Ahmed Abdellatif

HV Substations Secondary Design Team Leader at Jawda Engineering Consultants - JEC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
El Sheikh Zaid, Al Jizah, Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Design Services
    • 1 - 100 Employee
    • HV Substations Secondary Design Team Leader
      • Nov 2022 - Present

    • HV Substation Senior Secondry Design Engineer
      • Feb 2022 - Nov 2022

      Projects:1-Ar-Rass 9095 380/132/13.8 KV. 2-DIC-3 115/33KV3-SARRAR 115/33KV. Key Responsibilities1-prerpare Substations Operational Single Line Diagram.2-prerpare Substations CT/VT Single Line Diagram.3-Prepare Relay and metering one line diagram.4-Prepare protection logic diagram.5-Prepare Interlocking Digram.6-Prepare complete AC package including Station service transformer sizing, CB, cable Sizing, SLD, Short circuit calculation and BOQ.7-Prepare complete DC package including Battery and Battery charger sizing, CB sizing, Cable sizing, SLD and BOQ.8-Review offers for Protection and control panels.9-prepare CT and VT sizing calculations.10-prepare Alarm point list including Scada, TFR, SOE and ANN.11-Prepare Relay setting.12-Prepare Cable schedule for cable termination.

    • Egypt
    • Construction
    • 700 & Above Employee
    • Senior Control and Protection Design Engineer
      • Aug 2020 - Jan 2022

      1-Prerpare Substations Operational Single Line Diagram.2-Prerpare Substations CT/VT Single Line Diagram. 3-Prepare Relay And Metering One Line Diagram. 4-Prepare Protection Logic Diagram. 5-Prepare Interlocking Digram. 6-Prepare CT And VT Sizing Calculations. 7-Prepare Alarm List Including . 8-Prepare Cable list 9-Review all submittals before sending to the client. Projects:1-Toshka 220/66/22KV S/S. 2-Elmasaied 220/66/22KV S/S. 3-Elsheikh Zoweid 66/22KV S/S. 4-Sarai 220/22/22KV S/S. 5-Badr Prison PV plant. 6-Wadi El-natroon PV plant.

    • Saudi Arabia
    • Utilities
    • 200 - 300 Employee
    • Testing and commissioning Engineer
      • Feb 2015 - Jul 2020

      (Approved from Saudi Electrical Co.(SEC) on LV,MV,HV and EHVSWGR scheme ,components,Primary and stability, simple andadvanced relays)• Knowledge of test equipments as Freja 300, CT analyzer, contact resistance, CPC100, Power supply unit(B10), Sverker760,EGIL CB timing,CT primary injection,DS-ES 10KV tester,HV test for MV SWGR (up to 100kv) .• Testing and commissioning protection panels forOHTL ,transformer ,UGC ,CBF , Bus bar , synchronizing , AVR , ACCS , ABTS , load shading ,Capacitors• Testing and commissioning most of protective relays like,Transformer differential ( like :ABB RET670,Micom P643, SEL487E)Line protection (like:Micom P546,ABB RED670)Main relays (Siemens Argus ,SIEMENS 7SJ,ABB REF615, REC670Micom P142)Synchronizing relays (KAVS100, MICOM P143,SEL451)Load shading relays (Micom P142 )Bay control units (BCU) (ABB REC670 ,REF615, SEL451)• Non linear resistor test.• CT & VT test.• CT & VT secondary injection loop test • Primary injection.• Busbar stability test.• Transformer stability test..• Medium Voltage SWGR High Voltage test.• Checking all alarm circuit panels working at substation.• Troubleshoot any problem may happen at any protective relays.• Testing many types of auxiliary relays,meters and timers.• Testing and commissioning HV equipment like CTs, VTs ,CBs.• Commissioning of 13.8 ,33 Kv SWGR (ABB,Siemens ,Schneider).• Commissioning of 33,110,132,380 Kv GIS (ABB, seimens ,Hyundai , Hyusong).• Testing of ACDB/DCDB panels.Projects list :KHULAIS 380/110/13.8 KV – KHULAIS–2015ISLAMIC UNIVERSITY 110/13.8 KV– MEDINA –2015ALBAYDAA 110/13.8 KV – MEDINA – 2015OHOUD 110/13.8 KV – MEDINA – 2015MEDINA CENTRAL 380/110/13.8 KV– MEDINA – 2016KHALIDYA -2 132/13.8 KV– NAJRAN –2016KHUZAM 380/110/13.8 KV – Jeddah – 2016BALGARN 132/33 KV – Aseer – 2017,2018SWCC power plant - Yanbu Industrial City - 2019Aramco JRP SS028 - SS129 (380 KV) - Jazan Economic City - 2019Aramco SS410 13.8KV-JEC-2020

    • Secondary Design Engineer
      • Jan 2013 - Dec 2014

      1-Prerpare Substations Operational Single Line Diagram. 2-Prerpare Substations CT/VT Single Line Diagram. 3-Prepare Relay And Metering One Line Diagram. 4-Prepare Protection Logic Diagram. 5-Prepare Interlocking Digram. 6-Prepare Complete AC Package Including Station Service Transformer Sizing, CB, Cable Sizing, SLD, Short Circuit Calculation And BOQ. 7-Prepare Complete DC Package Including Battery And Battery Charger Sizing, CB Sizing, Cable Sizing, SLD And BOQ. 8-Review Offers For Protection And Control Panels. 9-Prepare CT And VT Sizing Calculations.10-Prepare Alarm Point List Including SAS ,Scada, TFR, SOE And ANN. 11-Prepare Cable Schedule For Cable Termination.

Education

  • Helwan University Cairo
    Very good, Engineering
    2007 - 2012
  • Refaa Altahtawy secondry school
    95.1%, Secondary Education and Teaching
    2005 - 2007

Community