Abram Langston
Account Manager at Predictive Engineering- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Predictive Engineering
-
United States
-
Engineering Services
-
1 - 100 Employee
-
Account Manager
-
Jul 2023 - Oct 2023
Portland, Oregon, United States
-
-
-
Capvidia
-
United States
-
Software Development
-
1 - 100 Employee
-
Account Manager Enterprise Sales
-
Jun 2022 - Jul 2023
Houston, Texas, United States -Worked with clients to define ongoing product enhancements and design adjustments to meet evolving business needs. -Lead development pilots with customers to grow existing accounts and establish new sales accounts.
-
-
-
-
Owner
-
Sep 2019 - Jan 2022
Greater Denver Area -Built an efficient team to promptly respond to tenant concerns of over 40 companies. -Kept records accurate, detailed and fully compliant to meet state, local and federal requirements. -Implemented innovative customer-facing software solution increasing retention by 15%. -Devised business and marketing plans and prepared monthly financial reports.
-
-
-
Air Methods
-
Airlines and Aviation
-
700 & Above Employee
-
Project Engineer
-
Jan 2019 - Jan 2020
Englewood -Utilized expertise in GD&T to assist and oversee the development of over 100 technical manufacturing drawings that met 2 significant milestones in an over 5 million dollar contract with the Department of Defense. -Successfully presented complex design assemblies using PowerPoint and Solidworks to high ranking military personnel for final approval. -Insured ISP, ASTM and ITAR standards were met and kept during projects and managed drawing package using PDM -Sketched outline designs… Show more -Utilized expertise in GD&T to assist and oversee the development of over 100 technical manufacturing drawings that met 2 significant milestones in an over 5 million dollar contract with the Department of Defense. -Successfully presented complex design assemblies using PowerPoint and Solidworks to high ranking military personnel for final approval. -Insured ISP, ASTM and ITAR standards were met and kept during projects and managed drawing package using PDM -Sketched outline designs and used Solidworks to create detailed designs and specifications.
-
-
Mechanical Engineer
-
Jul 2018 - Dec 2018
Englewood, Colorado
-
-
-
Textron
-
United States
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Product Development Engineer II
-
Jun 2016 - Mar 2018
Mesa, AZ -Saved Textron $80k in operating costs in first by designing and implementing fixed-wing and rotor-wing component repairs -Used expertise in aircraft hydraulics to find, design and implement over 10 new successful product lines including tooling and fixtures -Key contributor in cross-disciplinary efforts to troubleshoot manufacturing challenges in order to maximize productivity. -Performed fabrication process reviews to streamline production techniques and methods for proposed items.
-
-
-
Carbon
-
United States
-
Manufacturing
-
300 - 400 Employee
-
Mechanical Engineer Intern
-
Jul 2015 - Aug 2015
Redwood City, California Designed and prototyped original 3D printing post-processing components that improved the speed and quality of 3D prints. First intern to design parts used on the beta round of 3D printers
-
-
-
Follett Higher Education
-
United States
-
Retail
-
700 & Above Employee
-
Apple Certified Repair Technician
-
Sep 2014 - May 2015
Tempe, AZ Diagnosed and repaired customers computers ranging from software bugs to cracked screens.
-
-
-
Action Target
-
United States
-
Defense & Space
-
100 - 200 Employee
-
Mechanical Engineering Intern
-
Aug 2012 - Dec 2013
Provo, Utah Area Initiated, created and implemented new employee training program that improved quality in manufactured products and turnaround time. Only intern in company to be sent on site to diagnose and repair product
-
-
-
PLAYTIME
-
United States
-
Design
-
1 - 100 Employee
-
Assistant Installer
-
Sep 2011 - Jan 2012
Korea, Mexico, Hawaii Worked with the client and co-workers to solve problems that arose during installation . Effectively completed each install 1-3 days ahead of schedule.
-
-
-
Brigham Young University - Idaho
-
United States
-
Higher Education
-
700 & Above Employee
-
Student Advisor
-
Apr 2011 - Aug 2011
-Assessed individuals graduation plans -Planned students semester courses -Reported activity using computer software -Worked with team members to organize and complete paperwork
-
-
Education
-
Arizona State University
Bachelor’s Degree, Mechanical Engineering -
Brigham Young University
Bachelor's degree, Mechanical Engineering -
Brigham Young University - Idaho
BS, Mechanical Engineering