Muhammad Adeel Khan

at Somcable Ltd.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Karāchi, Sindh, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Somalia
    • Telecommunications
    • 100 - 200 Employee
      • Apr 2017 - Present

      Major projects during the period 2017 to 2022:===============================* Somcable HQ Panel Design & Installation + Connection of Digital Power Analyzer 250 Amps. (SIEMENS)* Somcable HQ 02 Nos. of new ATS Installation 400 Amps. (Magnetic Type) (Schneider)* Somcable HQ Interfacing of 04 Nos. ATS to each other for three power sources in for HQ Building (Grid-1, Grid-2, and Standby Gen Set)* Somcable HQ Feed-B installation - 04 Nos. Power Racks (AC/DC) in the Data Center as a redundant power source for the network.* Backhaul Site with Solar Power 1.5 kWh Energy at Sharub Complete Installation – termination/connection – Commissioning of 36 Solar Panels and 24 Batteries and Power and control panel with 06 Nos. PV Chargers - 03 Nos. Rectifiers - 01 Nos. Inverters, 01 No. Gen-Set (10kVA)* Backhaul Site with Solar Power 3.0 kWh Energy at Burao Complete Installation – termination/connection – Commissioning of 72 Solar Panels and 48 Batteries and Power and control panel with 09 Nos. PV Chargers - 03 Nos. Rectifiers - 02 Nos. Inverters, 01 No. Gen-Set (10kVA) with ATS.* Backhaul Site with Solar Power 3.0 kWh Energy at Berbera Complete Installation – termination/connection – Commissioning of 72 Solar Panels and 48 Batteries and Power and control panel with 09 Nos. PV Chargers - 03 Nos. Rectifiers - 02 Nos. Inverters, 01 No. Gen-Set (10kVA) with ATS.* MSG Group Stone Crusher at Balligaas Area MCC Panel Installation – Cable laying – All the Motors connection – Gen-Set (400kVA), Installation and Commissioning etc. Show less

      • Sep 2015 - Mar 2017

      Major projects during the period 2015 to 2017:===============================* Somcable HQ 02 Nos. of ATS Installation 400 Amps. (Rotary Type) (Westhomes)* Somcable HQ 08 Nos. Electrical Panel Diagram for the whole building (As Build)* Somcable HQ 05 Nos. Racks in Data Center detail block diagram (As build - DC & AC Circuit)* SO! LTE Towers 20 Nos. SO! LTE Towers Complete Electrical Installation & Commissioning (Power Rack with Rectifiers and* Inverters and Controller, AC/DC wiring & Circuit Breakers +Panel box, Cable Tray, wiring Connections, etc.)* SO! Gasho Branches 10 Nos. SO! Gasho Branches Complete Electrical Installation & Commissioning (Power Panel, Cable Trunking, UPS Installation, ATS Installation & wiring Connections, etc.) Show less

    • Manager E&I
      • Oct 2012 - Aug 2015

      Major projects during the period 2012 to 2015: =============================== * Metro Cash Carry Pakistan. Project of Centralized Energy Metering - Energy Monitoring for different loads in the building and centralize all of them with industrial network and make ready to get access all data in Germany through Data Gateway. We did the same in all the Stations in Karachi, Lahore, and Islamabad. * Lucky Textile Mills. Project of Centralized Energy Metering - Energy Monitoring for different loads of industrial textile machines in the factory and centralize all of them with industrial network and make ready to get access all data in the control room through Data Acquisition System. Show less

    • Sr. E & I Engineer
      • Oct 2011 - Sep 2012

      Major projects of Boilers & Gen-Sets during the period 2011 to 2012: ============================================= * ASL Paper Mills, Karachi. 02 Nos. of WHRS Boiler 10 Bar on Engine Exhaust * Astro Plastic, Port Bin Qasim Karachi. 04 Nos. Oil Heaters on Engine Exhaust * Rajbi Textile Mills Landhi Karachi. 01 No. of WHRS Boiler 10 Bar on 1 Mega Watt Engine Exhaust - Caterpillar Natural Gas Engine * SNGPL Gen-Set - Lahore. Gas Gen-Set complete installation and commissioning with ATS Panel. (Doosan Gas Engine & Bokuk Aternator) Show less

