Abdulrahman Rashed

Senior Project Engineer at ATS, Advanced Technical Services
  • Claim this Profile
Contact Information
Location
Abu Dhabi, Abu Dhabi Emirate, United Arab Emirates, AE
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Mohammed Al-Ali

It is my pleasure to recommend Abdulrahman Rashed , as electrical site engineer for SUEZ Enviroment , he was avaluable addition to team work and we was work together as apartner .

Yousef OMRAN

Abdulrahman is very intelligent, organized, and team worker who I never seen any engineer like him, also Abdulrahman is obstacles crushers and his way in problems solving is really amazing, actually I hope that I can meet him again in any work relationship in addition to our fAbdulrahman is very intelligent, organized, and team worker who I never seen any engineer like him, also Abdulrahman is obstacles crushers and his way in problems solving is really amazing, actually I hope that I can meet him again in any work relationship in addition to our permanent friendship.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Senior Project Engineer
      • Jul 2022 - Present
    • Business Consulting and Services
    • 100 - 200 Employee
    • Commissioning Engineer - Electrical
      • Jul 2018 - Present

      The project calls for construction of Midfield Terminal Building (MTB) of Abu Dhabi Airport. The 700,000 square meter terminal building is one of the strategic infrastructure projects to be undertaken in Abu Dhabi, and will initially handle 30 million passengers per year. The terminal will be the home of Etihad Airways. The JV of TAV Construction (TAV), Consolidated Contractors International Co. (CCC) and Arabtec Construction LLC is main contractor to Abu Dhabi Airports Company (ADAC)… Show more The project calls for construction of Midfield Terminal Building (MTB) of Abu Dhabi Airport. The 700,000 square meter terminal building is one of the strategic infrastructure projects to be undertaken in Abu Dhabi, and will initially handle 30 million passengers per year. The terminal will be the home of Etihad Airways. The JV of TAV Construction (TAV), Consolidated Contractors International Co. (CCC) and Arabtec Construction LLC is main contractor to Abu Dhabi Airports Company (ADAC) client. Job Title & Description 1. Pre -commissioning activities following up (Snagging , FDB verification , Cable Testing , Fire alarm loop test ) 2. Final distribution boards (FDB) and SMDBs verification and submission for form 4 approval . 3. Testing of fire alarm and integration with other systems (lighting control, public address …etc. ) 4. Preparing site observation report and provide to subcontractors 5. Supervisor of subcontractor activities and coordination with civil , QC and consultant . Show less The project calls for construction of Midfield Terminal Building (MTB) of Abu Dhabi Airport. The 700,000 square meter terminal building is one of the strategic infrastructure projects to be undertaken in Abu Dhabi, and will initially handle 30 million passengers per year. The terminal will be the home of Etihad Airways. The JV of TAV Construction (TAV), Consolidated Contractors International Co. (CCC) and Arabtec Construction LLC is main contractor to Abu Dhabi Airports Company (ADAC)… Show more The project calls for construction of Midfield Terminal Building (MTB) of Abu Dhabi Airport. The 700,000 square meter terminal building is one of the strategic infrastructure projects to be undertaken in Abu Dhabi, and will initially handle 30 million passengers per year. The terminal will be the home of Etihad Airways. The JV of TAV Construction (TAV), Consolidated Contractors International Co. (CCC) and Arabtec Construction LLC is main contractor to Abu Dhabi Airports Company (ADAC) client. Job Title & Description 1. Pre -commissioning activities following up (Snagging , FDB verification , Cable Testing , Fire alarm loop test ) 2. Final distribution boards (FDB) and SMDBs verification and submission for form 4 approval . 3. Testing of fire alarm and integration with other systems (lighting control, public address …etc. ) 4. Preparing site observation report and provide to subcontractors 5. Supervisor of subcontractor activities and coordination with civil , QC and consultant . Show less

    • Construction
    • 700 & Above Employee
    • QA/QC Engineer
      • Aug 2015 - Jul 2018

      The five star hotel and branded apartment, four towers each one with 17 floors and 79 apartments. The value of project is 200 million JOD. (Drake and scull engineering MEP contractor with ARABTECH construction) Job Title & Description QA/QC Engineer . • Coordinate the document controls of technical submittals, drawings, etc. with the project team and to ensure that the QA/QC validation has been done. • Coordinate all inspections; monitor the required tests and record… Show more The five star hotel and branded apartment, four towers each one with 17 floors and 79 apartments. The value of project is 200 million JOD. (Drake and scull engineering MEP contractor with ARABTECH construction) Job Title & Description QA/QC Engineer . • Coordinate the document controls of technical submittals, drawings, etc. with the project team and to ensure that the QA/QC validation has been done. • Coordinate all inspections; monitor the required tests and record inspections. • Follow up the closure of Non-conformance, NCR and Site Instruction, SI. • Assist QA/QC Manager in conducting internal quality audits. • Liaise with the Client's representatives for the conduct of day-to-day quality related project activities. • Cooperate with the project team by sharing the technical support and guidance to site staff in submission of materials for approval, request for inspection, shop drawings, As-built drawings • Preparing operation and maintenance manual, I achieved all O&M for electrical system. • Achieved the MCC testing and operation integrated with BMS system. Show less The five star hotel and branded apartment, four towers each one with 17 floors and 79 apartments. The value of project is 200 million JOD. (Drake and scull engineering MEP contractor with ARABTECH construction) Job Title & Description QA/QC Engineer . • Coordinate the document controls of technical submittals, drawings, etc. with the project team and to ensure that the QA/QC validation has been done. • Coordinate all inspections; monitor the required tests and record… Show more The five star hotel and branded apartment, four towers each one with 17 floors and 79 apartments. The value of project is 200 million JOD. (Drake and scull engineering MEP contractor with ARABTECH construction) Job Title & Description QA/QC Engineer . • Coordinate the document controls of technical submittals, drawings, etc. with the project team and to ensure that the QA/QC validation has been done. • Coordinate all inspections; monitor the required tests and record inspections. • Follow up the closure of Non-conformance, NCR and Site Instruction, SI. • Assist QA/QC Manager in conducting internal quality audits. • Liaise with the Client's representatives for the conduct of day-to-day quality related project activities. • Cooperate with the project team by sharing the technical support and guidance to site staff in submission of materials for approval, request for inspection, shop drawings, As-built drawings • Preparing operation and maintenance manual, I achieved all O&M for electrical system. • Achieved the MCC testing and operation integrated with BMS system. Show less

