Abhishek Jaiswal
Executive at RP Sanjiv Goenka Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Hindi Native or bilingual proficiency
Topline Score
Bio
Experience
-
RP Sanjiv Goenka Group
-
India
-
Consumer Services
-
300 - 400 Employee
-
Executive
-
Jul 2019 - Present
• 8.4 Years of experience in Project, Operations and Fuel Management in Energy Sector• Expertise in Fuel management, Process and Risk management.• Successfully delivered many Projects within time ambits.• Worked with multiple responsibilities, Implemented various IMS/EnMS certification for organization, Strategy Planning & Cost Optimization; demonstrated Predictive Analytics to keep up with energy & coal demand and maintenance of equipment
-
-
Planning and coal co-ordination engineer
-
Mar 2014 - Jun 2019
Spearheading a team of field engineers, successfully commissioned critical project equipment worth INR 2 Million within fixed deadlines & ensured phenomenal field quality parameters. Conducted Bidding & Contracting: Prequalification Exercise, dealt with bidding, RFP & approval documents. Risk Management: Identified potential risks & performed qualitative & quantitative risk analysis. Built positive stakeholder & business partnerships providing daily updates to resolve high priority issues. Vendor management: Coordinated & negotiated with different agencies such as Techpro, Thysen group, Via Vitea solutions etc. for seamless equipment procurement, commissioning and software development activities. Leading a team of planning engineers and 20 field engineers, defined roles, responsibilities and KRAs for plant operations across various areas; ensured training & development of the team to promote continuous learning. Root Cause Analysis for energy efficiency practices thereby ensuring savings of more than INR 190 Million worth of fuel per year and for critical equipment failures thus avoided emergency situations such as breakdowns. Worked with B2B power utilities (TANGENCO, NPCL, and MSLDC) and DAM/RTM markets for daily operations scheduling of power distribution. Commissioned CMS’ automation solutions for DSM (Demand Side Management) & ABT management. Coordinated and integrated with cross functional teams and external agencies for smooth plant operations. Planned short term and long term goals of the project with COO while analyzing criticality and feasibility. Exposure to IEX by analyzing power markets, forecasting market clear prices & setting up available blocks to bid. Conducted Risk Mitigation Planning with Top Management, decided on the Preventive Maintenance Schedules. Developed purchase scheduling of power plant spares resulting in optimal inventory and zero shortages. Show less
-
-
JMC -1 OPERATIONS
-
Mar 2014 - Mar 2014
WORKING WITH CESC LTD( RP-SG GROUP) 2*300MW POWER PLANT AT CHANDRAPUR AS ON JOB TITLE JUNIOR MANAGER CADRE IN OPERATIONS. Co-ordinate with OEM for conducting performance guarantee test of Boiler, Turbine, Generator and ESP of both units. Conducting heat rate and boiler efficiency tests at regular intervals (monthly). Regularly conduct drains passing survey to avoid any unwanted heat loss from the turbine cycle. Optimizing APC by analyzing power consumption pattern of various sub-systems like CHP, AHP, WTP, etc. and individual motor feeders if required. Standardized coal sampling practices for feeder coal sampling to calculate daily heat rate. Reporting the heat rate deviations on daily basis and taking steps to minimize the controllable deviations. Played a key role in implementation of IMS (ISO 9001, ISO 14001, and ISO 45001). Conducting motor trials, pump, fan trials logic checking of all systems including MFT, ETS & GRP, water line flushing, Lube Oil system flushing, switch gear charging, transformer charging. Experience in BTG and auxiliary commissioning and routine operational activities. Looking after reporting and data management & analysis part of received coal. Establishment of Preventive maintenance schedules for all the plant equipment of BTG, BOP, AHP, CHP etc. and Coordination with departments for Planning and Ensuring timely completion of PM, Gap analysis to be done on daily basis. Maintenance management including corrective maintenance, preventive maintenance and condition based maintenance. Compilation of Outage activities planning, scheduling, preparing bar charts and monitoring compliance of the same. Preparation of presentation of plant project status in MS Project, maintaining status of different planning activities. Show less
-
-
-
Essar
-
India
-
Investment Management
-
700 & Above Employee
-
CHP O&M engineer
-
Jul 2013 - Mar 2014
I worked 9 months at Essar power mp ltd mahan as an CHP O&M engineer under contract basis. I worked 9 months at Essar power mp ltd mahan as an CHP O&M engineer under contract basis.
-
-
-
Jindal Steel & Power Ltd.
-
India
-
Mining
-
700 & Above Employee
-
PG-DC from Jindal institute of power technalogy
-
Aug 2012 - Jul 2013
Did one year power training from jindal institute of power technology at 4*250mw & 4*600mw power plant tamnar raigarh Did one year power training from jindal institute of power technology at 4*250mw & 4*600mw power plant tamnar raigarh
-
-
Education
-
Nagpur University
M.Tech, Energy Management and Systems Technology/Technician -
JINDAL INSTITUE OF POWER TECH
PGTPPT, POWER PLANT TRAINING -
Uttar Pradesh Technical University
Bachelor of Technology (B.Tech.), Electrical, Electronics and Communications Engineering -
govt inter college allahabad
inter, science stream -
2004
high school, science