Ahmed Taha
Project Manager at National Aluminium - GINCO Group of Companies- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
National Aluminium - GINCO Group of Companies
-
United Arab Emirates
-
Construction
-
1 - 100 Employee
-
Project Manager
-
Jul 2022 - Present
- Position: Project Manager. - Project: GINCO Properties Residential and commercial Building-Dubai Hills.- Employer: GINCO Properties- Engineer: DATUM Engineering consultant.- Main Contractor: GINCO general contracting LLC.
-
-
Project Manager
-
Sep 2021 - Jun 2022
- Position: Project Manager. - Project: Collective 2.0.- Employer: Dubai Hills Estate. - Engineer: bhns Engineering consultant.- Main Contractor: GINCO general contracting LLC.
-
-
Project Manager
-
Apr 2020 - Sep 2021
- Position: Project Manager. - Project: The Cove Plot20 - Dubai Creek Harbour. Three Blocks ( BJ,BC and BD).- Employer: Emaar Properties.- Engineer: Holford & Associates.- Main Contractor: Nurol LLC.https://properties.emaar.com/en/properties/the-cove/.
-
-
Project Manager
-
Feb 2019 - Apr 2020
- Position: Project Manager. - Project: Aloft AlRaffa Hotel & Element.- Employer: Wasl Management Group. - Engineer: BURO KLING Consultants.- Facade Consultant: Priedemann.- Leed Consultant : Salimus Consultancy DMCC.- Main Contractor: ASGC Group.https://www.linkedin.com/posts/asgcuae_asgc-asgcgroup-expectmore-activity-6744229475975790592-2tt8/
-
-
-
-
Project Manager
-
Mar 2018 - Feb 2019
- Position: Project Manager. - Project: . Building 53 - Fifth Settlement - New Cairo. . 5 Villas at Gharb EL-Golf – New Cairo.- Employer: DCB consultant Qatar and Building future for real estate investment Egypt.- Engineer: DCB consultant Qatar.- Main Contractor: Building future for real estate investment - Position: Project Manager. - Project: . Building 53 - Fifth Settlement - New Cairo. . 5 Villas at Gharb EL-Golf – New Cairo.- Employer: DCB consultant Qatar and Building future for real estate investment Egypt.- Engineer: DCB consultant Qatar.- Main Contractor: Building future for real estate investment
-
-
-
United Arab Aluminium Company
-
Saudi Arabia
-
Wholesale Building Materials
-
1 - 100 Employee
-
Site Manager
-
Mar 2017 - Feb 2018
- United Arab Aluminum Company Qatar (UAAC). March 2017 → February 2018. http://www.qd-cpc.com ▪ Doha Metro Red line south Elevated & At Grade Project – Qatar. - Position: Site Manager.- Project: Metro Red line Wakra Station. - Employer: Qatar Rail ways Company. - Design and Build. - Main Contractor: FCC construction S.A. – Yuksel Insaat A.S. – Archirodon construction (Overseas) Company S.A. Joint Venture (FYAP JV). - United Arab Aluminum Company Qatar (UAAC). March 2017 → February 2018. http://www.qd-cpc.com ▪ Doha Metro Red line south Elevated & At Grade Project – Qatar. - Position: Site Manager.- Project: Metro Red line Wakra Station. - Employer: Qatar Rail ways Company. - Design and Build. - Main Contractor: FCC construction S.A. – Yuksel Insaat A.S. – Archirodon construction (Overseas) Company S.A. Joint Venture (FYAP JV).
-
-
-
Alumco LLC
-
United Arab Emirates
-
Construction
-
100 - 200 Employee
-
Project Engineer (acting as a site manager)
-
Nov 2015 - Feb 2017
Work as Project Engineer. (acting as a site manager Building 1 and 2)- Project : Sama Beirut.- Employer : Antonios Projects.- Engineer : D.G.Jones & Partners.- Facade Consultant : Meinhard group.- Leed Consultant : erga group.- Main Contractor : Man Enterprise.