    • India
    • Machinery Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer
      • Nov 2013 - Aug 2015

      Degremont converted to SUES Group at march 2015 WASTE WATER TREATMENT PROJECT – PHASE 2 – JORDAN. Project Overview : the expansion project provides for an increase in treatment capacity from 267,000 to 365,000 cubic meters per day, and includes the refinancing of the project company’s existing borrowing. The expanded plant serve 3.5 million inhabitants of Greater Amman through to 2025, The project cost is $275 million.

    • Electrical Engineer
      • Nov 2013 - Mar 2015

      Electrical Engineer (Site & Commissioning). • I contributed to the operation of the expansion of As Samra by testing and commissioning of more than 10 panels of MCCs, 4 UPS panels, Capacitors banks and Medium Voltage panels. • I achieved the quantity Surveys for cable, trays & terminations material. • Design cable routing and installation supervision. • I was full organized by record and reporting all site activities and observation. • I corroborated with site team to complete… Show more Electrical Engineer (Site & Commissioning). • I contributed to the operation of the expansion of As Samra by testing and commissioning of more than 10 panels of MCCs, 4 UPS panels, Capacitors banks and Medium Voltage panels. • I achieved the quantity Surveys for cable, trays & terminations material. • Design cable routing and installation supervision. • I was full organized by record and reporting all site activities and observation. • I corroborated with site team to complete electrical erection in good way. • I finished the testing of more than 10000 meter low voltage cable and more than 1000 meter of MV cables high pot test • I was a part of team that completed the commissioning process by following up of motors, instruments and integration with PLC • I was one of the team that energized 12 MV panels by interlocking system, protection and testing. • I Cooperate with design tam to complete all as built drawing • Preparing method statement for electrical system.

    • QC Engineer
      • Mar 2013 - Sep 2013

      1. SEAWATER DESALINATION PLANT – KUWAIT. Project Overview : Seawater desalination plant at the Az Zour North complex in Kuwait for 320 million euros , With a daily capacity of 136,000 cubic meters of water. OTV & AGI Consortium. Company : ALGHANIM International for General Trading & Constructing Company – Kuwait (AGI ). Job Description : Q.C Electrical Engineer & Inspector ( 1-Mar-2014 to 1-Sep-2014 ). • Testing Engineer for Electrical Equipment ( Transformers, MV & LV… Show more 1. SEAWATER DESALINATION PLANT – KUWAIT. Project Overview : Seawater desalination plant at the Az Zour North complex in Kuwait for 320 million euros , With a daily capacity of 136,000 cubic meters of water. OTV & AGI Consortium. Company : ALGHANIM International for General Trading & Constructing Company – Kuwait (AGI ). Job Description : Q.C Electrical Engineer & Inspector ( 1-Mar-2014 to 1-Sep-2014 ). • Testing Engineer for Electrical Equipment ( Transformers, MV & LV Panels and Distribution Boards ) • Cables Test ( Meggering , Continuity and HV Tests ). • Filing and documentation for electrical files and Formal papers . Show less 1. SEAWATER DESALINATION PLANT – KUWAIT. Project Overview : Seawater desalination plant at the Az Zour North complex in Kuwait for 320 million euros , With a daily capacity of 136,000 cubic meters of water. OTV & AGI Consortium. Company : ALGHANIM International for General Trading & Constructing Company – Kuwait (AGI ). Job Description : Q.C Electrical Engineer & Inspector ( 1-Mar-2014 to 1-Sep-2014 ). • Testing Engineer for Electrical Equipment ( Transformers, MV & LV… Show more 1. SEAWATER DESALINATION PLANT – KUWAIT. Project Overview : Seawater desalination plant at the Az Zour North complex in Kuwait for 320 million euros , With a daily capacity of 136,000 cubic meters of water. OTV & AGI Consortium. Company : ALGHANIM International for General Trading & Constructing Company – Kuwait (AGI ). Job Description : Q.C Electrical Engineer & Inspector ( 1-Mar-2014 to 1-Sep-2014 ). • Testing Engineer for Electrical Equipment ( Transformers, MV & LV Panels and Distribution Boards ) • Cables Test ( Meggering , Continuity and HV Tests ). • Filing and documentation for electrical files and Formal papers . Show less

Education

  • The Hashemite University
    Bachelor's degree, Electrical Engineering
    2008 - 2013

Community

You need to have a working account to view this content. Click here to join now