Ahmad Hassan

Construction Manager at Faisal Town
  • Claim this Profile
Contact Information
Location
PK
Languages
  • English Limited working proficiency
  • Urdu -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Abubakar Naeem

Ahmad Hassan is very enthusiastic, fast learner and a gentleman. I have worked with him on Builder's Mall project and found him an excellent, detail oriented with grip on all related parts of structure & interiors. He is bight prospect and will do wonders in the field of project engineering and interiors. I like to wish him all the best for his glowing and shining career.

Syed Muhammad Usman

Ahmad Hassan is an extremely creative and innovative engineer, who’s also best in guiding his juniors.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Project Management
    ELC eLearning College
    Dec, 2020
    - Sep, 2024

Experience

    • Pakistan
    • Real Estate
    • 1 - 100 Employee
    • Construction Manager
      • Nov 2022 - Present
    • Deputy Construction Manager
      • Oct 2021 - Oct 2022
    • Site Engineer
      • Mar 2018 - Oct 2021
    • Pakistan
    • Civil Engineering
    • 1 - 100 Employee
    • Site Engineer
      • Sep 2016 - Jan 2018

      Assuring that the work is performed as required by the contract and meets or exceeds the required qualities. Assuring the acceptable quality of materials, processes, and workmanship in the project work. Assisting Quality Assurance and Quality Control Engineer such as steel reinforcement checking same as in construction drawing. Issue materials receiving report for the delivered materials. Waterproofing checking underground level and in wet areas in the building. Following up the concreting works in a presence of the Engineer or Consultant, slump test and cubes preparation for the compressive test. Maintain standards of safety and comply with Company’s Health, Safety and Environment Management System requirements. Follow and maintain Company standards of Quality in accordance with Company Quality System requirements.Control the following items during concrete pouring (Water cement ratio, temperature of concrete, mixing, vibration, bleeding, segregation, slump test, casting of cylinders/Cubes for testing) Monitoring and administering the QA/QC Plan or Programme and ensuring incorporated materials on construction projects are in compliance with the plans and specifications.

    • Pakistan
    • Construction
    • 400 - 500 Employee
    • Site Engineer
      • Dec 2014 - Mar 2016

      Coordination with sub-contractors. Ø Coordination with various sub-contractors. Ø Organize manpower and equipment allocation based on site schedule to comply with the requirement. Ø Prepare request for Inspection/Testing RFI for all activities at site. Ø Responsible for material procurement as per the site requirement. Ø R. C. C. Building & Construction work. Ø Preparing layout of work as per the plan Ø Quality control of work. Ø Building finishing and interior works. Ø Waterproofing. Ø Internal road and pavement work. Ø Prepare estimations and related documents. Ø Plotting and fixing boundary as per plan. Ø Earth works, line cutting, filling and levelling. Ø Line out of buildings and roads as per plan. Ø Prepare bar bending schedule. Ø Construction of infrastructure works. Ø Material, labour as well as cost management. Ø Co-ordination with Architects and Consultants Ø Responsible for overall planning and execution of the project. Controlling labour and material, preparation of quantities, material submittals and method statements, preparing valuations and variations, conducting weekly meetings and coordinate with relevant authorities for approvals. Totally in charge for safety and quality assurance and control. Ø Supervision of all setting out, alignment, backfilling and levelling, load bearing test and all services inside and outside the building. Also responsible for the finishing works also. Ø Duties included attending all contract meetings with the client and consultant, preparing work program charts and progress reports. Responsible for setting out the works and supervising the earthworks, asphalt, drainage and services elements of the works Ø Achieve weekly daily progress target Ø Maintain the technical data. Ø Co Ordination with the technicians regarding compaction tests. Ø Check the material quality as per prescribed standards

    • Site Engineer
      • Jan 2014 - Nov 2014

      Coordination with sub-contractors. Ø Coordination with various sub-contractors. Ø Organize manpower and equipment allocation based on site schedule to comply with the requirement. Ø Prepare request for Inspection/Testing RFI for all activities at site. Ø Responsible for material procurement as per the site requirement. Ø R. C. C. Building & Construction work. Ø Preparing layout of work as per the plan Ø Quality control of work. Ø Building finishing and interior works. Ø Waterproofing.. Ø Prepare estimations and related documents. Ø Plotting and fixing boundary as per plan. Ø Earth works, line cutting, filling and levelling. Ø Line out of buildings and roads as per plan. Ø Prepare bar bending schedule. Ø Construction of infrastructure works. Ø Material, labour as well as cost management. Ø Co-ordination with Architects and Consultants Ø Buildings works with brick masonry concrete and plaster work. Ø Flooring work including terrazzo, marble, tiles and tough pavers act. Ø Building layouts Ø Working on houses, Sewerages, and Overhead Water Tanks. Ø Supervision of structural, architectural phases and interior design implementation. Ø Checking of technical submittals and shop drawings for various items of work. Ø Making revised scope of work, revised B.O.Q. and resulting revisions of work schedules. Ø Coordination among all stake holders involved in construction, operation & maintenance phases of the project Ø Preparation of daily, weekly, fortnightly and monthly progress reports. Site inspection through check request system

    • Pakistan
    • Building Materials
    • 1 - 100 Employee
    • Asst.site Engineer
      • May 2011 - Dec 2013

       Responsible for execution of civil, structural, finishing works  Layout of building  Responsible for execution of earth work, concrete work, brickwork, plaster, according to contract specification.  Preparation of bar bending schedule for all concrete members i.e. slabs, beams, columns, water tanks.  Form work for concrete members  Control the following items during concrete pouring (Water cement ratio, temperature of concrete, mixing, vibration, bleeding, segregation, slump test, casting of cylinders/Cubes for testing)  Quality assurance of civil works  Preparation of BOQ  Preparation of markets rates  Checking of contractor bills.

Education

  • University of South Asia
    Bachelor of Technology (B.Tech.), Civil Engineering
    2013 - 2015
  • P.B.T.E LAHORE
    DAE CIVIL ENGINEERING, Building Construction Technology
    2008 - 2011

Community

You need to have a working account to view this content. Click here to join now