Abuthahir, BEng, PMP

Deputy Manager at Powergear Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chengalpattu, Tamil Nadu, India, IN
Languages
  • Hindi -
  • Urdu -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Erkan Karaali

I have had pleasure to work with Mr.Abu in northern Iraq for enclosed bus duct high voltage works. He was the person next to us with his all profession and full effort to finalize the scope of work within the particular time. You never need to deeply think for any issue which could stuck the work progress because Abu is next to you always, he keeps solutions always in his mind for unexpected catastrophic things. Just believe him and leave to work to his shoulders. Have a successful project finishes and good friendships Mr.Abu , hope all the bests with you. Erkan Karaali

LinkedIn User

Abu was the site technical responsible for the installation of the electrical AIS system from one of our subcontractors during the mechanical & electrical installations in the Cheves hydropower project in Peru. During his work on site he demonstrated excellent commitment to fulfill the tight requirements and completion of this part of the project. Abuthahir contributed to a good team spirit during his time on site and I can recommend him for further assignments.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Common safety orientation
    Energy Safety Canada
    Jun, 2023
    - Nov, 2024
  • ISO 19443:2018 QMS Nuclear Energy sector supplying products and services Important to Nuclear safety (Awareness)
    Nucleus Consultants
    Nov, 2020
    - Nov, 2024
  • Institution of Occupational safety and health (IOSH)
    British Safety Council
    Aug, 2017
    - Nov, 2024
  • Project Management Professional (PMP)
    Project Management Institute

Experience

    • India
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Deputy Manager
      • Aug 2020 - Present

    • Assistant Manager Designs
      • Sep 2015 - Nov 2022

    • Senior Engineer-Design
      • Jul 2010 - Nov 2022

      Senior Engineer - Design Engineering activities for ISOLATED PHASE BUSDUCT Engineering activities for Cubicles (NGT, NGR, PT, VT). Analyzing the customer specification and other inputs. Verification of Technical specification. Preparing list of required and received Input.  Planning and updating the DRS (Document release schedule). Initiating weekly meeting with PM for project progress and clarification. Validating Engineering documents according to client specification.  Evaluating tender documents. Preparation of Checklists for some engineering documents. Prepared in standardization of documents. BUSDUCT Design Preparing 3D Layout, Terminations, OGA, Sub assembly, Erection & Key and other contract drawing. Preparation of detailed Procurement BOM. Fabrication drawings from 3D Layout. Show less

Education

  • B.S. Abdur rahman crescent engg college
    Bachelor of Engineering (B.E.), Mechanical Engineering
    2007 - 2010
  • BSA Crescent Institute of Science and Technology
    Bachelor of Engineering - BE, Mechanical Engineering
  • Project Management Institute
    PMP
  • Project Management Institute
    PMP, Project Management

Community

You need to have a working account to view this content. Click here to join now