Adrian Silva

Director of Corporate CI & Mexico Operations at Advanced Assembly Products, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Motor Vehicle Manufacturing
    • 1 - 100 Employee
    • Director of Corporate CI & Mexico Operations
      • Jan 2018 - Present

      United States

    • Plant Manager
      • Jan 2016 - Jan 2018

      San Luis Potosí y alrededores, México

    • Operations Manager
      • Sep 2014 - Jan 2016

      San Luis Potosí y alrededores, México

    • France
    • Motor Vehicle Manufacturing
    • 200 - 300 Employee
    • Quality manager
      • Jan 2014 - Sep 2014

      San Luis Potosí y alrededores, México Customer service GM,Chrysler,VW, Coordinating internal and external quality audits ISOTS16949 Reviews all supplier or customer discrepancies. Coordinates,follow up of corrective/preventive action Root cause analysis for customer complaints (8d`s,5 whys,ishikawa) Coordinating departments to meeting company production and quality goals KPI measurement and improvement PPAP ,PFMEA

    • Continuous Improvement Engineer
      • Dec 2012 - Jan 2014

      San Luis Potosí y alrededores, México Improving and validation of new equipment working with U.S suppliers Responsible for documentation of flow diagram Control Plan and PFMEA RPN reduction Implementation and improvement of 5s , PFEP and TPM Kaizen events cost reduction, cycle time and problems resolution. (Shopfloor, Kobetsu,Gemba) Process analysis (time and motion study ,error proofing implementation) Design of error proofings and tooling (CAD 3D) Responsible of improve materials supply, production… Show more Improving and validation of new equipment working with U.S suppliers Responsible for documentation of flow diagram Control Plan and PFMEA RPN reduction Implementation and improvement of 5s , PFEP and TPM Kaizen events cost reduction, cycle time and problems resolution. (Shopfloor, Kobetsu,Gemba) Process analysis (time and motion study ,error proofing implementation) Design of error proofings and tooling (CAD 3D) Responsible of improve materials supply, production plan Optimizing plant layout to ensure flow improvement Coordinating process changes resulting from quality,continuous improvement and audit requirements

    • Advanced Manufacturing Engineer
      • Apr 2011 - Dec 2012

      Queretaro Qro Responsible for the implementation of new projects, engineering changes and prototypes products Process improvements for productivity, down time and scrap reduction Optimizing and draw plant layout to improve productivity ,reduce un-necessary materials handling Electrical, pneumatic and hydraulic services installations Promote,lead & support various Lean Manufacturing initiatives.. Update and revise Manufacturing Process Instructions (MPIs) Kaizen events for proper flow of… Show more Responsible for the implementation of new projects, engineering changes and prototypes products Process improvements for productivity, down time and scrap reduction Optimizing and draw plant layout to improve productivity ,reduce un-necessary materials handling Electrical, pneumatic and hydraulic services installations Promote,lead & support various Lean Manufacturing initiatives.. Update and revise Manufacturing Process Instructions (MPIs) Kaizen events for proper flow of manufacturing process and productivity Responsible for 5s audits, OEE , continuous improvement Introduction of self-directed teams as drivers to reach: Safety, Quality and cost reduction Show less

    • United States
    • Industrial Automation
    • 1 - 100 Employee
    • Manufacturing Engineer
      • Jan 2009 - Apr 2011

      San Luis Potosí y alrededores, México Responsible for implementing tooling changes initiated by the Engineering Change Procedure. Coordinating new Transfer programs Design of packaging for each model including packaging work instructions. 5s implementation and improvement of 5s monthly audit results Process analysis (time and motion study ,error proofing implementation) Conversion of production lines into Manufacturing Cells.

Education

  • Universidad Tangamanga, S.C.
    Ingeniero industrial
    2004 - 2009

Community

You need to have a working account to view this content. Click here to join now