Ade Adeyemo
Construction Planner at BOURNE STEEL (TRUSTEES) LTD.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
PMI Scheduling Professional (PMI-SP)
Project Management Institute -
PRINCE2® Foundation and Practitioner Certification Training
IT Certifications Training (ITIL, PRINCE2, CCNA, COBIT, CEH, CCNP, CISSP, etc)
Experience
-
BOURNE STEEL (TRUSTEES) LTD.
-
United Kingdom
-
1 - 100 Employee
-
Construction Planner
-
Oct 2019 - Present
Lead on planning to support delivery of benefits and outcomes. Support capacity building and the use of best practice in planning, scheduling and reporting.Developed a robust programme from design detailing through procurement construction and commissioning for construction packages (Station Building, Landscape and Fit-outs) Managed key stakeholders in the construction of resourced and cost loaded logic network Developed Monte Carlo analysis for risk register for contract delay (using P6 Pertmaster)Updated and agreed baseline incorporating all the later changes stemming from detailing design to the increased fabrication measures and its attendant costs implicationContinue mentoring of PMs and Package managers on the best use of planning suites
-
-
-
Galliford Try
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Construction Planner
-
Jul 2016 - Sep 2019
Developed and oversaw the individual project schedules and integrated overall master programme schedules for Gallifordtry Portfolio Schemes Provided support and backup to sales, resolving materials, manufacturing + fabrication issuesManaged critical projects of high valuation across multiple clients and supply chain Developed and oversaw the individual project schedules and integrated overall master programme schedules for Gallifordtry Portfolio Schemes Provided support and backup to sales, resolving materials, manufacturing + fabrication issuesManaged critical projects of high valuation across multiple clients and supply chain
-
-
-
Balfour Beatty plc
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Principal Planner
-
Sep 2015 - Jul 2016
Lead Planner for Railway Track Renewal, PLF Extension and Station M&E Fit outs Worked with key stakeholders to manage the deployment of all aspects of the project Lead Planner for Railway Track Renewal, PLF Extension and Station M&E Fit outs Worked with key stakeholders to manage the deployment of all aspects of the project
-
-
-
London Underground
-
United States
-
Renewables & Environment
-
300 - 400 Employee
-
Senior Planner
-
Feb 2015 - Jul 2015
Vauxhall Station upgrade : SCL tunnels/adits and fit out works; preparing overall contractor control programmes for acceptance Vauxhall Station upgrade : SCL tunnels/adits and fit out works; preparing overall contractor control programmes for acceptance
-
-
-
COLAS
-
France
-
Construction
-
700 & Above Employee
-
Senior Project Planner
-
Aug 2014 - Feb 2015
Construction/Forensic Planner Primavera 8.2 (Civil, P-way, E&P, Signalling, Commissioning) Construction/Forensic Planner Primavera 8.2 (Civil, P-way, E&P, Signalling, Commissioning)
-
-
-
NG Bailey
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Senior Planning Engineer
-
Nov 2013 - Jul 2014
Amplification of tender programmes to detail level 6 schedule for onsite construction and contract reporting Amplification of tender programmes to detail level 6 schedule for onsite construction and contract reporting
-
-
-
-
Construction Planner
-
Mar 2013 - Oct 2013
Commercial Builds - Ground engineering, Piling Ground works, sub utilities Commercial Builds - Ground engineering, Piling Ground works, sub utilities
-
-
-
Inviron (rebranded to Dalkia UK)
-
United Kingdom
-
Facilities Services
-
300 - 400 Employee
-
Construction Planner
-
Apr 2012 - Mar 2013
New build of Health and Residential - Civil and Fit-out works New build of Health and Residential - Civil and Fit-out works
-
-
-
-
Senior Planning Engineer
-
Nov 2010 - Apr 2012
Hydrocyclic hard Piping – Produced water Project, Temporary Diesel storage tank ProjectExtended Reach Driling (ERD)Fixed Platform: Module fabrication, dry docking, transportation, installation and decommissioning Hydrocyclic hard Piping – Produced water Project, Temporary Diesel storage tank ProjectExtended Reach Driling (ERD)Fixed Platform: Module fabrication, dry docking, transportation, installation and decommissioning
-
-
-
Carrillion Construction
-
Nigeria
-
Construction
-
1 - 100 Employee
-
Project Planner
-
Sep 2008 - Sep 2010
The project to enhance the network between south Acton and Stratford/Barking to improve rail servicesDesign and construction of the civil engineering, track overhead line + power supply aspects of the projectRenewing 6 km of track, installation of 17,000 metres of OHL, 583m of station platform built between Gospel Oak and Stratford and the installation of 23km of signalling cable. The project to enhance the network between south Acton and Stratford/Barking to improve rail servicesDesign and construction of the civil engineering, track overhead line + power supply aspects of the projectRenewing 6 km of track, installation of 17,000 metres of OHL, 583m of station platform built between Gospel Oak and Stratford and the installation of 23km of signalling cable.
-
-
-
-
Planning Engineer
-
Jan 2005 - May 2007
A leading worldwide marine solutions company: Services include design, fabrication, transportation and installation of offshore platforms, and installation of offshore pipelines.• Preparation and the management of construction schedules for module built, transportation and construction.• Creating and monitoring Engineering and Procurement schedules of long lead items.• Creating offsite module fabrication trackers• Tracked activities and prepared general project reports.
-
-
Education
-
Imperial College London
MSc, Engineering -
Obafemi Awolowo University
Bsc, Physical Sciences