Ahmar Khan

Senior Plant Manager at Young's (Private) Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Karachi Division, Sindh, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Food and Beverage Services
    • 300 - 400 Employee
    • Senior Plant Manager
      • Feb 2021 - Present

      Leading state of the art, green field plant for production of 132 SKUs including Mayonnaise, variety of spreads, honey, chocolate, cheese and dairy products Driving for excellence through KPIs and KBIs management and team building. Ultimate goal is to make a sustainable cost effective business where everybody can grow with the growth of Young’s. Leading state of the art, green field plant for production of 132 SKUs including Mayonnaise, variety of spreads, honey, chocolate, cheese and dairy products Driving for excellence through KPIs and KBIs management and team building. Ultimate goal is to make a sustainable cost effective business where everybody can grow with the growth of Young’s.

    • Türkiye
    • Food and Beverage Services
    • 700 & Above Employee
      • Jun 2019 - Feb 2021

      Led Factory operations including production, warehousing, quality in collaboration with all stake holders for meeting the requirements of internal and external customers.Successfully built and drove the team of Engineers and Managers to meet business demands and sales volume of 25 MUC.Focused on KPIs and KBIs delivery through strategic approach for sustainable business.

      • Apr 2016 - Jun 2019

      Leading complete Utilities, maintenance and Krones/ KHS PET bottle manufacturing lines with team of total head count 52 including 4 DR Engineers.Managing utilities having 11.75 MVA power capacity of Diesel Genset, 9 Low pressure air compressor Atlas copco GA 37 and GA 37+, 11 ammonia compressors comprising of Grasso RC 412, RC 612, V 1400 and JCI Sabroe, 3 40 bar air compressors, Boilers etcMonitoring and controlling KPI like Genset & Boiler Fuel Efficiency, Electricity & energy usage ratio, R&M cost, P&U cost, Line Efficiency, RM yields etc.Planning, execution and effective control over CAPEX & OPEX of the territory. Managing operation and maintenance of PET bottle production lines.Maintenance of low voltage, medium & high voltage switch gears.Energy conservation and ISO 50001 leader of plant. Show less

      • Mar 2015 - Mar 2016

      Leading Operations and Maintenance of PET production Lines at Plant (Krones 22,000 BPH & Sidel 18,000 BPH) with a team of 44 head count including Engineers and foremen. Implementation of innovative ideas to improve Energy and Water usage ratio at Plant.Planning and timely execution of CAPEX & OPEX of my section.Coaching and alignment of lines staff towards TPM.

      • May 2013 - Feb 2015

      Worked as a Line Engineer Krones PET Line rated 22000 BPH.Worked as a Line Engineer Sidel PET Line rated 18000 BPH.Worked on installation and commissioning of Krones PET Line rated 22000 BPH.Coordination and Supported installation and commissioning of utilities including 11 KV VCB panel, 3000 KVA Transformer, 1250 KVA Gensets and Glycol system for the production line. As a Production Engineer: Responsible for KPIs at PET Production Line Sidel like Line efficiency, raw materials yields, energy usage ratio of line, water usage ration of line, man power management, labor productivity of line, maintenance and innovations.Troubleshooting at Electrical, electronics and instrumentation. Coaching of foremen and operators.Coordination with vendors for spare parts and services.Budget (CAPEX and OPEX) planning for production line and innovations and its effective utilization. Show less

      • Nov 2012 - May 2013

      As a Team Lead Electrical & Instrumentation Department, key responsibilities are,1- HT Room containing 11 KV AVR (300 A) and VCB Panels.2- LT Room containing ACBs up to 4000 A with distribution network of 3 transformers, 2 of rating 1500 KVA and one of 750 KVA incorporated with automatic bump less operation of 4 Gensets each rated 1250 KVA.3- Ensuring preventive, predictive and corrective maintenance at four RGB Lines and one PET Sidel Line besides utilities section.4- Panning and execution of energy saving quick win projects using existing resources besides CAPEX. Show less

    • Pakistan
    • Telecommunications
    • 700 & Above Employee
    • Assistant Manager Operations Access Network
      • Oct 2011 - Nov 2012

      Team Lead of MSC sites in Central 2 region. 1- Preventive, corrective & predictive maintenance of Power and Environment equipment and infrastructure in an operational network. 2- Planning, execution & follow up of following network entities, UPS system, Rectifier system, Battery banks, Gensets, Transformers, HVAC & Air conditioning system. 3- Planning and effective utilization of relevant electrical budget (CAPEX & OPEX). 4- Introducing and conducting cost saving and network power improvement projects. 5- Coordination and management of new and existing Power projects/ upgradation. Show less

    • Türkiye
    • Food and Beverage Services
    • 700 & Above Employee
    • Executive Engineer Maintenance(E&I)
      • Jan 2009 - Oct 2011

      1- Responsible for PM & CM of Electrical power infrastructure, equipment and process automation which includes distribution transformers, LV & HV protection, Gensets, UPS, AVR, Stablizers, Battery banks, Invertors, VFDs, soft starters, AC & DC Motors, PLCs, sensors etc. 2- Budgeting (CAPEX & OPEX) for spare parts and services as per BP. 3- Maintaining spare parts inventory and raising PR through SAP ERP system. 4- Planning and execution of energy conservation schemes and providing energy efficient solutions for process improvement. 5- Compliance of electrical safety as per OHSAS 18001 and internal standards. 6- Power Projects execution as per SOP. Show less

    • United Arab Emirates
    • Telecommunications
    • 700 & Above Employee
    • O & M Engineer
      • Sep 2006 - Dec 2008

      Responsible for PM & CM of Electrical Power distribution system and electrical equipment including ATS panel, distribution panels, Earthing system, Gensets, Rectifiers, UPS, Stablizers, Battery banks, Air conditioning system, Radio and Microwave links at Mobilink sites. Responsible for PM & CM of Electrical Power distribution system and electrical equipment including ATS panel, distribution panels, Earthing system, Gensets, Rectifiers, UPS, Stablizers, Battery banks, Air conditioning system, Radio and Microwave links at Mobilink sites.

Education

  • Bahauddin Zakariya University
    B.Sc Electrical Engineering, Electrical Engg.
    2001 - 2006
  • Fedral Government Public School Multan Cantt
    A

Community

You need to have a working account to view this content. Click here to join now