Adersh K J

MEP Coordinator at AL HAJIRY TRADING LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Oman, OM
Languages
  • English Professional working proficiency
  • Hindi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • ELECTRICAL HSE ENGINEER
    DCRP OMAN
  • First Aider
    -

Experience

    • Oman
    • Civil Engineering
    • 100 - 200 Employee
    • MEP Coordinator
      • Feb 2017 - Present

      Project: Commercial and Residential Complex at Al Ansab ( 42000 SqMtr )Client: Royal Oman PoliceContract Management Supervision Consultant: ACMEProject Value: 31 Million USDDesignation: MEP Project CoordinatorDuration: 2020 MARCH – Till Date ( ON GOING )Project: Office Building for HSBC AT AL KHAWAIRClient: HSBCContract Management Supervision Consultant: ARCADIS / CENTRE POINTProject Value: 7 Million USDDesignation: MEP Project CoordinatorDuration: 2020 June – Till Date ( ON GOING )Project: FIT OUT OFFICE FOR AUTHORITY OF REGULATIONS Client: AUTHORITY OF REGULATIONSContract Management Supervision Consultant: Hoehler – Al SalmyProject Value: 3.8 Million USDDesignation: MEP Project CoordinatorDuration: 2019 Dec – 2020 MayProject: Commercial and Residential Complex at Muscat Hills ( 31000 SqMtr )Client: Sheik Abdulla Al Khalili and Sheik Sulaiman Al KhaliliContract Management Supervision Consultant: VIA Consultancy Project Value: 26 Million USDDesignation: MEP Project CoordinatorDuration: 2019 July – 2020 juneProject: OFFICE FITOUT JOB FOR ORPIC / OMAN OIL IN MGM ( 25000 SqMtr ) Client: ORPIC / OMAN OILContract Management Supervision Consultant: Hoehler – Al Salmy Project Value: 19 Million USDDesignation: SITE MANAGERDuration: 2019 April – 2019 June ( Fast Track Project )Project: Commercial and Residential Building at Al QurumClient: H E SALEM BIN AHMED BIN KHALFAN AL BARAMIContract Management Supervision Consultant: PANORAMA CONSULTANCY Project Value: 2.6 Million USDDesignation: MEP EngineerDuration: 2018 April – 2019 Jan Project: Al Mazaya Residential and Commercial Building at Phase 1 and Phase 2Client: Al Mazaya Holdings llcContract Management Supervision Consultant: EIDCProject Value: 29 Million USDDesignation: MEP EngineerDuration: 2017 Feb – 2018 Feb ( Fast Track Project ) Show less

    • MEP Engineer
      • May 2016 - Present

      Project: Construction of Jamah Al Qurum ( Qurum Mosque )Client: Ministry of Endowment and Religious Affairs Supervision Consultant: Mouroog Engineering ConsultancyProject Value: 10 Million USDDuties & Responsibilities: Analyze contractual documents including specifications and drawings.  Submission and getting approval of all Material Approval Submittals (MAS) and Sub-contractor approvals including all MEP Systems Prepare compliance statements in accordance with the project specifications and IFC drawings for review of consultant and client. Prepare and maintain Material Procurement Programme / schedule. Preparing, maintaining and updating material approval schedule and sub-contract schedule  Ensure material delivered to site meet the specification / approved MAS requirements and submit material inspection report. Conducting or organizing technical meetings with the suppliers / sub contractors and consultant. Liaising with consultant for the approval of inspections Preparation of shop drawings, method statement,Inspection Test plan , MIS (Material inspection report) Preparation of Work Inspection Report Preparation of Single Line Diagram Preparation of Riser diagram with refer to systems Plotting Enquiry, Receiving Offer, Techno Commercial Comparison with respect to specification, Issuing LPO”S and work orders Deals with following MEP Systems in projectElectricalo Lightingo Powero Television Systemo Telephone Systemo PA Systemo CCTV Systemo External LightingPlumbingo Installation of Sanitary Wareso Installation of Booster pumpso Installation of GRP Tanko Installation of Drainage Lines, Water Supply ( Hot Water and Cold Water ), AC Drain Line, Rain Water out let lineo Irrigation SystemHVACo Installation of Package Units with connection of supply air and return air with grills and diffuserso Installation of Spilt Units o Installation of Toilet Extract Fans Show less

