Adam Ibnu Salam

Electrical Engineer at PT. Dago Energi Nusantara
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bandung, West Java, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Indonesia
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Engineer
      • Jul 2022 - Present

      Pengadaan Jasa Design Engineering Elektrifikasi PL-403 dan PL-404 Area Kamojang PT Pertamina Geothermal Energy • Grounding and Lightning Calculation report. • Lighting Calculation report. • Material Take Off Electrical report. • Datasheet Transformers. • Datasheet MV, LV and Power Board Distribution Panel Report. FEED Water Processing Facilities di Lapangan Minas PT Pertamina Hulu Rokan • Load List report. • Datasheet Transformers. FEED OPLL SLO Stage-2 Rangau GS PT Pertamina Hulu Rokan • Load List report. • Illumination Study report. • Cable Sizing Show less

    • Indonesia
    • Financial Services
    • 300 - 400 Employee
    • Building & Maintenance Officer
      • Mar 2021 - Jun 2022

      • Reviewing job offers from vendors for repairs at OTO Group all Branches Office and Head Office on phone (AC, Electrical, Surveillance System, Interior, Genset). • Maintenance AC, Electrical, Surveillance System, Interior and Telephone in Head Office if any complaint. • Supervise interior, ME, Voice, and Data Relayout Branch Office and Head Office. • Building measurement survey. • Design drawing result of measurement survey on Autocad. • Drawing layout plan. • Detail Engineering Design. • Calculate budget plan. Show less

  • PT. Siwa Bangun Persada
    • Bandung, West Java, Indonesia
    • Electrical Engineer
      • Jul 2020 - Dec 2020

      • Supervise waterway construction occupation. • Weekly reports (Daily report, summary progress report, curve S, and general layout plan). • Survey for medium voltage network 20 kV pole. • Calculate the capacity of the electric motor for the intake gate. • Create DED report for medium voltage network 20 kV construction Mini hydro Power Plant Cikaengan 3x1.7 MW. • Supervise waterway construction occupation. • Weekly reports (Daily report, summary progress report, curve S, and general layout plan). • Survey for medium voltage network 20 kV pole. • Calculate the capacity of the electric motor for the intake gate. • Create DED report for medium voltage network 20 kV construction Mini hydro Power Plant Cikaengan 3x1.7 MW.

    • Indonesia
    • Higher Education
    • 100 - 200 Employee
    • Laboratory Assistant
      • Sep 2019 - Nov 2019

      • Calculate Matriks Admittance Bus with Matlab. • Simulation of Short Circuit with Matlab and Etap. • Simulation of Power Flow Analysis with Matlab and Etap. • Simulation of Transient and Steady-State with Matlab and Etap. • Calculate Matriks Admittance Bus with Matlab. • Simulation of Short Circuit with Matlab and Etap. • Simulation of Power Flow Analysis with Matlab and Etap. • Simulation of Transient and Steady-State with Matlab and Etap.

    • Indonesia
    • Utilities
    • 700 & Above Employee
    • Internship
      • Jan 2018 - Feb 2018

      Making a report with the title “Analysis of Grounding Resistance 70 kV Overhead Transmissions Lines Tower Footing Cigereleng-Majalaya Route” Making a report with the title “Analysis of Grounding Resistance 70 kV Overhead Transmissions Lines Tower Footing Cigereleng-Majalaya Route”

Education

  • Institut Teknologi Nasional (ITENAS)
    Bachelor degree, Electrical Engineering
    2015 - 2020

Community

You need to have a working account to view this content. Click here to join now