Ahmad Ourfali
Senior Project Manager at Bandary International Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Arabic Native or bilingual proficiency
Topline Score
Bio
Experience
-
Bandary International Group
-
Qatar
-
Construction
-
100 - 200 Employee
-
Senior Project Manager
-
Apr 2021 - Present
• Project: Rawdah/Academy project & Qatar Armed Force North Camp from April 2021 to Present • Location: Rawdet al Hamameh • Contract Value: 1.6 Billion QR • Consultant: GHD • Position: Project Site Manager Rawdah/Academy project o The project is constructed over 1.6M m2 land, consisting of Administrative, accommodation and storage buildings in addition to 16No. of distribution substations and 1No. primary substation. The development of site plan is rich of many types of underground utilities and pavement finishes that must be thoroughly coordinated. Construction of Qatar Armed Force North Camp o The project of 150,000m2 total built up area is consisting of 94 administrative and industrial buildings served by 52km asphalted roads in addition to 2.5km runway and 140,570m2 apron pavement Duties and Responsibilities • Supervise and monitor all site activities directly or indirectly through out site team in accordance of project specs and quality and HSE regulations • Revise and update work schedule reflecting actual progress • Set plans (monthly, weekly) with site team to achieve the project targets • Revise the drawings with technical department, designer and consultant to eliminate progress obstacles • Attend and lead technical, progress and coordination meetings in order to ensure smooth work flow • Track the delivery of site material and equipment following up with procurement department to avoid delay to site work • Allocate the required resources and subcontractors in timely manner and track their production rate.
-
-
-
Ramco Trading & Contracting Co.W.L.L
-
Qatar
-
Construction
-
100 - 200 Employee
-
Project Manager
-
Nov 2019 - Apr 2021
• Project: Police Station and Cell Block at Umsalal from November 2019 to Present• Location: Um Salal Ali–Qatar• Consultant: Ministry of Interior – Building Affairs• Position: Project Manager Project Specifications• Demolition of all existing buildings and services• Construction of a police station and cell block buildings (G+1) • Construction of substation, fire pump room, guard rooms, boundary walls and exterior works• Full fit out works including furniture until handing over keys Duties and Responsibilities• All structural, architectural, MEP and site coordination between client, consultant, main contractor, subcontractor and suppliers• Preparing all submittals as per the specification of MOI and QCS • Monitoring and ensuring that all site activities are done according to time schedule, method of statements, quality plan, and project budget• Ensuring that the work is done in sequence under the “Lean Construction” system
-
-
Deputy Project Manager
-
May 2018 - Nov 2019
• Project: Marriot Edition Hotel from May 2018 to November 2019• Location: West Bay, Doha–Qatar• Consultant: AEB Consultant• Contract Value: 470,000,000 QR• Position: Deputy Project Manager Project Specifications• The construction of a building (3B+G+47+Pent house Floor) • Construction and fit-out package for Marriot Edition Hotel Duties and Responsibilities• All structural, architectural, MEP and site coordination between client, consultant, main contractor, subcontractor and suppliers• Monitoring and ensuring that all site activities are done according to time schedule, method of statements, quality plan, and project budget• Ensuring that the work is done in sequence under the “Lean Construction” system
-
-
Project Manager
-
Jun 2015 - May 2018
• Project: 160 Apartments Building from June 2015 to Present• Location: Al Najma, Doha–Qatar• Consultant: THE Consultant• Contract Value: 120,000,000 QR• Position: Project Manager Project Specifications• The construction of a building (B+G+7+Pent house Floor) with a total built-up area of 28,715 m2• 160 apartments consisting of 1, 2 and 3 bedrooms• Male and Female spa in the pent house floor Duties and Responsibilities• As a Project Manager, my priority was to deliver the top quality within the timeframe of the project under the budget of the client• To earn the satisfaction of the client in each item of the project• Maintain the system and interference of the consultant in all construction, management and financial activities in the project• Managing all subcontractors’ activities to meet quality, time and cost
-
-
Project Engineer
-
Dec 2010 - Jun 2015
Working with this company is allowing me to gain experience in the different areas of the construction field. I was assigned to a big portion of the 7 star "Regent Hotel" project besides the finishing of the spa area, gyms, dining area, business center, pre-function rooms, standard hotel rooms and suites and offices. The Westin Hotel is 91,011 sq. mtr. built up area that includes 338 bedrooms, 22 suites, 5 individual bungalows with swimming pools, restaurants, theme park, pools and a health club.
-
-
-
Marbu
-
Qatar
-
Site Engineer
-
Jun 2010 - Dec 2010
During this short period, I was oriented to grasp the company's procedures in executing and supervising different small construction projects that included stadiums and an industrial factory. After satisfactory completion of the orientation, I was assigned as the site engineer to execute Sheikh Abdul Rahman bin Nasser Al-Thani's majlis construction project. During this short period, I was oriented to grasp the company's procedures in executing and supervising different small construction projects that included stadiums and an industrial factory. After satisfactory completion of the orientation, I was assigned as the site engineer to execute Sheikh Abdul Rahman bin Nasser Al-Thani's majlis construction project.
-
-
-
Consolidated Contractors Company
-
Greece
-
Construction
-
700 & Above Employee
-
Internship
-
May 2009 - Jun 2009
During my training period, CCC was working on a project for designing and constructing two major bridges. I rotated through the major sections of the company such as Design, Planning, Estimate, Procurement, and Document Control Sections, in addition to the Quarry, QC Laboratory, Asphalt and Concrete Batch Plants. During my training period, CCC was working on a project for designing and constructing two major bridges. I rotated through the major sections of the company such as Design, Planning, Estimate, Procurement, and Document Control Sections, in addition to the Quarry, QC Laboratory, Asphalt and Concrete Batch Plants.
-
-
Education
-
American University of Sharjah
Bachelor of Science (BS), Civil Engineering