Adam Di Labio

Assistant Unit Controller at Loy Yang Power
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Melbourne Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Utilities
    • 1 - 100 Employee
    • Assistant Unit Controller
      • Jul 2017 - Present

    • Unit Attendant
      • Nov 2013 - Present

      Assistant Unit Controller

    • Operations Unit Attendant
      • Oct 2006 - Nov 2013

      I assist with the running up and shutting down of the unit using Yokogawa Digital Control System. As a Unit Attendant at Newport Power Station my duties include routine checks of running plant, problem solving and diagnosis of any abnormality within the Boiler, Turbine, Water Treatment Plant and auxiliary plant. I am also required to provide feedback to the Senior Plant Controller on the units running condition and report any defects to the Maintenance Manager. On yearly outages my supervisory skills are utilised to manage the tasked assigned to me. These tasks range from Boiler inspections, repairs and any modifications required to the plant.

    • Oil and Gas
    • Operator/maintainer (Unit attendant)
      • Jun 2002 - Nov 2006

      Daily duties I carry out are Boiler, Turbine, Water Treatment Plant, Materials Handling and Ash System inspection to be reported back to the Panel Operator. Running up and shutting down Boilers and Turbine, Process systems, cleaning or minor maintenance. To prepare permits including Job Safety Analysts for the maintenance section at the start of shift. I also supervise and prepare contractors and equipment for yearly outage work. (February 2006- October 2006)Prior to this position I was employed as a Fitter/special class welder at Redbank Power and my duties were to carry out any required maintenance. (June 2002-Feburary 2006)

    • Electric Power Generation
    • 700 & Above Employee
    • Commissioning Fitter
      • Nov 2000 - Jun 2002

      Installation and commissioning of plant equipment e.g. valves, pumps, motor alignment, coal feeders, soot blowers, coal crusher, conveyor belt alignment etc. Also involved in the implementation of plant modification and design as required to meet the contractual agreement. Installation and commissioning of plant equipment e.g. valves, pumps, motor alignment, coal feeders, soot blowers, coal crusher, conveyor belt alignment etc. Also involved in the implementation of plant modification and design as required to meet the contractual agreement.

Education

  • Yallourn Tafe
    -

Community

You need to have a working account to view this content. Click here to join now