Abdulrahman Al-Muhalbadi

Power Operations Shift Foreman at Rabigh Power Company | RPC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jeddah, Makkah, Saudi Arabia, SA
Languages
  • Arabic -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Basic Induction and Power Plant Fundamentals Course
    RAWEC - Rabigh Arabian Water & Electricity Company
  • English Language Course, Level 1,2,3 and 4
    Al Arz Int'l Institute. For English Language Education
  • High/Medium Voltage Substation Operation, Switching, Isolation & Restoration.
    APEX Dubai
  • MANAGING CHANGE AND ASSERTIVE COMMUNICATION SKILLS
    PROFESSIONALS for Human Resources Development
  • Occupational Safety and Health 30 Hours
    OSHAcademy Safety and Health Training
  • Power Plant On Job Training with System Descriptions of Power Plant
    RAWEC - Rabigh Arabian Water & Electricity Company
  • Work Ownership & Value Formation.
    PROFESSIONALS for Human Resources Development

Experience

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Power Operations Shift Foreman
      • Feb 2018 - Present

      1. Operation and handling of the facility during the shift and its interface with other parties.2. Manage and coordinate operations during normal and any abnormal operational situation.3. Plan, organize and control an adequate monitoring and operation of Power Plant with its subordinates.4. Operation, Switching, Isolation and Restoration Procedure of High Voltage and Medium Voltage Substation & Switchgear.5. Strictly apply PTW system LOTO making sure zero non-conformities

    • Power Plant Operator
      • Jun 2015 - Jan 2018

      1. Operation, Switching, Isolation and Restoration Procedure of High Voltage and Medium Voltage Substation & Switchgear.2. Start up and Shut down of Fuel Oil fired Boiler, Steam Turbine Generator and Balance of Plant from Local.3. Monitor and visually inspect Plant Equipment and Equipment indicators to detect.4. Operation of Electrostatic precipitator.5. Operation of Fuel desulphurization through lime stone and gypsum.6. Operation of Demineralization water plant.7. Operating problems and make adjustments or minor repairs as required.8. Certified and Authorize for the Isolation/De-Isolation of Equipment (LOTO).9. Logging of parameters of Turbine, Boiler and Plant Auxiliaries.10. Complete and Maintain Station records, Logs and Reports from field.

    • Saudi Arabia
    • Utilities
    • 1 - 100 Employee
    • Power Plant Operator
      • Jan 2015 - Jun 2015

      1. Start up and Shut down of Fuel Oil fired Boiler, Steam Turbine Generator and Balance of Plant from Local.2. Monitor and visually inspect Plant Equipment and Equipment indicators to detect.3. Operation of Electrostatic precipitator.4. Operation of Fuel desulphurization through lime stone and gypsum.5. Operation of Demineralization water plant.6. Operating problems and make adjustments or minor repairs as required.7. Certified and Authorize for the Isolation/De-Isolation of Equipment (LOTO).8. Logging of parameters of Turbine, Boiler and Plant Auxiliaries.9. Complete and Maintain Station records, Logs and Reports from field.

Education

  • Higher Institute for Water and Power Technologies
    Higher Diploma - GPA (3.14 of 4), Process Operations
    2013 - 2015

Community

You need to have a working account to view this content. Click here to join now