    • MEP Facility Engineer
      • Sep 2015 - Apr 2016

      Project: Ras Al Hamra International School (LEED Certified Building) Client: Petroleum Development of Oman (PDO)Facility Management : Carillion Alawi LLCProject Value: 38.5 Million USDDuties & Responsibilities: Responsible for the management of a team of MEP technicians and supervisors overseeing the provision of maintenance to on site for MEP systems Responsible for performing equipment assessments facilities, preparing condition assessment reports, including system narrative descriptions and minor cost estimates. Diagnose malfunctioning systems, to locate the cause of a breakdown and correct the problem. Responsible for Preventive maintenance of all MEP Systems Responsible for monitoring of all MEP Systems . Other duties as may be specified by or through Facility Manager. Deals with following MEP Systems in projectElectrical Lighting Control System Central Battery System PAVA System AV System Stage lighting CCTV, Access Control and Intruder System Structured Cabling Fire Alarm SystemMechanical System Grey Water System Fire Fighting System Irrigation System Solar Water Heater Hot Water and Cold Water Booster Pump Lift ( Including Lift Monitoring )HVAC Chillers, AHU and FAHU etc BMS Show less

    • Electrical Engineer
      • Aug 2013 - Aug 2015

      Project: RAH PDO School (Designed for LEED Certification) Client: Petroleum Development of Oman (PDO)Design Consultant: KEOSupervision Consultant: Halcrow Middle EastProject Value: 38.5 Million USDDuties & Responsibilities: Analyze contractual documents including specifications and drawings.  Submission and getting approval of all Material Approval Submittals (MAS) and Sub-contractor approvals including Electrical and ELV Systems Prepare compliance statements in accordance with the project specifications and IFC drawings for review of consultant and client. Reviewing the details of every material for LEED requirements of the project in consultation with the LEED Coordinator. Prepare and maintain Material Procurement Programme / schedule. Preparing, maintaining and updating material approval schedule and sub-contract schedule  Ensure material delivered to site meet the specification / approved MAS requirements and submit material inspection report. Conducting or organizing technical meetings with the suppliers / sub contractors and consultant. Liaising with consultant for the approval of inspections Preparation of shop drawings, method statements, Inspection Test plan, Material inspection report Preparation of Work Inspection Report Preparation of Single Line Diagram Preparation of Riser diagram with refer to systems Plotting Enquiry, Receiving Offer, Techno Commercial Comparison with respect to specification, Issuing LPO”S and work orders Deals with following Electrical Systems in projecto Electrical System ( Including RMU , Transformers, Main LV panels, Sub Main LV Panels, Distribution Board )o Lighting Control Systemo Central Battery Systemo Fire Alarm Systemo CCTV Systemo Intruder Systemo Access Control Systemo Gate Barriero Disable Alarm Toileto Master Clock o Structured Cablingo PAVA Systemo AV Systemo Stage Lighting Systemo Facility Panelo Television System Show less

    • Electrical Engineer
      • Oct 2012 - Jul 2013

      • Prebid Preparation • Bill of quantity Preparation • MTO Preparation • Lighting illumination Calculation • Cable Tray Routing and Tray Calculation • Load Analysis, Short Circuit Calculation • Cable Sizing, Generator Sizing, Transformer Sizing • Preparation of technical electrical specification • Prebid Preparation • Bill of quantity Preparation • MTO Preparation • Lighting illumination Calculation • Cable Tray Routing and Tray Calculation • Load Analysis, Short Circuit Calculation • Cable Sizing, Generator Sizing, Transformer Sizing • Preparation of technical electrical specification

    • Shipbuilding
    • 100 - 200 Employee
    • Junior Electrical Engineer
      • Sep 2011 - Sep 2012

      • Responsible for full electrification of “ OFF SHORE SUPPORTING VESSEL “ • Includes fabrication, fitment, panel erection, installation, termination and commissioning • Completed 59m OSV for O.N.G.C • Responsible for full electrification of “ OFF SHORE SUPPORTING VESSEL “ • Includes fabrication, fitment, panel erection, installation, termination and commissioning • Completed 59m OSV for O.N.G.C

Education

  • V.M.K.V Eng. college
    Bachelor of Engineering (BE), Electrical and Electronics Engineering
    2007 - 2011
  • Vinayaka Mission's Research Foundation - University
    Bachelor's degree, Electrical and Electronics Engineering
    2007 - 2011
  • Adarsha Vidyabhavan
    +2
    2005 - 2007