      • Apr 2009 - Sep 2011

      Working as Engineer Instruments Operation / Maintenance (Terminal & Bulk Storage) and Shift Incharge at Terminal.After the Installation/Commissioning============================= Completion of LPG Tanks & Jetty: Working as a Shift Incharge of Terminal, Official Correspondence & Maintain Daily Operation Reports. Supervising of day-to-day Electrical/Instruments operation & maintenance activities. at Jetty & Bulk Storage area During offloading LPG from Ship, monitor overall Operation activities, process, and safety. Depute the staff on Jetty Head on Marin Loading Arm (MLA), Quick Release Hooks (for Ship ropes), Static Grounding Control Panel, Emergency Shutdown Valve (ESDV) and Fire Fighting Pumps and reported to Manager Terminal Operation & Administration (MTO&A) in an emergency as a control room Incharge. Responsible of PLC control system including firefighting system, also arrangement of the Fire Extinguishers & Fire Blankets at Jetty Head on the proper location. Responsible for all communication on the VHF wireless system with Port Qasim Authority. Calculation of LPG discharge from ship to Spherical Tanks after transfer. Show less

      • Feb 2006 - Mar 2009

      Working as Executive Instruments Operation / Maintenance (Terminal & Bulk Storage) and Shift Incharge at Terminal.During Installation/Commissioning of LPG Tanks & Jetty:============================================Inspection of all the Electrical, Instruments, Firefighting system, PLC controls & communication system Including Optical Fiber cables lying & installation activities as per standards (NEMA/NFPA)On this Project Working with:======================o SNC LAVALIN International (Main Contactor of Progas Pakistan Limited.)o China Shanghai (Group) Corporation for Foreign Economic & Technological Cooperation (SFECO) (Sub Contactor by SNC)o China Petroleum First Construction Company (CPFCC) (Sub-Contactor by SFECO for Electrical, Instruments, Mechanical work)o The Second Harbour Engineering Investigation & Design Institute (CHEC) (Sub-Contactor by SFECO for all Civil work) Show less

    • Asst. Instrument Engineer
      • Mar 2003 - Feb 2006

      Major projects of Boilers & Co-Generation Power plants during the period 2003 to 2006: ========================================================= * Gatro Power HRSG Boiler 60 Bar on Turbine Exhaust - Turbine: TURBOMACH, Switzerland - Co-Generation Power Plant at Gatro Power (Pvt.) Limited a subsidiary of Gatron (Industries) Limited, Hub, RCD Highway, Balochistan. * MCB Tower (Tallest Building of Pakistan 2005-2012) (WHRS Boiler 10 Bar on Turbine Exhaust) (Turbine: Kawasaki, Japan), at I.I Ch. Road Karachi. Friendship Textile Mills, (HRSG Boiler 10 Bar on Turbine Exhaust - Co-Generation) (Turbine: Kawasaki, Japan) at S.I.T.E., Karachi. * GATRON-2 (G-2) 03 Nos. of WHRS Boiler 10 Bar on 1 Mega Watt Engine Exhaust – Engine - DEUTZ Diesel Engines & Jenbacher Gas Engine * Siddique Sons Ltd. Site Karachi. 03 Nos. of WHRS Boiler 10 Bar on Engine Exhaust * Rajbi Textile Mills Korangi, Karachi. 01 No. of Water Tube Boiler 10 Bar on Natural Gas. * Ismail Industries Ltd. (Candy Land) Hub, Balochistan. 03 Nos. of WHRS Boiler 10 Bar on Engine Exhaust * Mustaqeem Dying Mills 01 No. of WHRS Boiler 10 Bar on Engine Exhaust. * SSGC HQ- Rohri Gas Gen-Set complete installation and commissioning with ATS Panel. (Doosan Gas Engine & Bokuk Aternator) Show less

Education

  • Dadabhoy Institute of Higher Education
    Bachelor of Technology (Hons), Electronics Engineering
    2005 - 2009
  • Govt College Of Technology (GCT HYD)
    Diploma of Associate Engineer (DAE), Electronics / Industrial Electronics Technology
    1997 - 2001
  • Govt Degree College & P.G Center Latifabad No: 11 HYD Sindh
    H.S.C. / Intermediate, Pre-Engineering
    1995 - 1997

Community

You need to have a working account to view this content. Click here to join now