Abdur Razag Elghawi

Facilities Management Specialist at MAR Facilities Management
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK
Languages
  • Arabic -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Geoff Willetts

Abdur had worked for me on my previous Contract (CTRL 320 Thames tunnels) and was found to be reliable, trustworthy and a valued member of my site team. He then reported directly to me on the LLVC Tunnels Contract (Olympics) again becoming a valued member of my new team. I would have no hessitation in reemploying him if the position arose in the future.

Peter Robertson MCIOB, MCInstCES, MICCP, QSI

I have known and worked with Abur for some years. He is a very able and hard-working team player, whose standard of work is consistantly high. He is very professional in all aspects of his work, and I would thoroughly recommend him.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Facilities Services
    • 1 - 100 Employee
    • Facilities Management Specialist
      • Apr 2020 - Present

    • United Kingdom
    • Construction
    • 700 & Above Employee
    • Facilities Coordinator
      • Apr 2016 - Apr 2020

    • Germany
    • Mechanical Or Industrial Engineering
    • 700 & Above Employee
    • Facilities Engineer
      • Oct 2014 - Mar 2016

      Freelance with Bilfinger facility management. Currently working at L'Oreal head office in London Freelance with Bilfinger facility management. Currently working at L'Oreal head office in London

    • Lebanon
    • Construction
    • 300 - 400 Employee
    • Planning Manager
      • Oct 2010 - Sep 2014

      - Establish and define project control procedures - Identify the level of resources required for the project - Develop a suitable Work Breakdown Structure (WBS) for the project. - Establish and agree the level and frequency of reporting required by the project. - Establish and communicate cost and schedule baselines. - Review overall project status with the Project Control team and recommend corrective actions. - Ensure that all cost, planning and document control reports are prepared and issued in accordance with the Project Coordination Procedure. - Liaise with other Departments at all meetings relevant to project operations and ensure that the time and cost plans are updated to reflect latest information. - Preparation and review of construction programmes - Review, approve and integrate sub-contract programmes - Development and review of design programmes - Updating and review of programmes in accordance with Contract requirements

  • Assiraj Almunir
    • Tripoli, Libya
    • General Manager
      • Jun 2010 - Sep 2014

      General Manager: responsible for all the company’s projects with Tripoli municipality, street furnitures, playgrounds and street lighting General Manager: responsible for all the company’s projects with Tripoli municipality, street furnitures, playgrounds and street lighting

    • Planning Manager
      • Jan 2009 - Sep 2010

      Developed, updated & maintained contract & construction programs Critical path analysis Produced periodic progress reports Chaired overall project planning & progress meetings. Cost control (Cash flow & Earned Value analysis) Developed, updated & maintained contract & construction programs Critical path analysis Produced periodic progress reports Chaired overall project planning & progress meetings. Cost control (Cash flow & Earned Value analysis)

    • United Kingdom
    • Civil Engineering
    • 700 & Above Employee
    • Planning Engineer
      • Mar 2001 - Dec 2008

      Developed, updated & maintained contract & construction programs Established and maintained the overall project plans, processes and procedures. Produced periodic progress reports & schematic progress diagrams Created communication plan to team members and management Developed, updated & maintained Schematic Progress Diagrams Reviewed and reported on subcontractors’ programs Developed, updated & maintained contract & construction programs Established and maintained the overall project plans, processes and procedures. Produced periodic progress reports & schematic progress diagrams Created communication plan to team members and management Developed, updated & maintained Schematic Progress Diagrams Reviewed and reported on subcontractors’ programs

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Planning Engineer
      • Oct 1998 - Dec 2000

      Started as a site engineer for three months, then joined the project control team Became responsible for reviewing and accepting sub-contractors programs using Open Plan & Primavera P3 Produced the contract Monthly Progress Reports (using Excel) Held meetings with main project planners: Dung Ah Consortium and SIEMENS Started as a site engineer for three months, then joined the project control team Became responsible for reviewing and accepting sub-contractors programs using Open Plan & Primavera P3 Produced the contract Monthly Progress Reports (using Excel) Held meetings with main project planners: Dung Ah Consortium and SIEMENS

    • Project Development Coordinator
      • Jul 1996 - Jun 1998

      Residential, offices and hotels sound and vision project development coordinator Residential, offices and hotels sound and vision project development coordinator

  • E.M.T.E Systems Ltd
    • United Kingdom
    • Civil Engineer
      • Jan 1991 - Jun 1996

      Produced architectural & MEP Drawings (using CAD software) Produced schedules of all Engineering, procurement and construction activities Produced architectural & MEP Drawings (using CAD software) Produced schedules of all Engineering, procurement and construction activities

Education

  • Webster University
    MBA, Business Management
    1993 - 1994
  • United States International University-Europe
    BSc, Civil Engineering
    1986 - 1990
  • South London College
    A-Level, Maths, Physics, Computer Scince
    1985 - 1986
  • Ali Abdullah Wrieth Secondary School
    High School Certificate, General Studies
    1981 - 1984