Adrien Krempp

Method Engineer at Freyssinet Australia
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Macquarie Park, New South Wales, Australia, AU
Languages
  • English Full professional proficiency
  • German Limited working proficiency
  • Français Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Civil Engineering
    • 100 - 200 Employee
    • Method Engineer
      • Jan 2018 - Present

      West Gate Tunnel Project in Melbourne (VIC):• Erection methods of precast piers and portals• Erection methods of span-by-span viaduct using a Launching Gantry

    • Method Engineer
      • Jul 2017 - Jan 2018

      Bridge over Clarence River in Grafton (NSW): precast segmental cantilever bridge Responsible of the definition of segment erection methodology and design of temporary equipment such as:• Pier Bracket• Lifting Beam• Stressing Platform

    • France
    • Civil Engineering
    • 700 & Above Employee
    • Method Engineer
      • Sep 2013 - Jul 2017

      Design engineer in the Method Division of the Technical Department of Freyssinet. Designing and following of construction methods during tender phase or execution phase: • 3rd Bosphorus Bridge (Turkey): Cable stayed bridge. Designing of a working platform (“C-Platform”) used to access the bottom anchorage of the stay cables and traveling along the deck. In charge of the definition of the installation method of damper masts (176 masts to install in 2 months with tight tolerances). • Tuen Mun - Chep Lap Kok (Hong-Kong): Cantilever bridge, launching gantry. Technical assistance (2 x 2 months) for the commissioning of the two Launching Gantries. • Ayala Bridge (Philippines): Reparation work, heavy lifting. Define and design the lifting methods of the bridge. Lifting using strands jacks supported by lifting gantries. • Hebron (Canada): Offshore platform, prestressed concrete. Technical assistance (1 month) for the installations methods of the prestressing cables.

    • France
    • Civil Engineering
    • 700 & Above Employee
    • Final year project
      • Feb 2013 - Jun 2013

      Comparative Analysis of Bridge Erection Machines. Technical study of the range of application, manpower needs, construction cycles and execution costs of deck construction methods such as form traveler, moveable scaffolding systems, launching gantry, lifting frame and incremental launching. Comparative Analysis of Bridge Erection Machines. Technical study of the range of application, manpower needs, construction cycles and execution costs of deck construction methods such as form traveler, moveable scaffolding systems, launching gantry, lifting frame and incremental launching.

    • France
    • Civil Engineering
    • 700 & Above Employee
    • Technical internship
      • Jun 2012 - Aug 2012

      Technical internship (3 months): Following and management of several projects of prestressed concrete in bridges and buildings constructions sites, assistance in the planning of a rail bridge side shifting. Technical internship (3 months): Following and management of several projects of prestressed concrete in bridges and buildings constructions sites, assistance in the planning of a rail bridge side shifting.

    • Work internship
      • Jun 2011 - Jul 2011

      Worker internship (2 months): Earthwork, foundations, precast walls. Worker internship (2 months): Earthwork, foundations, precast walls.

Education

  • INSA Strasbourg
    Engineer, Civil enginerring
    2008 - 2013