Adam Liu

Senior Project Manager at Procter and Street
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chester, England, United Kingdom, UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Highways Common Induction
    National Highways
    Mar, 2022
    - Oct, 2024
  • Controlling Health Risks in Construction
    British Occupational Hygiene Society (BOHS)
    Sep, 2018
    - Oct, 2024
  • DBS Enhanced Certificate
    Disclosure and Barring Service DBS
    May, 2015
    - Oct, 2024
  • NEC4: ECC Project Manager Accreditation
    Institution of Civil Engineers (ICE)
    Apr, 2023
    - Oct, 2024
  • Site Management Safety Training Scheme (SMSTS)
    CITB
    Dec, 2021
    - Oct, 2024
  • Mewps for Managers
    International Powered Access Federation (IPAF)
    Jun, 2021
    - Oct, 2024
  • First Aid at Work
    St John Ambulance
    Oct, 2022
    - Oct, 2024
  • Construction Skills Certification Scheme (CSCS) - Academically Qualified Person
    CITB
    Nov, 2019
    - Oct, 2024
  • Site Environmental Awareness Training Scheme (SEATS)
    CITB
    Feb, 2019
    - Oct, 2024
  • Temporary Works Coordinator
    CITB
    Nov, 2018
    - Oct, 2024

Experience

    • United Kingdom
    • Business Consulting and Services
    • 1 - 100 Employee
    • Senior Project Manager
      • Apr 2022 - Present
    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Project Manager
      • Jan 2020 - Mar 2022

    • Site Agent
      • Jan 2019 - Dec 2019

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Sub Agent
      • Feb 2018 - Dec 2018
    • United Kingdom
    • Facilities Services
    • 700 & Above Employee
    • Sub Agent
      • Jun 2017 - Jan 2018

      Sub Agent overseeing Section 1 Central Reserve, a 5km section of the M60 between J8 and J11, responsible for the following: • Management of all Sub-contract packages.• Producing and running the construction programme for the Section.• Overseeing the production and handover of quality documentation.• One month pre-planning prior to commencement of the phase which resulted in significant Value Engineering savings by proving the condition of the existing drainage network and reducing the amount of new drainage to be installed.• Significant cleansing of the existing drainage network including patch repairs and dig down repairs.• Removal of 5km of existing double sided steel VRS including 16 parapets on underbridges.• Structural concrete repairs to 8 existing underbridges, followed by re-waterproofing to the bridge decks and concrete foundation works for new CSB installation.• Installation of 5km of slipformed CSB including 30 hand laid transitions into and around existing structures. • Modification of 40 existing manholes, up to 2.1m in diameter and 3m in depth.• Installation of new surfacing including correction of the existing carriageway crossfalls. Show less

    • Section Engineer
      • Jun 2016 - May 2017

      Section Engineer overseeing earthworks and drainage in Section 5 Central Reserve, an 8km section of the M62 between J18 and J20 responsible for the following:• Management of the earthworks and drainage sub-contract package.• Producing and monitoring a three weekly earthworks and drainage construction programme.• Six months pre-planning prior to commencement of the central reserve phase to develop the most efficient construction methodology. This included carrying out detailed design reviews and the submission of a number of design change requests, engaging with key members of the supply chain to understand the latest available technologies that could be utilised, and leading ECI style workshops with sub-contractors.• Excavation and removal of over 20,000m3 of topsoil, sand and redundant VRS foundations.• Import and placement of over 20,000m3 of recycled Type 1 material.• Installation of 7.5km of 300mm diameter carrier pipe.• Installation of over 500 outfall connections ready for new slipformed surface water channel and slot drain.• Modification of 80 existing manholes, up to 6m in depth and 2.4m in diameter. Show less

    • Site Engineer
      • Jun 2015 - May 2016

      Site Engineer on the M60 J8 to M62 J20 Smart Motorway Scheme. Working as part of the earthworks and drainage team, I was responsible for the following:• Installation of 6km of ACO combined kerb drainage, including outfall connections to existing carrier pipe.• Installation of 1km of Gatic slot drain, including outfall connections to existing carrier pipe.• Installation of over 300m of attenuation drainage pipe, up to 900mm in diameter and 6m in depth, along with 10 complex manholes to control the flow of surface water run-off back into the existing network.• The strengthening of 60 manhole covers located in the hard shoulder to facilitate All Lane Running. Show less

    • France
    • Railroad Equipment Manufacturing
    • Engineering Intern (Highways)
      • Jul 2014 - Sep 2014

