Level 1 & 2 Bridge Inspection
ARRB - Australian Road Research BoardSep, 2023- Nov, 2024 -
Road Surfacings Spray Seals
Centre for Pavement Engineering EducationSep, 2023- Nov, 2024 -
Prepare Traffic Management Plans & Traffic Guidance Schemes
NSW GovernmentAug, 2023- Nov, 2024 -
Road Pavement Stabilisation Fundamentals
Centre for Pavement Engineering EducationMay, 2023- Nov, 2024 -
A to Z of DA's LEP's and DCP's: Answering and Processing Planning Enquiries
Local Government Training InstituteFeb, 2023- Nov, 2024 -
Learning Construction Estimating
LinkedInSep, 2021- Nov, 2024 -
Solibri Model Checker Essential Training
LinkedInMar, 2020- Nov, 2024 -
Proficient in Construction Mangement using MSP and Primavera.
CADD Centre Training Services Pvt Ltd.Jan, 2020- Nov, 2024 -
Primavera P6 Professional Fundamentals
OracleDec, 2019- Nov, 2024
Experience
-
MidCoast Council
-
Australia
-
Government Administration
-
100 - 200 Employee
-
Project Engineer
-
Mar 2023 - Present
-
-
Graduate Engineer
-
Aug 2022 - Feb 2023
-
-
-
IJ Build Group
-
Australia
-
Construction
-
1 - 100 Employee
-
Graduate Contract Administrator
-
Sep 2021 - Aug 2022
• Handled around 10 projects (Structural Steel Commercial) from Design to Erection stage worth more than 20 million AUD. • Reviewed the shop drawings like marking plans, assembly drawings, and single part drawings of various commercial warehouse construction projects (Steel) and verified whether they align with the project’s scope of work. • Actively involved in preparing and analysing contract variations, and summarised drafting, material, and site-work variations for the client's approval. • Prepared steel erection methodology and erection sequence for simple to complex projects containing 20 stages and 5 offices with the help of Tekla and Trimble connect. • Managed the material procurement (Purchase order) and prepared a cost analysis report highlighting the best value from various supplier quotes. • Actively liaised with project stakeholders in organising purchase orders, delivery dates, and any design clarifications (Design and Project Coordination) with the help of project management software like Procore and Workbench. • Coordinated the drawings at the IFA and IFF stages of the project by liaising with the draftsman and client engineers. Moreover, followed up with clients for open RFI responses. • Managed the drafting and material variations and calculated cost and time overruns, thereby organising the variation claims, Notice of Delay, and Extension of Time (EOT). • Reviewed and verified that the order confirmation list is one hundred percent matches with the purchase order list and at last the site delivery docket. Managed Drawing, Draftsman, Variation, RFI, and Progress claim registers. Show less
-
-
-
Freelancer.com
-
Australia
-
IT Services and IT Consulting
-
700 & Above Employee
-
Autocad Drafter
-
Jan 2020 - Dec 2021
• Drafted and revised the site layout, floor plan, structural plan, elevation of residential and commercial buildings in AutoCAD as per the client requirements and scope of the project. • Developed detailed drawings of houses (volume buildings) and members (wall, truss, roof, window, door) for builders costing (Elemental cost analysis) in CostX. • Utilized both 2D and 3D rendering tools with accurate dimensions to meet the project standards and specifications. • Prepared shop drawings for standard and modified standard projects using established drafting standards. Show less
-
-
-
Australia Post
-
Australia
-
Consumer Services
-
700 & Above Employee
-
Mail Sorter
-
Oct 2020 - Jul 2021
-
-
-
Sree Nithi Constructions
-
India
-
Site Supervisor and Quantity surveyor.
-
Jan 2019 - Dec 2019
• Supervised and coordinated sub-contractors in achieving daily project completion target. • Interpreted site drawings and plans to verify to sub-contractors are following design specifications. • Led the project team to move project in adherence with design, quality specification, schedule, and budget. • Produced material quantity take-off and calculated Bill of Quantity's (BOQ's) on both pre- and post-contract stages. • Generated site report on weekly basis, documented progress of project and Undertaken slump cone test on-site to ensure quality of concrete. Show less
-
-
Education
-
Deakin University
Master of Construction management, Building/Construction Site Management/Manager -
Mepco Schlenk Engineering College
Bachelor of Engineering - BE, Civil Engineering