Ahmed Saeed

Zone Manager at QD-SBG Construction
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Egypt, EG
Languages
  • Arabic Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Plumbing Works
    E.H
    Sep, 2016
    - Oct, 2024
  • Revit MEP
    Kemet Corporation
    Nov, 2015
    - Oct, 2024
  • Fire Fighting Protection
    A.O.C
    Jul, 2012
    - Oct, 2024
  • HVAC System
    A.O.C
    Jun, 2012
    - Oct, 2024
  • AutoCAD
    YAT Software
    Nov, 2006
    - Oct, 2024

Experience

    • Qatar
    • Construction
    • 500 - 600 Employee
    • Zone Manager
      • Oct 2018 - Present

      ✓ Overseeing and directing construction projects from conception to completion, Coordinate and direct construction workers and subcontractors, meet contractual conditions of performance, Review the work progress daily and Ensure quality construction standards and the use of proper construction techniques ✓ Overseeing and directing construction projects from conception to completion, Coordinate and direct construction workers and subcontractors, meet contractual conditions of performance, Review the work progress daily and Ensure quality construction standards and the use of proper construction techniques

    • Qatar
    • Construction
    • 1 - 100 Employee
    • Construction Manager
      • Jul 2018 - Sep 2018

      ✓ Overseeing and directing construction projects from conception to completion, Coordinate and direct construction workers and subcontractors, meet contractual conditions of performance, Review the work progress daily and Ensure quality construction standards and the use of proper construction techniques ✓ Overseeing and directing construction projects from conception to completion, Coordinate and direct construction workers and subcontractors, meet contractual conditions of performance, Review the work progress daily and Ensure quality construction standards and the use of proper construction techniques

    • Bahrain
    • Construction
    • 400 - 500 Employee
    • Sr. Mechanical Engineer
      • Dec 2016 - Jul 2018

      ✓ Installing and supervising of HVAC, firefighting and plumbing systems, coordinate with the other MEP works, obtain the approval of works executed, prepare and review the technical reports as per the site progress and covering it by the quantity survey team, coordinate and follow up with the suppliers to make sure receiving all the material on time and make sure that the material is well controlled and organized in the stores, make sure that all the manpower is following and applying the safety procedures in the site by performing all the required permits and strictly following the safety procedures and follow the manpower budget. ✓ Design (heat load calculation, HAP, ducting and piping design, and equipment selection), design review, preparing the shop drawings, ESP, material submittals, material tack-off, BOQ, providing quotations, price comparison, calculating the manpower budget and project cost estimation). Show less

    • Human Resources Services
    • Senior Mechanical Engineer
      • Jul 2015 - Nov 2016

      ✓ Installing and supervising of HVAC, firefighting and plumbing systems, coordinate with the other MEP works, obtain the approval of works executed, prepare and review the technical reports as per the site progress and covering it by the quantity survey team, coordinate and follow up with the suppliers to make sure receiving all the material on time and make sure that the material is well controlled and organized in the stores, make sure that all the manpower is following and applying the safety procedures in the site by performing all the required permits and strictly following the safety procedures and follow the manpower budget. ✓ Design (heat load calculation, HAP, ducting and piping design, and equipment selection), design review, preparing the shop drawings, ESP, material submittals, material tack-off, BOQ, providing quotations, price comparison, calculating the manpower budget and project cost estimation). Show less

    • Senior Project Engineer
      • Jan 2015 - Jun 2015

      ✓ Installing and supervising of HVAC, firefighting and plumbing systems, coordinate with the other MEP works, obtain the approval of works executed, prepare and review the technical reports as per the site progress and covering it by the quantity survey team, coordinate and follow up with the suppliers to make sure receiving all the material on time and make sure that the material is well controlled and organized in the stores, make sure that all the manpower is following and applying the safety procedures in the site by performing all the required permits and strictly following the safety procedures and follow the manpower budget. ✓ Design (heat load calculation, HAP, ducting and piping design, and equipment selection), design review, preparing the shop drawings, ESP, material submittals, material tack-off, BOQ, providing quotations, price comparison, calculating the manpower budget and project cost estimation). Show less

    • Senior Project Engineer
      • Apr 2014 - Jan 2015

      ✓ Installing and supervising of HVAC, firefighting and plumbing systems, coordinate with the other MEP works, obtain the approval of works executed, prepare and review the technical reports as per the site progress and covering it by the quantity survey team, coordinate and follow up with the suppliers to make sure receiving all the material on time and make sure that the material is well controlled and organized in the stores, make sure that all the manpower is following and applying the safety procedures in the site by performing all the required permits and strictly following the safety procedures and follow the manpower budget. ✓ Design (heat load calculation, HAP, ducting and piping design, and equipment selection), design review, preparing the shop drawings, ESP, material submittals, material tack-off, BOQ, providing quotations, price comparison, calculating the manpower budget and project cost estimation). Show less

    • Senior Project Engineer
      • Apr 2010 - Apr 2014

      ✓ Installing and supervising of HVAC, firefighting and plumbing systems, coordinate with the other MEP works, obtain the approval of works executed, prepare and review the technical reports as per the site progress and covering it by the quantity survey team, coordinate and follow up with the suppliers to make sure receiving all the material on time and make sure that the material is well controlled and organized in the stores, make sure that all the manpower is following and applying the safety procedures in the site by performing all the required permits and strictly following the safety procedures and follow the manpower budget. ✓ Design (heat load calculation, HAP, ducting and piping design, and equipment selection), design review, preparing the shop drawings, ESP, material submittals, material tack-off, BOQ, providing quotations, price comparison, calculating the manpower budget and project cost estimation). Show less

    • Computer and Network Security
    • 400 - 500 Employee
    • Reserve Officer (Site Engineer)
      • Dec 2008 - Apr 2010

      Responsibilities including design review, approval of shop drawings and material submittals; supervising and installing of HVAC and firefighting system. Responsibilities including design review, approval of shop drawings and material submittals; supervising and installing of HVAC and firefighting system.

    • Site Engineer
      • Apr 2007 - Dec 2008

      Responsibilities including design, preparing shop drawings and installing of HVAC and firefighting systems. Responsibilities including design, preparing shop drawings and installing of HVAC and firefighting systems.

  • EAST DELTA TRAVEL (EDT)
    • Cairo Governorate, Egypt
    • Maintenance Engineer
      • Oct 2006 - Apr 2007

      • Complete major overhauling for (Diesel engines and oil pumps) • Firing various regular reports (monthly maintenance). • Prepare and control the maintenance cost. • Cover and implement the spare part issue according to needs • Complete major overhauling for (Diesel engines and oil pumps) • Firing various regular reports (monthly maintenance). • Prepare and control the maintenance cost. • Cover and implement the spare part issue according to needs

Education

  • Ain Shams University
    HVAC Diploma, Heating, Ventilation, Air Conditioning and Refrigeration Engineering Technology/Technician
    2014 - 2016
  • Ain Shams University
    BACHOLER DEGREE OF MECHANICAL POWER ENGINEER, Mechanical Engineering
    2001 - 2006

Community

You need to have a working account to view this content. Click here to join now