Experience

    • Oil and Gas
    • 1 - 100 Employee
    • civil engineer
      • Dec 2012 - Present

    • Civil Engineering
    • 100 - 200 Employee
    • Project Engineer
      • Feb 2010 - Nov 2012

      Responsibilities: Request for proposals (RFPs) and request for qualification (RFQ) preparation • Contract Administration with the sub-consultants • Supervised and coordinated engineering design projects • Report writing • Project management including scheduling • Compiled cost performance reports including S-curves • Validated invoices of sub-consultants for payment • Coordination between various Worley Parsons’s and Jeddah Municipality offices, sub-consultants and clients Show less

  • GHAZI AWAD Architects and Engineers-Abu Dhabi
    • Abu Dhabi, United Arab Emirates
    • Civil Engineer
      • Mar 2009 - Jan 2011

      Construction of Beach Tower (2x G+40), Abu Dhabi • Meet with client representatives, other professional with in the design team and contractor’s representatives during construction. • Experience of heavy casting of concrete, construction joints, table formwork etc. • Inspection of floating slab for mechanical floors as per approved drawing and the material used for that. • Experience of finishing work like aluminum cladding, corridor and lift lobby tiling work • Construction of lift core wall by slip form technique (Continuous Pouring) • Monitoring environmental protection measure and reporting any hazards/incident. • Give approval for concrete (any structural member), after reinforcement has checked. • Follow drawings, specification and B.O.Qs. • Implementation of quality control procedure. • Knowledge of local authorities’ design guide for residential and commercial estate. • Check technical submittal/method statement for review and approval • Study of value engineering and variation order. • Review monthly progress report/work done for payment to contractor. • Keeping record of work done as per time schedule. Show less

    • United Arab Emirates
    • Design Services
    • 1 - 100 Employee
    • Civil Engineer
      • Feb 2008 - Mar 2009

      Construction of Sannayeea Police Station(G+2), Al-Ain • Ensuring that all design work produced on project is of sufficient quality to avoid any error or rework. • Inspection of all finishing work (plastering, painting, false ceiling, tiling work, wet area waterproofing & cladding). • Inspection of Stone Cladding (by dry fix method) outside peripheral walls. • Attendance at client meeting. • Delivering project to the required quality, time line and budget. • Checking of detailed structure and architectural drawing and coordinating with MEP engineers/drawings. • Making of milestone as per work done & schedule. • Review and approval of technical submittal/method statement submitted by contractor. • Study of value engineering and variation order. • Review and approved monthly progress report/bill. • Keeping record of work done as per time schedule Show less

    • Project Engineer
      • Oct 2007 - Dec 2008

      NWFP Emergency Rehabilitation Project (NERP). (Oct, 2007 – Dec, 2008) Responsibilities: • Design review and Supervision of construction of Bridges, Culverts, retaining walls & roads in different districts of North-West Frontier Province. • Design review and supervision of buildings construction. • Supervision of design and construction of water supply systems in the Departments of Public Health and Irrigation schemes. • To undertake regular visits of the project activities and prepare field visit reports of the project areas, ensuring implementation of all engineering activities in the field areas of the programme. • To develop, implement and monitor coordination mechanism for project implementation. • Providing technical and analytical expertise on all matters pertaining to monitoring and evaluation activities. Show less

  • Bayindir Construction Company
    • NWFP Peshawar, Pakistan
    • Senior Site Engineer
      • Mar 2004 - Sep 2007

      Construction of Islamabad Peshawar Motorway (Mar, 2004 – Sep, 2007) Responsibilities: • Checking the Sub grade, Checking Bridge and road layouts, levels. • Execution of Deep/ Pile foundation. • Checking material quality and adopting different types of test and inspection of material (sieve analysis, cube test, bulking, silt content, slump. Physical test of aggregate, brick, and cement, steel bend & re-bend test. • Calibration/ inspection of laboratory equipment and preparation of method statement/ ITP for all construction activities and ensuring the required degree of quality control at site. • Preparing Method Statements for NDT test, Field Density Test, CBR test, Initial pile testing i.e. Vertical/ Lateral load. • Preparing the checklist of pile load test. • Earth Work activities, Pavement, Asphalt, Concrete, Interchanges. • Supervision of Construction of Box Culverts, Bridges, (Piling, Footing, Abutments, Piers, Transoms, Girders, Diaphragms, Deck Slabs, Safety, Barriers, Approach Slabs). • Bar banding schedule for Culverts and Bridges Show less

    • Pakistan
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Site Engineer
      • Jun 1999 - Feb 2004

      Construction of Primary Schools funded by KFW/World Bank (Jun, 1999 – Feb, 2004) Responsibilities: • Site survey, site measurement, project launch, site supervision, co-ordination of works and field manpower management. • Supervision of Construction of Primary schools and Project Management. . • Preparation of Project Documents including preparation of technical and monthly progress reports. • Assistance to senior engineers in Design and modifications. • Preparation of bill of quantities and estimated costs. Show less

    • Graduate Engineering Trainee
      • Mar 1998 - Jun 1999

      • Worked with Sub Divisional Officer on supervision of various Infrastructures Project in Peshawar and Farms to Markets Roads in Haripur Districts. • Worked with Sub Divisional Officer on supervision of various Infrastructures Project in Peshawar and Farms to Markets Roads in Haripur Districts.

Education

  • University of Engineering & Technology Peshawar
    Master of Science (MSc), Civil Engineering
    2008 - 2011
  • University of Engineering & Technology Peshawar
    Bachelor's Degree, Civil Engineering
    1993 - 1998
  • University Technology Malaysia (UTM)
    Doctor of Philosophy - PhD (In Progress), Civil Engineering

Community

You need to have a working account to view this content. Click here to join now