Abuzar Ali Khan
Senior Project Manager at VIP Meter Services- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Arabic -
-
Urdu -
-
Punjabi -
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
VIP Meter Services
-
Canada
-
Utilities
-
1 - 100 Employee
-
Senior Project Manager
-
Jul 2023 - Present
-
-
Project Manager
-
Jan 2022 - Jun 2023
-
-
-
Gulf Industrial Systems Company (GISCO)
-
Saudi Arabia
-
Industrial Machinery Manufacturing
-
100 - 200 Employee
-
Project Manager
-
Apr 2021 - Sep 2021
-
-
-
saudi inteltec
-
Telecommunications
-
100 - 200 Employee
-
Lead Project Engineer
-
Jun 2016 - Jun 2021
•Working as a Lead Testing and commissioning engineer for Smart Metering system in Yanbu (sub-stations,power plant and commercial ) •Working as a Lead Testing and commissioning engineer for Smart Metering system in Yanbu (sub-stations,power plant and commercial )
-
-
-
Ejadah Management Consultancy
-
Saudi Arabia
-
Human Resources Services
-
1 - 100 Employee
-
Project Team Lead
-
Nov 2015 - Jun 2016
•WORK AT SITE AS A LEAD PROJECT ENGINEER AT HARMAIN HIGHSPEED RAILWAY PROJECT(HHR) LONG STAY CAR PARK. •Work at Site as A LEAD PROJECT ENGINEER AT Jabl e omer (Makkah) For tower S9-7A (19 floors),all electrical work include installation of lighting , lighting fixtures ,cable tray , slab work with pvc conduit, EMT, RGS conduits •WORK AT SITE AS A LEAD PROJECT ENGINEER AT HARMAIN HIGHSPEED RAILWAY PROJECT(HHR) LONG STAY CAR PARK. •Work at Site as A LEAD PROJECT ENGINEER AT Jabl e omer (Makkah) For tower S9-7A (19 floors),all electrical work include installation of lighting , lighting fixtures ,cable tray , slab work with pvc conduit, EMT, RGS conduits
-
-
-
-
Lead Testing and Commissioning Engineer
-
May 2011 - Oct 2015
All most 05 years of experience as Electrical Engineer at the below mentioned positions. • Working with the Sub-contractor company (QM) Jeddah, Saudi Arabia as Lead Testing and Commissioning Engineer at 380KV/110KV/13.8KV/480V substation projects (2011 – OCT 15). Following are the job details so far, • 380KV GIS Close loop of GIS with SAS (Substation Automation System). Interlock test with 110kv & 13.8kv systems. 380KV OHL and Cable line protection scheme CT and VT testing also secondary loop for both. Digital meters (ABB). BCU Measurements and Testing. • 110KV GIS and AIS Complete Scheme check of GIS and AIS Function tests of GIS and AIS Interlock test of GIS and AIS Closed Loop of GIS with SAS. Synchro-Loop Activity. BCU Measurements and Testing (ABB and Siemens) Bus bar Contact Resistance test of AIS and GIS. Digital meters and Transducers testing. SF6 Gauge Calibration and Testing. CT and VT testing also secondary loop for both. MCB’s, Timers and Auxiliary Relay testing. HIGH Voltage Test Primary Injection Test CB Testing • 13.8KV Switchgear Complete Scheme check of Switchgear. Closed Loop with SAS. Primary Injection and Stability. Testing of MFAC & CT supervision relay. VT and CT secondary injection tests. Digital meters testing. CB Testing Trip Test for the Over Current and Earth Fault Relay. Mechanical Interlocks. CT and VT testing. MCB’s, Timers and Auxiliary Relay testing. HIGH Voltage and PRIMARY Injection. OC and EF RELAYS Testing. • Control Room Scheme check for protection. Close Loop of Protection with SAS system. I/O Interface with SAS. Final Trip Test before Energization End to End Trip and Stability Test. Show less
-
-
Education
-
Hamdard University
Bachelor's of Electronic Engineering, Electrical and Electronics Engineering -
Hamdard University
Bachelor of Engineering (B.E.), Electronic