      During my final summer break from University I completed a Highway Engineering Design Placement with CH2M Hill. With a predominantly site-based Contracting background, this placement gave me the opportunity to further develop my skills by working on a different side of the industry, it also gave me further experience to draw upon during my final year of study. Work included: •Area 7 - Batch 5 & 6 Schemes (Highways Agency) - Responsible for the production of detailed design drawings, sections and plans, ensuring that all drawings met the required CAD standards. Updating drawing registers and document control registers for the relevant schemes, and the compilation of TTRO’s. •Area 12 - Pinch Point Schemes (Highways Agency) - I worked as part of the team responsible for the production of the proposed design drawings and communication plans for the Client. Corresponding with relevant stakeholders, and contacting Statutory Undertakers within the scheme areas, identifying which undertakers may be affected by the proposed works. •Hoobrook Link Road (West Midlands Highways Alliance) - Assisted with the collation and production of Statutory Undertakers information, as well as detailed design drawings up to the final stage for drainage layouts, road pavements, road markings, traffic signs and footways. Show less

    • Australia
    • Real Estate
    • 700 & Above Employee
    • Site Engineer
      • Jul 2013 - Dec 2013

      Site Engineer responsible for maintaining the accuracy and quality of all works packages on new living accommodation blocks for 150+ Infantry Officers. Packages included: • Service diversions and installations. • 6000 m3 cut and fill exercise. • CFA piling. • Groundworks (including drainage, ground beams and ground floor slabs). • Steel frame erection. • Pre-cast concrete upper floors. • Bathroom pod installation. • Masonry and curtain wall facades. As well as maintaining all quality control systems, including concrete quality and testing and as-built service drawing updates. Show less

    • Site Engineer
      • Mar 2011 - Sep 2012

      I later worked on a variety of projects both in terms of scale and Client type, allowing me to develop my engineering knowledge whilst also taking more responsibility for the day to day running of projects. Notable projects included:• Salford Royal Hospital (Balfour Beatty) - Works included construction of three internal courtyards with difficult access. Liquid roofing was carried out to waterproof the hospital plant rooms below, and vent houses constructed to allow ventilation of the plant rooms.• Eastside City Park (Wates Construction) - Works included the importing of over 16,000 tonnes of manufactured soils, the planting of over 300 semi-mature trees and 40,000 shrubs as well as over 6,000 square metres of formal turfing and 2,000 square metres of seeding. • Library of Birmingham (Carillion) - Although relatively small in size and value, this was an extremely complex and logistically challenging project. Works included concrete upstands to existing pump chambers, surface water drainage, gas membrane installation, a 200 square metre attenuation tank, 200 square metre reinforced slab including Type 1 build up, end finally 200 square metres of intricate granite paving with stainless steel inlays and custom made stainless steel drainage channel and manhole covers.Throughout, typical duties included;• Organising and supervising works on site.• Producing and implementing Risk Assessments and Method Statements.• Producing programmes and progress reports.• Liaising with and working alongside Principal Contractors.• Liaising closely with Clients, Administrators and Architects.• Creating, implementing and managing QA and permit systems.• Ordering and reconciling materials.• Understanding and adhering to drawings and specifications.• Working closely with commercial departments to ensure projects were delivered on budget.• Implementing environmental plans and targets set out by the company.• Setting up and maintaining compliant welfare facilities. Show less

    • Assistant Site Engineer
      • Aug 2009 - Feb 2011

      Assistant Site Engineer on the prestigious MediaCity:UK development, whilst studying part-time for a HNC in Civil Engineering Studies. Spending 18 months on this large-scale project provided reinforcement for my theoretical studies as well as giving me the opportunity to develop lasting contacts within the industry. Typical duties included:• Setting out and monitoring of works using total stations and automatic levels.• Supervising works on site including multiple sub-contractors and direct labour.• Liaising closely with Clients’ representatives.• Producing site reports for Senior Engineers and Project Managers.• Checking schedules against drawings and liaising with designers over changes.• Managing QA systems including permits, technical queries and early warnings.• Accurate record keeping and quantifying materials.Works included over 35,000 square metres of high specification granite paving, kerbing and tarmac, over 5,000 square metres of soft landscaped areas, almost 3,000 square metres of natural stone cladding, as well as all associated earthworks, drainage and concrete structures. Show less

Education

  • Liverpool John Moores University
    Master of Engineering (MEng), Civil Engineering
    2012 - 2015
  • Liverpool John Moores University
    Higher National Certificate (HNC), Civil Engineering Studies
    2010 - 2012
  • West Cheshire College
    BTEC National Diploma, Construction and the Built Environment
    2008 - 2010
  • Wirral Grammar School
    AS-Level, Modern History, Law, English Language, General Studies
    2008 - 2009
  • Wirral Grammar School
    GCSE, English Lang, English Lit, History, Geography, Maths, Physics, Biology, Chemistry, DT, Art & Design
    2003 - 2008

Community

You need to have a working account to view this content. Click here to join now