Afrizal Rezha W

Instrument Control Engineer at PT D&C ENGINEERING COMPANY
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Central Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Instrument Control Engineer
      • Jul 2017 - Present

      Job Responsibility in PLTU CILACAP 2x300 MW = 1. Planning Daily Routine Activity I&C Maintenance Team 2. Review and Report Daily Routine Activity I&C Maintenance Team 3. Prepare Material for I&C Maintenance Team 4. Conduct Safety working Environment for I&C Maintenance Team 5. Analysis Instrument & Control problem ( Instrument Device, DCS, Etc ) 6. Handle MAXIMO for Managing report activity and material needed in PLTU Cilacap. Job Responsibility in PLTU CILACAP 2x300 MW = 1. Planning Daily Routine Activity I&C Maintenance Team 2. Review and Report Daily Routine Activity I&C Maintenance Team 3. Prepare Material for I&C Maintenance Team 4. Conduct Safety working Environment for I&C Maintenance Team 5. Analysis Instrument & Control problem ( Instrument Device, DCS, Etc ) 6. Handle MAXIMO for Managing report activity and material needed in PLTU Cilacap.

    • Oil and Gas
    • 1 - 100 Employee
      • Apr 2016 - Jan 2017

      Made Feed and Detail Engineering project Include :1. Preparation for I&C Drawing including Hook-Up Drawing, Standard Drawing, , Architechture Diagram, Cable Layout, Loop Diagram, Wiring Diagram, Block Diagram & Material Take Off (MTO) 2. Coordination with I&C Team Project and other Department3. Responsibility Drawing Result by Instrument Drafter

      • Apr 2013 - Apr 2016

      • Jan 2014 - Dec 2015

      Project : FOXROT F&G AND ESD INTEGRATION UPGRADEClient : Pertamina Hulu Energi Offshore North West Java (PHE ONWJ)Responsibility : • Prepare Instrument Location Layout• Prepare F&G Detector Layout• Prepare F&G Cable Layout• Prepare ESD and F&G Cable Tray Layout• Prepare Cable Schedule• Prepare Support and Installation Detail• Prepare MTO (Material Take Off)• Prepare Cause & Effect Drawing

      • Apr 2014 - Jul 2015

      Project : JMI-IRON SAND CONCENTRATOR PLANTClient : FERROSTAAL INDONESIAResponsibility : Telecom & PAGA System Location Layout, Utility Control and Shutdown System Location Layout in Control Room, Arrangement Drawing of Instrument Air Tubing of Routes, Instrument Hook-Up

      • Jan 2014 - Sep 2014

      Project : FEED Pipeline Lomanis – Rewulu (CY-III), Lomanis-Tasikmalaya, Tasikmalaya (CB-III) & Pipeline Padalarang – TBBM Sukabumi Client : PERTAMINAResponsibility : Instrument Block Diagram, Instrument Wiring Diagram, Instrument Loop Diagram, Instrument Hook-Up, Instrument Cable Layout

      • Apr 2014 - May 2014

      Project : TELUK KABUNG LPG PRESSURIZED TERMINAL Client : PERTAMINA PADANG - WEST SUMATRAResponsibility : Architecture Diagram, Instrument Hookup Drawing.

      • Dec 2013 - Apr 2014

      Project : INSTALLATION OF AUTOMATION SYSTEMS, SYSTEM METER & TELECOMMUNICATION Client : PERTAGASResponsibility : Instrument Block Diagram, Instrument Wiring Diagram, Instrument Loop Diagram, Instrument Hook-Up

      • Sep 2013 - Nov 2013

      Project : UPGRADING INSTRUMENTATION & CONTROL FACILITIES AND SAFETY SYSTEM PERTAMINA TAMBUNClient : PERTAMINAResponsibility : Instrument Control and Safety System (ICSS) Architecture, Instrument Location Layout, Instrument Main Cable Layout, Instrument Block Diagram, Instrument Wiring Diagram, Instrument Loop Diagram, Instrument Hook-Up, Instrument Cable Schedule, .

      • Apr 2013 - Sep 2013

      Project : Terbanggi Besar Gas Booster Station Project Client : PGNResponsibility : Instrument Location Layout, Instrument Main Cable Layout, Instrument Block Diagram, Instrument Termination Diagram, Instrument Wiring Diagram, Instrument Loop Diagram, Instrument Hook-Up, Instrument Cable Schedule.

      • Apr 2013 - May 2013

      Project : NEW GANTRY SYSTEM TERMINAL BBM REWULU YOGYAKARTA ( PERTAMINA)Client : Pertamina NiagaResponsibility : Architecture Diagram, Terminal Automation System Workflow

Education

  • Institut Sains dan Teknologi Nasional (ISTN) Jakarta
    Bachelor's degree, Electrical and Electronics Engineering
    2012 - 2014
  • Universitas Gadjah Mada (UGM)
    Diploma, Electronica and Instrumentation
    2008 - 2012
  • SMA Negeri 1 Cilacap
    2005 - 2008
  • SMP Negeri 1 Cilacap
    2002 - 2005

Community

You need to have a working account to view this content. Click here to join now