Afda Rizki

Lead Project Planner at Gransolar Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Brisbane, Queensland, Australia, AU
Languages
  • Arabic -
  • English -
  • Malay -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Spain
    • Renewable Energy Power Generation
    • 100 - 200 Employee
    • Lead Project Planner
      • Jul 2023 - Present

      EPC Turnkey PV plants project across Australia and New Zealand. EPC Turnkey PV plants project across Australia and New Zealand.

    • Oil and Gas
    • 700 & Above Employee
    • Lead Project Planner
      • May 2021 - Jun 2023

      May 2022 – June 2023 Project – FPSO Conversion FPSO Conversion is a part of Production Sharing Contract (PSC) of Forel - Bronang FPSO conversion (Time Charter), Wellhead Platform Engineering, Procurement, Construction, Installation and Commissioning (EPCIC), as a part of Block B of the Natuna Sea development project. The project also include 17 Km 8 inch-dia underwater pipeline from Bronang WHP to Forel WHP. Roles and responsibilities: Development of Project Schedule. Coaching contractors for P6 detail schedule development, progress measurement system implementation, and P6 based s-curves development. Supervising 3 (three) site planners. May 2021 – Mar 2022 Project – Kaliberau Dalam Development Kaliberau Dalam Development Project (formerly ConocoPhillips Indonesia joint operation with Repsol Indonesia BV), Multiphase flowline from KBD-2XST1 well and KBD-4 well to the existing Grissik CGP at Corridor PSC, through part of RoW at Jambi Merang PSC. Including modification of existing equipment and installation of new equipment at the existing Grissik CGP Facility, Flowline for produced water to the existing Corridor water injection system, Future compression system in the existing CGP facility to boost KBD arrival pressure and meet the CGP inlet requirement. Roles and responsibilities: Development of Project Schedule. Involved since Front-End Engineering Design until EPCIC Tender Preparation, and Government of Indonesia AFE approval. Show less

    • United States
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Commissioning Planning Engineer, Jawa 1 Power Plant
      • Jan 2021 - May 2021

      GE-Samsung-Meindo EPC Consortium. Project: 1.760 MW Combine Cycle Gas Turbine (CCGT). The IPP Jawa-1 project is a project that integrates Gas facilities with a power plant project consisting of 1.760 MW Combine Cycle Gas Turbine (CCGT), FSRU, gas pipeline between CCGT Jawa-1 and FSRU, and transmission lines that connect the Power Plant with interconnection points. The LNG supplied by PLN will be received and regasified in the FSRU unit and then delivered in the form of gas to the CCGT Jawa-1 unit through offshore and onshore gas pipes. Furthermore, the electricity generated by the CCGT Jawa-1 will be distributed to PLN for 25 years with the BOOT scheme (Build, Own, Operate, and Transfer) to the Java-Bali electricity system through a 500 kV transmission network from the power plant to the 500 kV PLN substation. CCGT Jawa-1 will sell electricity to PLN with a PPA (Power Purchase Agreement) Show less

    • Australia
    • Professional Services
    • 700 & Above Employee
    • Construction Planner, Qatar Shell EPCM
      • Feb 2020 - Jun 2020

      Engineering, Procurement and Construction Management (EPCM) services contract for the Pearl Gas to Liquids (GTL) and associated facilities in Qatar. Worley provides EPCM services, primarily for a portfolio of brownfield projects inside Pear GTL Plant. Roles and responsibilities: Coordinating contractors for planning and scheduling matters. Ensuring that planned progresses are realistic for monitoring purposes. Review the project planning reports submitted by contractors and highlight areas of concerns. Preparing weekly, and monthly report and progress dashboard for internal management information. Show less

    • Spain
    • Renewable Energy Power Generation
    • 100 - 200 Employee
    • Planning Manager for Gransolar-Acciona-Ghella JV
      • May 2019 - Feb 2020

      Project : Phase C of 800MW PV Solar Power Plant Project Project : Phase C of 800MW PV Solar Power Plant Project

    • Indonesia
    • Strategic Management Services
    • 400 - 500 Employee
    • Sr. Planning Engineer
      • Jun 2018 - Jan 2019

      Work in client side for EPC of 1 X 70MW Thermal Coal Power Plant Project. With 1X140TPH CFB Boiler as additional power source for existing Pulp and Paper upgrading project. Along with its BOP (Balance of Plant) in Serang Mills, Indonesia. Roles and responsibilities: Coordinating Engineering Contractor in project control discipline. Development of resources loaded schedule for Front End Engineering Design (FEED). Providing weekly, and monthly report for internal management review and highlight areas of concerns including project delays to concerned project management team so that reminders and delay notices are timely issued as necessary. Show less

    • Spain
    • Renewable Energy Power Generation
    • 100 - 200 Employee
    • Assistant Planning Manager for Gransolar-Acciona-Ghella JV
      • Nov 2017 - Jun 2018

      Project : Phase A&B of 800MW PV Solar Power Plant Project Project : Phase A&B of 800MW PV Solar Power Plant Project

    • Oil and Gas
    • 700 & Above Employee
    • Planning Engineer
      • Nov 2016 - Mar 2017

      Project: Dammam Decentralized Water Injection Project as a part of Mishrif Full Field Development. Planning and scheduling of development /construction of water wells and production wells conversion into water injection wells to keep the trend of current oil production above 400 kBPOD.

    • Planning Engineer
      • Apr 2014 - Nov 2016

      Project: Central Processing Facility (CPF) and Gathering Line of Mishrif Early Oil (400 kBPOD)Planning and scheduling of well pads development / construction work with respect to drilling and completion schedule as well as production target. Planning the construction of well pads and auxiliaries facilities e.g. sub-stations and overhead power line, including gathering / trunk line construction. To achieve 400 kBPOD of crude oil production target by the end of 2014.

