Agis Rijal A.
Instrument Engineer at Bina Rekacipta Utama, PT- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
-
Instrument Engineer
-
Jan 2013 - Present
Position: Instrument Engineer Project: Madura BD Field Development – EPCI (DED) Client: Husky-CNOOC Madura Ltd. Period: July 2013 – June 2014 Responsibility: 1. Prepare project philosophy (WHP Automation and Safety System philosophy). 2. Prepare project specifications (HIPPS, Safety Control System, General Alarm [PAGA], MOV, Choke Valve, Instrument/Telecom Cable, etc.). 3. Prepare Instrument Datasheets (Multiphase Flowmeter, HIPPS valve, SDV/BDV, Fire & Gas… Position: Instrument Engineer Project: Madura BD Field Development – EPCI (DED) Client: Husky-CNOOC Madura Ltd. Period: July 2013 – June 2014 Responsibility: 1. Prepare project philosophy (WHP Automation and Safety System philosophy). 2. Prepare project specifications (HIPPS, Safety Control System, General Alarm [PAGA], MOV, Choke Valve, Instrument/Telecom Cable, etc.). 3. Prepare Instrument Datasheets (Multiphase Flowmeter, HIPPS valve, SDV/BDV, Fire & Gas Detectors, etc.). 4. Prepare Instrument Lists.5. Prepare Instrument Drawings (Process Cause & Effect Diagram, Fire and Gas Cause & Effect Diagram, Instrument Logic Diagram, GA Block Diagram, etc.). 6. Prepare Requisition Documents (RFQ of HIPPS system, Integrated Control & Safety System [DCS for BPCS and Safety Control System], MPFM, Fire & Gas Detectors, SDV/BDV, etc.). 7. Prepare Technical Bid Evaluation Documents (TBE of HIPPS system, Integrated Control & Safety System, MPFM, Fire & Gas Detectors, SDV/BDV, etc.). Position: Instrument Engineer Project: Suban-12 Flowline Detailed Engineering Client: Chonoco Phillips. Period: January 2013 – February 2013 Responsibility: 1. Prepare instrument index, DCS and SCADA I/O list, cause & effect diagram, tubing schedule, cable schedule, and cable connection diagram. 2. Prepare field instrument data sheets. 3. Check instrument installation detail drawing. 4. Check instrument loop diagram. 5. Check instrument hook-up drawing. 6. Prepare instrument MTO. Show more Show less
-
-
-
-
Engineer
-
Nov 2010 - Dec 2012
October 2012 – December 2012Instrument Engineer (on behalf of PT LAPI ITB)Survey dan Reengineering Depot LPG Pulau Layang - PT Pertamina (Persero)May 22-25, 2012Instructor Assistant (on behalf of Prosafe Binatama)Basic PLC Training - PT Chevron Pacific IndonesiaOctober 2011 – January 2012Instrument Engineer (on behalf of PT LAPI ITB)Survey dan Re-Engineering Terminal LPG Pangkalan Susu Medan - PT Pertamina (Persero)Juni 2011 – Agustus 2011DCS… October 2012 – December 2012Instrument Engineer (on behalf of PT LAPI ITB)Survey dan Reengineering Depot LPG Pulau Layang - PT Pertamina (Persero)May 22-25, 2012Instructor Assistant (on behalf of Prosafe Binatama)Basic PLC Training - PT Chevron Pacific IndonesiaOctober 2011 – January 2012Instrument Engineer (on behalf of PT LAPI ITB)Survey dan Re-Engineering Terminal LPG Pangkalan Susu Medan - PT Pertamina (Persero)Juni 2011 – Agustus 2011DCS EngineerProyek Penggantian Pipanisasi CB-I Tasikmalaya-Ujung Berung - PT Pertamina (Persero)April 2011 – June 2011Instrument Engineer (on behalf of PT LAPI ITB)Pembuatan Front End Engineering Design (FEED) Tie in HCE 29 & 29A dan 30 & 30A di Area Geothermal Dieng - PT Geo Dipa Energi October 2010 – December 2010Instrument Engineer (on behalf of PT LAPI ITB)Front End Engineering Design (FEED) for gas lift compression project - Korea Development Co., Ltd. Show more Show less
-
-
Education
-
Institut Teknologi Bandung (ITB)