Adil Ali Khokhar
Engineer Civil (Slope Stabilization and Tunnel) at Descon Engineering Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Descon Engineering Limited
-
Pakistan
-
Construction
-
700 & Above Employee
-
Engineer Civil (Slope Stabilization and Tunnel)
-
Aug 2018 - Present
Responsible toexecute all the construction activities according to plan, specification and approved drawings/design by the Engineer. Responsible for all underground and above ground excavation through drill and blast method. Responsible for all support work (shotcrete, rockbolt, wiremesh, lattice girders, steel ribs and Tensioned ground anchors) installation and testing. Preparation of Method Statement prior commencement of the construction activity at site. Assisting the site in reviewing the IFC drawing and their correct implementation at site. Assist the Construction Manager in selection of appropriate machineries and skilled Manpower for the construction of Spillway Slope Stabilization and Tunnels. Assistance in preparation of weekly, monthly report and look head. Show less
-
-
-
-
Associate Consultant Engineers
-
Sep 2015 - Jul 2018
Responsibilities in Underground Works: Construction supervision of Tunnel Excavation by drill and blast method in Hard rock and Mechanical excavation using jack hammer and excavators in soft ground (Terrace gravels). Construction supervision of tunnel support Installation using Shotcrete (plain and fiber reinforced), Dowels and bolts (fully cement grouted, Swellex Rock Bolts, expansion shell, self-drilling bolts), Wire mesh, Steel Ribs and Lattice Girders. Geological /Geotechnical tunnel face mapping, Rock mass classification and ground support evaluation by using NGI, Q-System and NATM. Logging Probe hole to optimize the ground condition ahead of tunnel face. Cast in place concrete lining of Headrace tunnel using hydraulic shutter and pump concrete (Invert cleaning, water handling, blinding concrete, setting out of shuttering, concrete pouring). Supervision of Pre-excavation and Post-Excavation Grouting in tunnels. Supervision of Contact Grouting behind the concrete lining. Show less
-
-
-
-
TBM Geologist
-
Sep 2013 - Mar 2015
Geological mapping during TBM (Tunnel Boring Machine) Excavation. Preforms test Assessment of rock through TST test. (Tunnel Seismic Tomography). Probe Drilling to optimize the ground condition ahead of tunnel face. Estimation of Initial and Final Support by using Q-system. Supervising application of Sprayed Shotcrete immediately after excavation or application behind the working tunnel face. Documentation (updating shift reports, LI & L2 support). Supervising the Installation of recommended support i.e. Shotcrete, wire mesh, Mining straps, Rock bolts (fully grouted, resin end anchored, swellex, and expansion shell), steel ribs, and ring beams etc. Site investigations, monitoring and review instrumentation readings,zinvolved in risk assessment i.e. Convergence Station, Multi-point Borehole Extensometer. Show less
-
-
Education
-
University of Azad Jammu and Kashmir
BS GEOLOGY -
University of Azad Jammu and Kashmir
MS GEOLOGY