Adrie Stikkelman
Assisting Department Manager at Fluor Consultants B.V.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Fluor Consultants B.V.
-
Netherlands
-
Architecture and Planning
-
1 - 100 Employee
-
Assisting Department Manager
-
Aug 2021 - Present
-
-
-
Fluor Corporation
-
United States
-
Construction
-
700 & Above Employee
-
Senior Piping Lead Engineer
-
Sep 2018 - Apr 2021
SummarySenior Piping Lead Engineer with excellent knowledge on Piping Materials Engineering, Piping Material Control and Project Execution.I have 40+ years international experience in Piping Engineering & Design at Fluor BV and Badger BV, both a global Engineering and Construction Management company. Working at different office locations around the world such as Boston, Tampa, The Hague, Haarlem, Dortmund, Manilla, Gliwice, New Delhi, Beijing and Clients onsite facilities in Spain. My experience includes a wide range of refinery and chemical projects on both green field as well as on brown field projects. My scope covers feasibility studies, pre-feed to FEED and Engineering, Procurement and Construction (EPC) in either reimbursable or lump-sum contract form. Show less
-
-
Engineering Manager
-
Sep 2017 - Aug 2018
-
-
JV Material Control Manager
-
Nov 2016 - Aug 2017
Ensure utilization of approved material control practices and guidelines in performing workInteract with project manager, discipline leads, clients, and applicable joint venture partners to meet project objectives through alignment sessions ensuring effective cross-functional communicationDevelop and roll-out strategies of proper identification of material requirements throughout the whole project for the whole Joint VentureAnalysis of Material Requirements by sub-units verifying material forecasts, completeness and correctness of the Material Take-OffsPlan and coordinate Material Take-Off activities by the sub-units in the Joint-Venture Oversee and/or interface with the teams responsible for the development of material requirements including specifications and scopes while working with Material Management and/or internal clientsPerform activities associated with material contingencies, logistics analysis, and material management functionsProvide guidance to the sub-units in the field of Material Control to ensure that the Work meets the Project Schedule Show less
-
-
Piping Module Yard Engineer and Material Controller
-
Jul 2016 - Oct 2016
- Assigned as Piping Module Yard Engineer & Material Controller at the Module Fabrication Yard, responsibilities included:- Expediting of suppliers of piping materials- Providing leadership and decision making to the Material Management Group- Forecasting of release of materials and subsequent fabrication- Interface between Engineering, Construction and Contractor- Solving queries from the Contractor
-
-
Piping Distribution Execution Coordinator
-
Sep 2015 - Jun 2016
Responsible to improve the coordination between the Amsterdam home office and the supporting office in New Delhi. The focus areas were Piping Material Management and Engineering activities.Frequent travel to the New Delhi office took place to oversee and leadership to the overall Piping Execution of the project, with a focus to ensure that all IFC deliverables and material requirements has been met to support the Module Fabrication and Installation scheduleCoaching and training Piping Lead Engineer in the ND office. Show less
-
-
Department Manager of the Piping Engineering & Design department
-
Jul 2010 - Aug 2015
- Holding full technical and execution responsibility for all piping work executed in the Fluor Amsterdam office. - Developing and executing the strategic plan for the department on basis of the Corporate and Office Strategic Plan.- Recruitment of staff and agency personnel- Assisting projects with technical and execution expertise- Training and development of staff members- Implement Corporate and Office Strategies- Mentoring of Piping personnel- Piping Project Staffing- Department Budget Planning & Control- People Management- Regular liaison with other Corporate offices worldwide- Building & maintaining client relationships Show less
-
-
Lead Piping Engineer
-
Jan 2000 - Jul 2010
Overall responsible for five engineering and design functions within the discipline from Pre-FEED to detailed design, for Projects CAPEX ranging from $15 million to $ 3.2 billionThe piping scope to be estimated for the FEED and EPC phase of the project, change orders, deviations and forecasting of man-hours too go during the progress of the project.The piping communication, coordination and activities between the home office Amsterdam and GEC's in Gliwice, Brno, Manila and New Delhi. Lead piping teams of 30-200 people in multiple offices. The planning and scheduling of all engineering and design activities associated with the scope of work for the project and client expectationsResponsible for interpretation of codes, specifications and regulations Show less
-
-
RDB Engineer
-
Sep 1996 - Dec 1999
As Reference Data Base (RDB) Engineer, responsible for database / catalog implementation for piping Material control system (Material Manager) and Intergraph 3D Plan Design Systems (PDS). Preparing and maintaining piping material specifications, setup and maintaining piping commodity specifications, commodity/graphic and symbol libraries. Coordinate the transfer of MTO- requirements from/to material management applications.
-
-
-
-
RDB Engineer / Piping Material Controller,
-
Jul 1988 - Aug 1996
As piping material controller, responsible for material takeoff and monitoring and coordination of all material control activities required to sustaining contract schedules and timely material availability through usage of computerized systems.As Reference Data Base (RDB) Engineer, responsible for database / catalog implementation for piping Material control system (Material Manager) and Intergraph 3D Plan Design Systems (PDS). Preparing and maintaining piping material specifications, setup and maintaining piping commodity specifications, commodity/graphic and symbol libraries. Coordinate the transfer of MTO- requirements from/to material management applications. Show less
-
-
Piping Designer / Draftsman
-
Dec 1980 - Jun 1988
Develop and optimize layouts from conceptual design to detailed engineering phaseCheck mechanical drawings and provide nozzle orientations for vessels and columnsDesign various piping layouts and produce Isometric drawingsDrafting / Back drafting P&ID’s and Piping drawings.
-
-