Adam Crain
Project Superintendent at Mountain Productions, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Mountain Productions, Inc.
-
United States
-
Entertainment Providers
-
1 - 100 Employee
-
Project Superintendent
-
Jan 2019 - Present
-
-
Lead Rigger, Venue Installations
-
Apr 2017 - Dec 2018
-
-
-
-
Rigger
-
Jun 2007 - Present
-
-
Permanent Installation Tech
-
Jul 2009 - Apr 2017
Safely and efficiently install permanent rigging anchors on-site.Read plots and measurements to ensure accurate placement of anchors.Ensure proper utilization of equipment in various loading scenarios.Rigger/Fly-Rail Operator 2008-CurrentEvaluate structural needs and produce thorough recommendations and plans.Manage movement and transfer of scenic elements and backdrops on schedule during show.Load and operate fly rail with a variety of scenic elements and lighting instruments.Chain Hoist InspectorResponsible for complete tear down, inspection and reassembly of various makes and models of chain hoists.; Install chain hoists used for theatrical lifting. Inspect all components in rigging systems, including hoists, wire rope slings, span sets and galvanized cable/polyester round slings, truss, ropes, and carabineers to determine suitability for tasks at hand. Determine and implement solutions for the movement, installation and removal of a variety of materials, including truss towers, truss mother grids, and scaffolding.Stagehand 2002 - 2005Assisted in the assembly and dismantle of show, concert and corporate events.Provided temporary installation of lighting, audio and video equipment.Constructed sets, stages, and scenic elements quickly and efficiently. Show less
-
-
-
-
The Black Keys Production Rigger / Automation Tech
-
Aug 2014 - Aug 2015
-
-
-
-
Automation Technician
-
Jun 2013 - Jan 2015
-
-
-
-
Tour Rigger
-
Aug 2012 - Dec 2012
-
-
-
-
Production Rigger
-
Jan 2008 - Mar 2012
-
-
-
-
Acting Lead Rigger
-
Jan 2008 - Dec 2011
Coordinate and manage a team of riggers to efficiently complete installation and removal of show equipment. Work closely with all departments of touring crew to exceed performance expectations. Utilize available resources to train and develop team abilities. Coordinate and manage a team of riggers to efficiently complete installation and removal of show equipment. Work closely with all departments of touring crew to exceed performance expectations. Utilize available resources to train and develop team abilities.
-
-
-
-
Lead Rigger
-
Jan 2008 - Dec 2009
Measure out equipment locations for trusses and audio arrays with accuracy. Communicate effectively with on site client to assess needs and discover solutions for delivery of successful show. Worked high profile events, including: 2009 Thanksgiving Day Half-time show at Cowboys Stadium Cowboys Stadium Invitational Gala with Diana Ross Measure out equipment locations for trusses and audio arrays with accuracy. Communicate effectively with on site client to assess needs and discover solutions for delivery of successful show. Worked high profile events, including: 2009 Thanksgiving Day Half-time show at Cowboys Stadium Cowboys Stadium Invitational Gala with Diana Ross
-
-
-
-
Rigger
-
Jun 2007 - Jul 2008
Coordinated all rigging tasks associated with setup and dismantle of events. Supported temporary installation of advanced electrical equipment. Provided planning and implementation of solutions for the movement, installation and removal of supporting show elements and systems. Coordinated all rigging tasks associated with setup and dismantle of events. Supported temporary installation of advanced electrical equipment. Provided planning and implementation of solutions for the movement, installation and removal of supporting show elements and systems.
-
-
-
-
Field Automation Tech
-
Oct 2005 - Oct 2006
Installed and provided troubleshooting for complex postal automation systems for the United States Post Office. Managed inventory of components and inspected items thoroughly. Assembled and adjusted dozens of modules to precise working tolerances. Repaired component level technology, including advanced interfaces, multi-level Emergency Stops/ Interlock safety devices and monitoring software/hardware. SKILLS Full understanding of OSHA fall arrest regulations and ANSI standards related to the Production/Construction/General Industry classifications. Professional experience with a variety of systems: Columbus Mckinnon, Chain Master, Stagemaker Chain Hoists Rope access techniques required for work at height and access to difficult areas 208 3-phase A/C 110 single phase A/C 5v and 24v DC Data systems including optical/digital, RS 422/232 Multiple-processor computers Show less
-
-
Education
-
Columbus Mckinnon Hoist