Apr 2016 - Present
- KEY ACCOUNT MANAGER for East Coast Malaysia especially for Masoneilan, Consolidated, Nouvo Pignone and Azzalin.- Consult customer to provide better solution for issued valve at site- Consult customer for planing ahead valve servicing in term of spare part & manpower servicing arrangement- Provide support for valve spare part arrangement to meet customer budget, maintenance planning and arrangement.MAJOR ACHIEVEMENT 2018Top sales in 2018
-
-
Sales Service Manager
-
Jan 2015 - Apr 2016
- Collarboration with customer for valve servicing planning- Establish long term valve servicing contract for supporting customer valve maintenance servicing.- Consult customer for valve servicing arrangement in term of manpower, planning, schedule and cost.
-
-
-
-
Instruments Planner
-
Apr 2012 - Dec 2014
1.Preparation Phase - Prepare, verify and consolidate Worklist, Scope of Work, Technical Specifications, Job Method Sheets (JMS), Equipment Isolation Sheets (EIS), Inspection Reference Plan (IRP), Material Control Sheets (MCS). -Review/contest worklist with related parties to ensure only essential jobs are planned for the turnaround. -Participate in the development Job Safety Analysis on major / critical equipment. -Assist Turnaround Scheduler on scope optimization and preparing turnaround schedule. -Ensure good planning updates to the Preparation Engineer and Turnaround Manager. -Attend the weekly preparation meeting, highlighting work progress and constraints -Attend the turnaround integrated discussion with contractors to emphasis work scope, quality, duration, and cost control. - Prepare and issue work packages to the Turnaround area teams and contractors. - Monitor the shutdown preparation work to ensure completion i.e. scaffolding, insulation, prefabrication and availability of Turnaround materials & spare. Execution Phase -During the turnaround ensure each area quality control charts are maintained and up-to-date. -Manage and lead his area team to meet the targets set. - Ensure the area workscope is fully meet to the agreed to the planned schedule. -To ensure before T/A that job-packs are fully complete and satisfactory and inspection and test are specified. -Hold daily meeting with team to determine the days targets and prepare the work co-ordination for the following day. Report outcome to the Turnaround Manager. -Attend and report to a daily management control meeting. -Ensure the work is completed to acceptable standards and participate fully in the punch listing activities. -During the turnaround run the defect system and liaise with the Plant Technical team on specification of the work. -Produce JMS, MCS, etc., plan it and assist with the distribution of defect system to the various Area Coordinators for additional and emergent works. Show less
-
-
-
PFCE Ponterosso SB
-
Paka, dungun, terengganu, malaysia
-
Senior Engineer
-
Jan 2010 - Apr 2012
• Lead in any turnaround activities, estimate manpower & equipments during turnaround, and arrange turnaround activities schedule. • Attend turnaround daily progress meeting during mechanical days, ensure the activities during turnaround is according to the schedule and prepare close up report to client. • Lead in any turnaround activities, estimate manpower & equipments during turnaround, and arrange turnaround activities schedule. • Attend turnaround daily progress meeting during mechanical days, ensure the activities during turnaround is according to the schedule and prepare close up report to client.
-
-
-
Matrix Maintenance SB
-
Kemaman
-
Engineer
-
Apr 2008 - Jan 2010
• Ensure every valve servicing comply with PETRONAS quality standard by coordinating the job performed by the technician is following the valve maintenance procedure steps such as preparing maintenance flow chart, identifying standard replacement part of valve, valve calibration as per client requested and also proposing recommendations for immediate corrective actions to any defect part. • Establish a team, Joint Integrity Team (JIT) for plant turnaround, manage & control all activities in control bolting/joint integrity, report any defect works on flanges, propose recommendations for immediate corrective actions to any defect and attend the turnaround daily progress during mechanical day. Show less
-
-