ahmed mohamed

Electrical Engineer at NECE
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jiddah, Makkah, Saudi Arabia, SA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Electrical Engineer
    • Electrical Engineer
      • Feb 2020 - Present

      *PROJECTS (KSA). -measuring components , instrument , equipment , circuit breaker , cables , simple relay , control scheme check , switchgear scheme check (elfanar, ABB, Simenes) , control panels , Scheme Check GIS (HAYSUNG , HYUNDAI) AT (airport Jeddah) substitution 110/13.8KV .- engineering of testing and commissioningOF measuring components , instrument , equipment , circuit breaker , cables , simple relay , control scheme check , switchgear scheme check , control panels , GIS AT JEDDAH (ARAFAT EXT-1) S/S110/13.8KV.-measuring components , instrument , equipment , circuit breaker , cables , simple relay , control scheme check , switchgear scheme check (elfanar, ABB, Simenes) , control panels , Scheme Check GIS (HAYSUNG , HYUNDAI) AT JEDDAH ( MODON ASFAN) s/s 110/13.8KV.-measuring components , instrument , equipment , circuit breaker , cables , simple relay , control scheme check , switchgear scheme check (elfanar, ABB, Simenes) , control panels , Scheme Check GIS (HAYSUNG , HYUNDAI) AT Mekkah ( ARAFAT 3) s/s 110/13.8KV.-measuring components , instrument , equipment , circuit breaker , cables , simple relay , control scheme check , switchgear scheme check (elfanar, ABB, Simenes) , control panels , Scheme Check GIS (HAYSUNG , HYUNDAI) AT JEDDAH ( FAWAZ HOUSING 2) s/s 110/13.8KV.- cables & bus bar HIPOT test.-primary injection up to relay end.- sensitivity & stability test .-dc scheme & trip logic cheek -trip coil supervision circuit & current measurement cheek.- Contact Resistance Test.- Insulation Resistance Testing / Megger Testing.- Close loop test.- Protection relays testing .- Switchgear scheme test.-GIS Scheme cheek test.- Control room scheme cheek test.*Senior construction project engineer .• Job Description:_Saudi Arabia Projects, working in project as:• Installation and supply (RMU )in 3 sites of the Ministry of Defense (Riyadh) . Show less

    • Electrical Engineer
      • Feb 2020 - Present

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Electrical Engineer
      • Jan 2016 - Present

      ➢ EGYPTION POWER SYSTEM COMPNY (EPS) ➢ OVHL ENGNIEER • Job description : -creating new transmation line 500 kv from borols sub station to abo el matamer 500 kv OHL implementing of China Electric Equipment and Technology co., LTD (CET) Construction of a power line of 125 km and 400 electricity towers. 6-creating new transmation line 500 kv from MGHAGHA sub station to 6 OCTOBER S/S 500 kv OHL implementing of China Electric Equipment and Technology co., LTD (CET) Construction of a power line of 300 km and 620 electricity towers. Show less

    • Ukraine
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer
      • Jan 2013 - Present

      ➢ ZTZ (UKRIN COMPNY) ➢ SITE ENGNIEER • Job description : 1-Repairing 4 transformers 500 kv in naga hmadi sub station. ( 1 JAN. 2014 until march. 2014) 2-repairing 3 transformers 500 kv in samlot sub station (1may. 2014 until 15 jon. 2014) 3-reparing 3 transformers in Cairo 500kv sub station (1jul. 2014 until 1Aug.2014 ) 4-make condition assessment in factory of aluminum ( 25 seb.2014 until 30 oct.2014 ) 5-make condition assessment in dwmo sub station GIS 220 KV and rehabilitation for transformer 220/132/66 kv. • Job description : -Participating in delivery, installation and tests ( SEL751A over current relay) - Participating in delivery and installation(SEL849 motor protection relay) - Participating in delivery and installation ( Reason fault recorder ) - Performing all periodic and routine maintenance on all types of power transformers different models, capacity and voltage from 500 Kv until 11 Kv -performing all major maintenance , repair and rehabilitation of different transformers including all works of jaw and installation of the transformer parts ( active part) -Performing all drying operations of transformer files using the latest drying methods (Hot oil spray method) -Performing routine tests for transformers before put it on -repairing cool sets of transformers including different motors and pumps Show less

    • China
    • Technology, Information and Internet
    • 100 - 200 Employee
    • Electrical Engineer
      • Jan 2013 - Jan 2015

      ➢ QC Manger • Job description : -creating new transmation line 500 kv from marsa alam sub station to abo ele qousir 500 kv OHL implementing of China Electric Equipment and Technology co., LTD (CET) Construction of a power line of 100 km and 325 electricity towers. ➢ QC Manger • Job description : -creating new transmation line 500 kv from marsa alam sub station to abo ele qousir 500 kv OHL implementing of China Electric Equipment and Technology co., LTD (CET) Construction of a power line of 100 km and 325 electricity towers.