    • Planning Engineer
      • Nov 2013 - Apr 2014

      Project: Gas Turbines Power Plant (GTPP) of Mishrif Early Oil.Planning and scheduling construction and commissioning work of simple cycle of dual fuel - gas turbines power plant work - Gas Turbines Power Plant (GTPP) 3 X 42 MW.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Planning Engineer, DC-1/CGPX Project
      • Jun 2012 - Oct 2013

      Project: Dayung Compressor (DC1) and Grissik Central Gas Plant Upgrade (CGPX). Working along with contractors’ planners to develop detail Contract Schedule Baseline (CSB), closely monitoring and comparing current schedule against CSB for Dayung Gas Plant Debottle-necking project and Grissik Gas Plant Upgrading Project (DC1/CGPX Project). These projects were constructions of additional facilities to upgrade the capacity of the gas plant from 310 mmscfd to 460 mmscfd at Grissik Gas Plant and additional compressor at Dayung Gas Plant. Show less

    • Italy
    • Engineering Services
    • 700 & Above Employee
    • Planning Engineer, Gorgon Project
      • Nov 2010 - Mar 2012

      Project: LNG Jetty and Marine Structure of Gorgon Project. Development of detail schedule and any spreadsheet tools for progressing purpose of engineering, procurement and construction of any modules at site. Closely dealing with contractor to achieve 11 Batches of Modules shipment target within a year. Project Scheduling in Microsoft Project and Primavera 6 : Development of detailed schedules based on drawing as well as generating loading of resources, and critical path analysis. Project: LNG Jetty and Marine Structure of Gorgon Project. Development of detail schedule and any spreadsheet tools for progressing purpose of engineering, procurement and construction of any modules at site. Closely dealing with contractor to achieve 11 Batches of Modules shipment target within a year. Project Scheduling in Microsoft Project and Primavera 6 : Development of detailed schedules based on drawing as well as generating loading of resources, and critical path analysis.

    • United States
    • Construction
    • 700 & Above Employee
    • Scheduler, Chevron Capital Project Management (CPM)
      • Nov 2009 - Nov 2010

      Project: Various Projects under Chevron Capital Project Management. Verify any cost estimation, cost expenditure plan, schedules and progress reports submitted by contractors. Working along with construction engineer to check and verify Contractors’ PEP (Project Execution Plan). Providing Cost Expenditure report as well as Earned Value Report for Capital Project at Sumatra Light North .Updating cost report into CCMS (Contract Cost Management System) software and as well as JD-Edwards of Chevron. Project Scheduling in P3 and Microsoft Project : Generating loading of cost and resources, manhours and earned value analysis based on constractors’ schedules and report. Generating Tripatra Fluor resources loading based on given Capital Project List by Chevron Pacific Indonesia quarterly. Show less

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Planning Engineer , Noble Danny Adkins Project
      • Nov 2008 - Sep 2009

      Project: Noble Danny Adkins (DP3 Semi-submersible Rig). Development of Integrated Master Schedule (IMS) for multi disciplines work of dynamic positioning (DP3) semi submersible drilling rig construction. Project Scheduling in P3 : Running and updating the schedule for weekly report purpose. Update and control the schedule program during the course of execution concerning critical path analysis, total float status. Generating resources loading and providing what-if analysis schedule for management review. Show less

    • United States
    • Construction
    • 700 & Above Employee
    • Scheduler, Chevron Capital Project Management (CPM)
      • Aug 2006 - Nov 2008

      Project: Various Project under Chevron Capital Project Management (CPM). Verify any cost estimation, cost expenditure plan, schedules and progress reports submitted by contractors. Working along with construction engineer to check and verify Contractors’ PEP (Project Execution Plan). Providing Cost Expenditure report as well as Earned Value Report for Capital Project at Sumatra Light North Project: Various Project under Chevron Capital Project Management (CPM). Verify any cost estimation, cost expenditure plan, schedules and progress reports submitted by contractors. Working along with construction engineer to check and verify Contractors’ PEP (Project Execution Plan). Providing Cost Expenditure report as well as Earned Value Report for Capital Project at Sumatra Light North

    • Indonesia
    • Construction
    • 100 - 200 Employee
    • Project Control
      • Oct 2005 - Jul 2006

      Project: Various Piping Maintenance Works Providing progress measurement tools for progressing any construction activities at site. Responsible for collecting and maintaining all the report of Piping Department (Off-Plot/On Plot). Responsible to prepare Piping Daily, Weekly and Monthly report to be submitted to CPI, TF and TJE Duri Management Project: Various Piping Maintenance Works Providing progress measurement tools for progressing any construction activities at site. Responsible for collecting and maintaining all the report of Piping Department (Off-Plot/On Plot). Responsible to prepare Piping Daily, Weekly and Monthly report to be submitted to CPI, TF and TJE Duri Management

    • Indonesia
    • Engineering Services
    • 700 & Above Employee
    • Technical Assistant
      • Oct 1998 - Oct 2005

      Project: Various Projects under Contract Operation Service (COS) at Heavy Oil Unit. Providing technical assistance for field engineers and work closely with them. Responsible for developing, collecting and maintaining all the report of piping department (off-plot/on plot). Produce daily, weekly and monthly piping report to be submitted to client ( Caltex Pacific Indonesia) Project: Various Projects under Contract Operation Service (COS) at Heavy Oil Unit. Providing technical assistance for field engineers and work closely with them. Responsible for developing, collecting and maintaining all the report of piping department (off-plot/on plot). Produce daily, weekly and monthly piping report to be submitted to client ( Caltex Pacific Indonesia)