Ahmed fouad. CPRE,PMP,PE,LEED,GBES,PCEO and Consultant Engineer

Head Of Project Management Office , Supervision Department at Amr Abdelrahman Consultant Engineers (AACE)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cairo, Egypt, EG
Languages
  • Arabic, English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Professional Resident Engineer. (CPRE) from American Academy of Project Management 2015. 2. PMP Project Management Professional. 3. Professional Engineer in the Field Of Civil Engineering Dated 2007
    -

Experience

    • Egypt
    • Civil Engineering
    • 1 - 100 Employee
    • Head Of Project Management Office , Supervision Department
      • Apr 2022 - Present

      Head Project Management Office "PMO Head" Supervision Department ; my task in the projects as following; Represent AACE in all external aspects related to the project. Manage, track and control the performance of department employees and project managers. regular coordination meeting system shall be implemented for all projects,Continuous coordination among all parties related to the project to ensure the efficient implementation of all work, and strive to solve all problems and remove obstacles in the workflow.track the project related activities of major officer and experts and consultants from or outside the office.

    • Projects Manager
      • Jan 2019 - Jul 2022

      Project : Oriana IV 171 Villas and associated Works_ Value 500 million LEClient : Al Futtaim for Residential Resorts Development_Cairo Festival City Designation : Project Manager.Responsibilities: Head of site supervision team assigned and Familiar with all aspects of CFC and AACE Quality System, in particular the Quality Manual, the Procedures Manual and applicable Work Instructions. Broadly speaking and Approving Structural shop drawings ,method statements and materials. Coordinating structural ,architectural and MEP, Infrastructural , SoftScape and Hardscape. Works, Quality Control& quality assurance, Monitoring posttensioning , Following the estimated time schedule for the project and maintaining control over the work by measuring performance and determining if there are any variances from the plan Overall, .

    • Resident Engineer
      • May 2016 - Dec 2018

      Client : Al-Futtaim Group Real Estate -AFGREProject : Oriana 1 Project Value : 260,000,000 ELHead of site supervision team assigned to a particular project. Familiar with all aspects of AACE Quality System, in particular the Quality Manual, the Procedures Manual and applicable Work Instructions. Broadly speaking and Approving Structural shopdrawings,method statements and materials.Coordinating structural,architectural and MEP works,QualityControl&qualityassurance,Monitoring posttensioning Works .

    • Kuwait
    • Construction
    • 500 - 600 Employee
    • Resident Engineer
      • Aug 2006 - Jul 2016

      1- HAWALLY COURTS COMPLEX –Client: Ministry of Public Works SPAValue of the project 43,346,888 Million KDThe Hawally Court Complex is project land area 9000M2The project are consists of 3 Basements and26 story tower building with Supreme Court, Administration, and Criminaland General Prosecution and Private Parking. The approximate floor built-uparea will be around 143,676 m². Total area is as listed below:1) Parking 71622 m², Court 72054 m²,. Landscape 2473 m²and Roof Garden 5435 m²2) External site works, such as external services, comprising fresh water supply, chilled water pipes, foul water drainage, storm water drainage and Grey Water System 3) External lighting, soft and hard landscaping, site furnishing, gate and fence including all service roads.4) Architectural woodworks, doors and windows.5) Exterior Finishes stone cladding (terracotta) and Exterior aluminum spandrel panel system with Blast load ( wind and bomb load ) 6) Fixed furniture, Loose furniture, signage, window treatment7) Conveying system 23 elevators and 2 Escalators.8) Public health services and firefighting system.9) HVAC system and building automation system. 4 Nos. water cooled centrifugal chillers, 2 Nos. Ice Chillers with Ice Storage System.10) Electrical power system, lighting, fire alarm system, telephone, audiovisual11) system, public address, security and access control system,12) CCTV system, solar power generation system and integration with sound building system.2- Residence Inn Marriott–Hotel sharq gulf streetClient : Salhia /United Family Co.Value of the project 10.00 Million KD-total Area of the project land1522.38m2The hotel are consists of-3 Basements (2 basements parking and one basement serves- Ground Floor restaurant 90 Seats-First floor/ Business center and Marriott staff office-Second floor/ Meeting room and leisure center-3th floor to 15th floor (148 typical guest room )-16th floor ( 2 Amiri suite area180m2 )

