Adil Ali Khokhar

Engineer Civil (Slope Stabilization and Tunnel) at Descon Engineering Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Azad Kashmir, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Engineer Civil (Slope Stabilization and Tunnel)
      • Aug 2018 - Present

      Responsible toexecute all the construction activities according to plan, specification and approved drawings/design by the Engineer.  Responsible for all underground and above ground excavation through drill and blast method.  Responsible for all support work (shotcrete, rockbolt, wiremesh, lattice girders, steel ribs and Tensioned ground anchors) installation and testing.  Preparation of Method Statement prior commencement of the construction activity at site.  Assisting the site in reviewing the IFC drawing and their correct implementation at site.  Assist the Construction Manager in selection of appropriate machineries and skilled Manpower for the construction of Spillway Slope Stabilization and Tunnels.  Assistance in preparation of weekly, monthly report and look head. Show less

    • Associate Consultant Engineers
      • Sep 2015 - Jul 2018

      Responsibilities in Underground Works:  Construction supervision of Tunnel Excavation by drill and blast method in Hard rock and Mechanical excavation using jack hammer and excavators in soft ground (Terrace gravels).  Construction supervision of tunnel support Installation using Shotcrete (plain and fiber reinforced), Dowels and bolts (fully cement grouted, Swellex Rock Bolts, expansion shell, self-drilling bolts), Wire mesh, Steel Ribs and Lattice Girders.  Geological /Geotechnical tunnel face mapping, Rock mass classification and ground support evaluation by using NGI, Q-System and NATM.  Logging Probe hole to optimize the ground condition ahead of tunnel face.  Cast in place concrete lining of Headrace tunnel using hydraulic shutter and pump concrete (Invert cleaning, water handling, blinding concrete, setting out of shuttering, concrete pouring).  Supervision of Pre-excavation and Post-Excavation Grouting in tunnels.  Supervision of Contact Grouting behind the concrete lining. Show less

    • TBM Geologist
      • Sep 2013 - Mar 2015

       Geological mapping during TBM (Tunnel Boring Machine) Excavation.  Preforms test Assessment of rock through TST test. (Tunnel Seismic Tomography).  Probe Drilling to optimize the ground condition ahead of tunnel face.  Estimation of Initial and Final Support by using Q-system.  Supervising application of Sprayed Shotcrete immediately after excavation or application behind the working tunnel face.  Documentation (updating shift reports, LI & L2 support).  Supervising the Installation of recommended support i.e. Shotcrete, wire mesh, Mining straps, Rock bolts (fully grouted, resin end anchored, swellex, and expansion shell), steel ribs, and ring beams etc.  Site investigations, monitoring and review instrumentation readings,zinvolved in risk assessment i.e. Convergence Station, Multi-point Borehole Extensometer. Show less

Education

  • University of Azad Jammu and Kashmir
    BS GEOLOGY
  • University of Azad Jammu and Kashmir
    MS GEOLOGY
    2016 -

Community

You need to have a working account to view this content. Click here to join now