    Bachelor of Engineering - BE, Metallurgical and Materials Engineering
    2004 - 2008
  • Milli Piyango Anatolian High School
    High School, Science-Maths
    1996 - 2003

Community

You need to have a working account to view this content. Click here to join now