-
-
Project Engineer (acting as a site manager)
-
Dec 2013 - Nov 2015
Work as Project Engineer (acting as a site manager).- Project : Damac Tower.- Employer : DAMAC Properties.- Consultant: erga Management. - Facade Consultant: Emmer Pfenninger partner AG.- Main Contractor: Man Enterprise.Project Eng. // Site Manager Job Description- Overseeing installation process and Follow the progress.- Setting out sites and organising facilities- Supervising contracted staff- Chase the site requirements of raw materials and equipment- Ensuring projects meet agreed specifications, budgets or timescales- liaising with clients, subcontractors and other professional staff- Checking and preparing site reports, designs and drawings.- Providing technical advice; problem solving.- Ensuring site safety.
-
-
Site Engineer and Technical coordinator
-
Nov 2011 - Dec 2013
Work as site Engineer , QS Eng. , Technical coordinator.- On '' Ministry of Education HQ Project ''- Kuwait.- Main Contractor: Mohamed Abdulmohsin Kharafi & Sons.- Consultant: Cambridge 7 Assocites – in association with Gulf consult.# Site engineer.- Overseeing installation process and Follow the progress.- Setting out sites and organising facilities- Supervising contracted staff- Chase the site requirements of raw materials and equipment- Ensuring projects meet agreed specifications, budgets or timescales- liaising with clients, subcontractors and other professional staff- Checking and preparing site reports, designs and drawings. - Providing technical advice; problem solving.- Ensuring site safety.# QS Eng. -Submit progress report every month show material and installation status to head office. Then Prepare the monthly payment and submit it to the main contractor.- keep track of any variations to the contract that may affect costs and create reports to show profitability. # Technical coordinator.-Coordinate between the Design dep. In head office and Consultant, main contractor and another subcontractors to achieve the desired results.- Prepare Material submittals for approval.http://www.newkuwaitgov.com/project.php?post_id=48
-
-
Site Engineer and Technical coordinator
-
May 2013 - May 2013
Done Performance test - MOE Mock up.At Thomas Bell Wright international consultant Lab Dubai.
-
-
-
Alico Egypt for Aluminum
-
Egypt
-
Construction
-
200 - 300 Employee
-
Material controller - Team leader
-
May 2008 - Nov 2011
Work at the technical department as a material controller - QS.Eng.1-Analyzing tender documents and drawings, Calculate quantities and areas for each item according to contract drawing and scope of work, compare the results with the BOQ, Create report for any differences.2-Calculate all the materials needed to cover the project according to the approved shop drawing. (Bracket-Alum. profiles -gasket-Bolts-Silicon-accessories –Alum. Sheets-S.steel sheets-Cladding sheets-Glass sheets). With an attempt to use the free stock materials, Preparing material allocation sheet and release purchase order.3-Study the work order to determine the required raw material with their cutting list using optimization program in order to get the best way of cutting, Identify the required material for manufacturing and the required material for installing and check their availability in the stock, Follow up with the purchasing department in case of material unavailability in stock, Issue indent “including manufactured material and installed material to factory and site.4-Coordinate between the material department and the rest of departments like planning and projects, production, purchasing and the estimation.Projects involved:1-Casablanca hotel –Morocco.2- Cairo festival city.3- Mall of Africa.4-Bnp bank. 5- HSBC bank.6-Alex. Bank. 7-Oman embassy.8-Kuwait embassy.9-Saudi embassy.10- Tanta hospital. 11-Misr clearing building.12- Sphinx glass factory. Building in smart village → 13- EFG Hermes.14-HC building.15-Cich building.16-Act building.17-Amwal building.18-smart school ph3.19- Chambers of commerce.20- Corplease building.
-
-
-
-
Site Eng. - Quantity surveyor engineer
-
Dec 2007 - May 2008
EL Katamia waste water Treatment plant EL Katamia waste water Treatment plant
-
-
Education
-
Faculty of Engineering
Bachelor of Architecture (B.Arch.), Architecture -
Modern Hossam el - Din School