Afon Pokrovsky

Enterprise Security Architect at Sprint
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Russia, RU
Languages
  • Russian Native or bilingual proficiency
  • English Full professional proficiency
  • German Professional working proficiency
  • Arabic Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Enterprise Security Architect
      • Sep 2017 - Present

    • Civil Structural Engineer
      • 2011 - Present

      Project – Jazan Integrated Gasification Combined Cycle (JIGCC)Project, Saudi Arabian Oil Company (Saudi Aramco), Saudi Arabia.Engineering support service for China Harbour Engineering Company.Responsible for the detailed design review of Civil and Structural components.Analysis and design of Sea water Intake structures, intake channel, Screenchambers, Pump station, Inlet basin, Inlet channel, Lagoon, by pass channel,Storm water channel, collection basin, weir box, over flow channel, dischargechannel, outfall tank, storm water discharge apron, roads and geometric design,drainage systems, pump foundations, Sub station building etc., Show less

    • Civil Structural Engineer
      • 2007 - 2011

      Project – Engineering, Procurement, Installation and Commissioning for Berthsand Port Infrastructure for Ras Laffan Port Expansion Project – Phase 2, Qatar:Qatar Petroleum.Responsible for the detailed design of Civil and Structural components of portinfrastructures. Analysis and design of Piperack and pipe bridges in reclamationarea, Container Yard Building, Gate House, Chlorination building, control room(Blast resistance), Sub-station and Foam pump house building.

    • United Kingdom
    • Facilities Services
    • 700 & Above Employee
    • Acting Off Track Manager
      • 2003 - 2007

      Managing a team carrying out off track repairs to structures and attendance at faults. Liaison with the RfL Asset Engineer to scope work and make changes where applicable. Planning of works including making a programme and production of method statements and risk assessments. Booking of worksites in possessions and pricing of Service Managers Instructions. Supervision of subcontractors during blockade installing temporary works in the form of a high level walkway to allow repairs to retaining wall. Show less

    • Graduate Civil Engineer - North London Line
      • 1999 - 2003

      Work Package 2 - Signalling Enabling WorksManaged and supervised trial pits works carried out for around 40 signal bases based on signal sighting form locations to check for clashes with buried services and foundations. Site engineer for installation of screwpiles for signals; setting out and dealing with problems such as clashes with overhead line equipment.Also site engineer for the construction of Principal Supply Point (PSP) bases, Under Road Crossing (URX) and Re-locatable Equipment Building (REB) bases including auxiliary items to these such as troughing runs and fencing. This involved planning and setting out works, identifying design changes and liaising with the client and designer to deal with site problems.Work Package 2 - Permanent WayAssisted as a site engineer where platform extensions had taken place and tamping works were needed to meet the design. Also assisted in a switch and crossing installation involving setting out of the panels and also tamping works.Temporary Works AssistantProduced temporary works design briefs for overhead line equipment base excavations, lift pit excavations, hoardings and bridge wingwall formworks.Also carried out trial pit based ground investigations, taking shear vane values and classifying soil types at a number of locations where temporary works such as excavations, crane pads and piling platforms were needed and the temporary works designer needed near surface soils data. Show less

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Graduate Civil Engineer - Highways Department
      • 1997 - 1999

      On the Surrey Highways Partnership - Designed road layout improvements to the Design Manual for Roads and Bridges, compiled the project specifications, carried out statutory services enquiries. Surface water and foul water drainage design in accordance with Sewers for Adoption on the Whittington Barracks project. On the Surrey Highways Partnership - Designed road layout improvements to the Design Manual for Roads and Bridges, compiled the project specifications, carried out statutory services enquiries. Surface water and foul water drainage design in accordance with Sewers for Adoption on the Whittington Barracks project.

    • Undergraduate Civil Engineer
      • 1995 - 1997

      A £120 million project to create a printworks for News International Newspapers. Site engineer overseeing works that were completed including temporary works, steel erection and external works sections. A £120 million project to create a printworks for News International Newspapers. Site engineer overseeing works that were completed including temporary works, steel erection and external works sections.

Education

  • University of Nottingham
    MEng (Master in Engineering with Honours), Civil Engineering, 2:1 (Second Class, Division One)
    1993 - 1997

Community

You need to have a working account to view this content. Click here to join now