Adnan Khloof

MEP Project Manager at ARANER Middle East District Cooling Services
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE
Languages
  • English -
  • Arabic -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • MEP Project Manager
      • Oct 2019 - Present

      ARANER is a Spanish company that includes all the engineering disciplines of Mechanical, Electrical, Arch, Civil and I&C. Due to the strong capabilities of ARANER, in addition to the contracting we were capable to construct many project on EPC contract base and design others. Technically, In ARANER I have experienced the design of all systems and mechanical equipment for industrial and commercial range like chillers with all compressors types and their manufacturing process, Cooling towers, all types of pumps, primary pumps, secondary pumps TES pumps, make up pumps, basket strainers, suction diffusers, side stream filtration, water treatment, chemical dosing systems, air separators, air compressors, TES Tanks (Steel and concrete), all types of Insulation systems, monorails, piping and valve packages up to 1500mm Dia., flow meters, electrical equipment and all control instruments, in addition to all the building MEP services that normally comes in plants on bigger scale and more complications with Authorities, add to this the experience of testing and commissioning of all above equipment and the full awareness about the authorities requirements and procedures to obtain the BCC. For the managerial and commercial disciplines, I have the required communications and personal skills of finding the suitable subcontractors and suppliers and negotiating their rates based on full knowledge of actual market rates and based on strong technical background, work procedures and resources, it is a part of my accountability also to build the work agreements for the contracts with subcontracts and suppliers and even with clients. Add to the managerial side the communications and correspondences with client to maintain the contractual and legal side with them safe and strong, in addition to maintaining the good relation with them and the consultant to maintain the continuity and expansion of the company business. Show less

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Mechanical Construction Manager
      • Sep 2017 - Oct 2019

      Plafond is a professional and big MEP contractor under the Emirates group that has done huge special projects in UAE that have left geographical features like One at Palm towers by Omniyat, HSBC head quarter, The Opus tower by Omniyat , Museum of the future. My rule of MEP Construction Manager, In Plafond I have learnt how to manage your project cash flow in case of financial crisis in order to hit the targets and the project completion on time. For the responsibilities and scope of work kindly refer the below clause of responsibilities and scope of work. Show less

    • United Arab Emirates
    • Construction
    • 400 - 500 Employee
    • Mechanical Project Engineer
      • Aug 2016 - Sep 2017

      Following all works at site. Monitor, coordinate and supervise site activities and subcontractors on a day-to-day basis and ensure that project goals are achieved within time frame, required quality and budget. Study all technical drawings, documents and any revision thereon. Raise technical query for any conflict information within the project technical documents. Prepare comparison documents report between tender documents and IFC documents in terms of materials quantities, specifications, and scope of work to commercial department to claim any variations in project objectives. Review to ensure that shop drawings generated at site are in accordance to the contract requirements and company's standards, for all disciplines. Technical back up in coordination with project team, propose solutions for conflicts and review RFIs. In charge of the issuance for the material and subcontractor technical submittals to clients. Support planning & cost department for generating schedules and tracking the progress. Support in issuing the projects' payments to client. All related to the positon of mechanical project engineer Show less

    • Construction
    • 700 & Above Employee
    • Mechanical Engineer
      • May 2013 - Jul 2016

      Projects: - Wafi Hotel Complex and mall expansion. - Wafi & Jaddaf District Cooling plants. -World Trade Center Expansion. Projects: - Wafi Hotel Complex and mall expansion. - Wafi & Jaddaf District Cooling plants. -World Trade Center Expansion.

    • Senior Mechanical Engineer
      • Feb 2012 - May 2013

      Projects: Arab American University/ Admission and Registration Dean Ship and Language Center The project is conditioned by VRF ( Variable refrigerant flow) air conditioning system with total refrigeration capacity of 300 T.O.R., in addition to the central ventilation system, elevators, firefighting system and plumbing works. Projects: Arab American University/ Admission and Registration Dean Ship and Language Center The project is conditioned by VRF ( Variable refrigerant flow) air conditioning system with total refrigeration capacity of 300 T.O.R., in addition to the central ventilation system, elevators, firefighting system and plumbing works.

    • Palestine, State of
    • Real Estate
    • 1 - 100 Employee
    • Mechanical Project Engineer
      • Jan 2010 - Feb 2012

      PROJECTS: 1- Presidential Guest Palace: The mechanical Systems in this project are : VRF system/ fresh air and exhaust systems/ firefighting system of 1000 GPM diesel electrical and jockey pumps for the sprinklers, fire cabinets, hydrants in the land escape for airstrips of two helicopter planes and 6 alarm stations/ hot and cold water supply/ drainage systems/5 rain and potable water cisterns with complete control system for charge and discharge of water / sanitary fixtures / Jacuzzi / wet sauna/ dry sauna/ 150 cubic meter swimming pool with developed filtering, circulation and over flow systems / solar panels and 360 kw boilers for heating system of swimming pool / fountains works for 5 reflected pools/ irrigation systems/ kitchen equipment’s/ and all mechanical systems are controlled by BMS system. My work included site works, quantity survey, shop drawings, design check, Material and shop drawings submittal, variation orders, prices offers, supplier's meets, supervisor meets and inspections …. Etc. 2- Grand Park Hotel Extension Project: I have worked as a site engineer for hot and cold water supply systems, drainage systems, sanitary fixtures, firefighting systems, swimming pools and fountains works. 3- Ministries Council Project: I have worked as a mechanical site engineer for heating system, cooling system, ventilation systems, fresh air systems, hot and cold water supply systems, Fuel piping system, gas piping system, sanitary works and firefighting systems. 4- Ministries Complex Project: I have worked as a mechanical site engineer for heating systems, hot and cold water supply system, Fuel piping system, gas piping system, sanitary works and firefighting systems. 5- MovenPick Hotel/ Ramallah: I worked on the balancing and testing for the HVAC systems(TAB) referring to the standards of NEBB & AABC Show less

Education

  • Birzeit University
    Bachelor's degree, Mechanical Engineering
    2004 - 2009
  • Birzeit University
    Bachlor of Mechanical Engineering, Mechanical Engineering
    2004 - 2009

Community

You need to have a working account to view this content. Click here to join now