    • Senior Structural Engineer
      • Aug 2006 - Jan 2012

      1-Senior Structural Engineer in project Construction of Al-Sedeeq neighborhood center Value of project:12.960 million KDClient :Ministry of public works. 2- Senior Structural Engineer in project Central Bank of Kuwait New Head quarter Building -CBK Value of project: 123 Multi story building 43 floor with 3 basement total height 239m , 4 floor car bark , 76000.m3 concrete and 15000 ton steel structural .0 million KD ,Multi story building 43 floor with 3 basement total height 239m , 4 floor car bark , 76000.m3 concrete and 15000 ton steel structural 3- Construction of a sports club for the deaf(hearing impaired)Value of project:5.850 million KDClient :Ministry of public works.4-College Of Basic Education Girls Campus-KuwaitValue of project:38 million KDClient: Public authority for applied education training 5- AVENUES PHASE Ι PROJECT. Supervision on spatial projects having modifications & amendments:my duties: were to supervise the demolishing of some beams long18.0m, slabs and column and add some steel beams and stair according to client's modification.To remove these slabs and beams I was obliged to strength all the used (CFRP plates)''Sika®carbodur® plates'' application procedure of flexural strengthening for beams span 18.00m top. And bottomUsing also ''sikawrap®- 600c/120+sikadur ®300''for structural shear strengthening for columnsAnd inject deep cracks wider than 0.25mm with ''sikadur-52'' injection reason.

    • Civil Engineer and Design Engineer
      • Apr 2005 - Oct 2006

      Al-Salam Neighborhood Center Value of project:5.950 million KDClient :Ministry of public works (MPW).CPA-Total Area of project 56000 m2 Is the whole area of 5 building consists of 1-Super Market Shops 2-Social Development Center 3- Police Station 4-Post Office 5-Library &Land Scab Area And substation building-Analysis and design, & Evaluation for various project Like Al-Nagat School& various villa Al-Salam Neighborhood Center Value of project:5.950 million KDClient :Ministry of public works (MPW).CPA-Total Area of project 56000 m2 Is the whole area of 5 building consists of 1-Super Market Shops 2-Social Development Center 3- Police Station 4-Post Office 5-Library &Land Scab Area And substation building-Analysis and design, & Evaluation for various project Like Al-Nagat School& various villa

    • Kuwait
    • Civil Engineering
    • 1 - 100 Employee
    • Civil Engineer and Design Engineer
      • Aug 2004 - Dec 2005

      Zakat House Headquarters BuildingValue of project:4.50 million KDClient :Ministry of public works (MPW).SPA-Total Area of project 24816 m2 was the whole area of the building consists of 4 Floors and 2 Basement And land scab area on basement roof & elevation finishing of building consists of precast concrete cladding and curtain wall and aluminum cladding-Analysis and design, & Evaluation for various project Zakat House Headquarters BuildingValue of project:4.50 million KDClient :Ministry of public works (MPW).SPA-Total Area of project 24816 m2 was the whole area of the building consists of 4 Floors and 2 Basement And land scab area on basement roof & elevation finishing of building consists of precast concrete cladding and curtain wall and aluminum cladding-Analysis and design, & Evaluation for various project

    • Egypt
    • Construction
    • 700 & Above Employee
    • Technical Office Engineer
      • Mar 2002 - Aug 2004

      1-Head Quarters of Egyptian Company for Communications (B7&B75)Value of project:100 million LETotal Area of project 11000 m2 was the whole area of the building consists of 3 Floors and 2 basements shaped as 3 pyramids along each other and joined with an underground parking of 4000 m2 consists of 2 Floors The Job was Preparing the work sharp drawings for the projects Restriction works for the projects2- Egypt Liquefy Natural Gas (LNG Plant) - DamiettaValue of project:1.25 Billion $Client :SEGASConstruction the Concrete Foundation (Pile Caps) for the main steelStructural Pipe Rack about 7,500 m3 of reinforcement concrete Construction of the main 3 Turbine Compressor Foundations 2,500m3Concrete Paving about 27,000 m2Construction of Elec. & Instrument Trenches.construction of the underground piping (HDPE, GRVE, Carbon Steel) & the work manhole

    • Design Engineer
      • Jan 2000 - Aug 2002

      Analysis and design, & evaluationfor various project like :-Project of construction hall no. 3 inshowing area NasrCity – CairoProject of Shemoa Hospital in New Cairo.In additional of Residential & villas ProjectsSupervision of head quarters& factories.Review the design drawing for multi projects Analysis and design, & evaluationfor various project like :-Project of construction hall no. 3 inshowing area NasrCity – CairoProject of Shemoa Hospital in New Cairo.In additional of Residential & villas ProjectsSupervision of head quarters& factories.Review the design drawing for multi projects

Education

  • Ain Shams University
    Bachelor’s Degree, structural division of Civil
    1995 - 2000

Community

You need to have a working account to view this content. Click here to join now