Abigail Kender

Vice President of Projects at Armstrong Chemtec Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Allentown, Pennsylvania, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Matt Shope

Abby did a fantastic job as a 3-term co-op student in my group. She quickly learned the basics of ProE and grew her skills over the time she spent with us. She helped out on many new product development activities, both in design support and testing. When given her own projects, she took responsibility and drove them to successful completion. Abby was one of the best co-op students we have had on the ME team and her great attitude will be missed.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Vice President of Projects
      • Oct 2022 - Present

    • Member Board Of Directors
      • May 2022 - Present

    • Mechanical Engineer
      • Nov 2016 - Oct 2022

      *Detailed design of heat exchangers per ASME Section VIII Div. 1*Creation of drawings and models using AutoCAD, IronCAD, and Inventor*Interaction with drafters, shop personnel, project management, and quality departments*Training of new employees*Reviewing designs of other engineers

    • United States
    • Chemical Manufacturing
    • 700 & Above Employee
    • Project Manager, Hydrogen Energy Systems
      • Jun 2016 - Oct 2016

      *Managed projects from inquiry through commissioning for installation of hydrogen fueling stations.

    • CDP - HyCO and Energy Mechanical Engineer
      • Jul 2015 - Jun 2016

      *Design and construction support for hydrogen plants*Detailed design of pressure swing adsorber vessels*ASME BPVC

    • CDP - Maintenance Engineer
      • Jul 2014 - Jul 2015

      *Rotating Machinery - maintaining compressors, motors, pumps, etc.*Reliability Projects - implementing solutions to improve mean time to failure *Air Separation Plant *HyCO Plant

    • CDP - Cryo Systems Product Engineer
      • Aug 2013 - Jul 2014

      *Product Design and Standardization of Air Separation Plants*Project Development for upcoming bids*Cost estimation

    • Warehousing
    • 1 - 100 Employee
    • Mechanical Engineering Co-op
      • Jan 2011 - Aug 2012

      *3 rotation co-op *Pro/Engineer Wildfire 4 - modeling and surfacing *Creation of test fixtures *New product testing *Proof of concept models - some of which were turned into working designs *Design reviews *3 rotation co-op *Pro/Engineer Wildfire 4 - modeling and surfacing *Creation of test fixtures *New product testing *Proof of concept models - some of which were turned into working designs *Design reviews

Education

  • University of Pittsburgh
    Bachelor of Science, Mechanical Engineering
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now