AhmadA. Helmy

Mechanical Construction Manager at Concrete Plus
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Cairo, Cairo, Egypt, EG
Languages
  • English Professional working proficiency
  • Arabic -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Construction
    • 700 & Above Employee
    • Mechanical Construction Manager
      • Apr 2022 - Present

    • Egypt
    • Construction
    • 100 - 200 Employee
    • Senior Mechanical Project Engineer
      • Feb 2021 - Mar 2022

    • Egypt
    • Construction
    • 100 - 200 Employee
    • Senior Mechanical Project Engineer
      • Oct 2014 - Dec 2020

      Fish Market Ismailia ( Plumbing & fire works ) Carrefour Ismailia ( HVAC & fire & PLumbing Works ) MCIT Data Center Smart Village The Project is tier 3 Consists of 3 buildings (Power & Ups & Utility) which Receives chilled water from complete chiller plant to CRAC . Agility Mars Phase 2. The project consists of Complete chilled plant in addition to 10 AHUS C/W Steam humidifiers Which Supplies inside warehouse to Maintain Stocked products at 〖24〗^oC & 50 ∅ . Agility Mars Phase 1.The project consists of 10 DX AHUS C/W Steam humidifiers Which Supplies inside warehouse to Maintain Stocked products at 〖24〗^oC & 50 ∅ . World Bank Cairo Project 29th (Fire & Plumbing & HVAC). The project consists of 1 floor ( (contains 67 FCU with Fresh treated AHUS and 4 roof top fan occurs where ventilation occurs in water closet fireworks through Fire zone control valve and supplying fixtures units for each water closet after installing PPR Pipes and UPVC pipes. Orange smart village Office Buildings (Fire & Plumbing & HVAC). The project consists of 2 floors each floor ( 6000 m^2 (contains 67 FCU with Fresh treated AHUS and 4 roof top fan occurs where ventilation occurs in water closet fireworks through Fire zone control valve and hose cabinets and supplying fixtures units for each water closet . Orange Nile City Office Building 13th & 31th The project consists of 3 floors Each floor with 67 FCU and 140 sprinklers on each floor with treated fresh air from tempering FAHU in mechanical room and ventilation occurs in water closet from exhaust fans in mechanical floor room. BYETI Abu -Rawash Store (HVAC & FIRE WORKS). The project consist of supplying & installing one package unit to maintain suitable temperature around 26 c in store. 25 hose cabinets and 130 automatic fire fast response sprinklers with pump room. Renovation of Qatar Embassy in Cairo( HVAC & FIRE & PLUMBING WORKS ) . VACSERA Office buildings HVAC WORKS ( Chiller Pumps ). ON TV STUDIO ( HVAC WORKS ) Show less

    • Mep Techanical & Site Engineer
      • Nov 2012 - Sep 2014

      Worked full time and execute Mep Works For Villa captin Mohamed Sabet Sarokh and DrEid Salam. Hvac Works Cerruti Cafee (City Stars ). Mep Works For DrEid Salam’s Hospital. Mep Works For Karamany Automotive Workshop, consists of one basement and two floor levels. Fire & Plummbing Works For amangerial building consists of two basements and 5 floor levels( Qatr ). Mep Works for residence hotel . Duties&Responsibilities Submitting shop drawings, asbuilt drawings and material submittals for approval. Review BOQ’s, quotations and payments both with the client and subcontractor. Coordinating consultant work inspection and rectifying the comments on the work. Manage the subcontractor companies, the ordr of materials and ensure the correct payment for them . Control and report the working hours of the staff working in the project. Preparing time plans and ensure compliance with deadlines. Show less