Abdul Wahab Khan

Assistant Manager Electrical at Young's (Private) Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Hakan UFAT

It is very easy to recommend such a talented, result oriented & hard working guy like Abdul Wahab. We worked together during U.G. Food Cake Factory project (including design, installation & commissioning of the factory) was successfully delivered with his technical support. It was easy to work together with a team player like him

Syed Hashim Raza

Abdul Wahab is honest,sincere, dedicated and responsible his pick up is very quick

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • HVAC
    -

Experience

    • Pakistan
    • Food and Beverage Services
    • 300 - 400 Employee
    • Assistant Manager Electrical
      • Feb 2017 - Present

    • Türkiye
    • Food and Beverage Manufacturing
    • 700 & Above Employee
    • Assistant Manager Engineering
      • Jan 2015 - Jun 2016

      - Provide Support in conducting line trials to ensure that Innovation Growth Pipeline is delivered as agreed with Marketing.- Ensure preventive and corrective maintenance of all machinery and equipment in Production and Utilities.- Coordinate with Stores / Purchase Department for procurement of new machinery, spare parts to ensure best price, quality and lead time. - Analyze Downtime for Utilities and Equipment. Ensure Root Cause Analysis is performed for Top 3 downtime during the month and CAPA are implemented. Follow-up with appropriate resources to systematically eliminate sources of downtime.- Prepare, Execute, Monitor and Control Engineering budget- Work with Plant team to minimize/eliminate any possible customer complaints and flawless execution of all product- related changes (NPD, trials, promotions etc)

    • Executive Engineer
      • Jan 2013 - Dec 2014

      I am presently associated as Executive Engineer with the Company, During Six years & 6 Month of my association with the Company, my job responsibilities so far has been the overall monitoring and supervision of Electrical, Electronic & partially Mechanical, Installation of Cake & Biscuit Lines, Generator, Complete HVAC system, Compressor & etc.

    • Officer Engineering
      • Apr 2008 - Dec 2012

      (a rapidly growing Company in an FMCG sector) is an affiliate of Ulker International ( a multinational manufacturing concern), major activity of the Company so far has been the production and sale of single layer cakes amongst other line of products.I am presently associated as Jr. Manager Engineering with the Company, During three and Half years of my association with the Company, my job responsibilities so far has been the overall monitoring and supervision of Electrical, Electronic & partially Mechanical Baking Plant :Line # 1 Layer Cake Plant (Packaging Machine (Cavanna) Working Machine (Gorreri), Oven (Lazer) form Italy,Line # 2 Cup & Pound Cake Plant (Packaging Machine, Injection Machine, Enrobor Machine, Cooling Tunnel, and Oven) form Turkey, same were installed and commissioned and operational training was obtained from Italian & Turkish Engineers,Generators “Gauscor SA”, Electrical Panels, Chiller (LS), AHU (Sasa) Cooling Towers, Circulating Pumps, Fire alarm system.Ball mill (Saboor Brothers) installation and commissioning together with electric panel designing and its installation Modification in Plant:Double color dough running in one extuder, a project completed with the guidance of the Factory Manager (from Turkey);Modification in PLC program according to requirement to increase plant efficiency. Designed, installed and intergrated pressure switches with PLC as a modification and improvement in line functionality. Making Electrical Drawing of different Tukish made Panels.

    • Pakistan
    • Textile Manufacturing
    • 700 & Above Employee
    • Engineer
      • Aug 2006 - Mar 2008

      Work as Electronic Engineering with the Company, During One and Half years of my association with the Company, my job responsibilities so far has been the overall monitoring and supervision of Electrical and Electronic. Machine Installation: Automatic Stitching Plant : Plow Cease Machine from Germany Flat Machine from Germany same were installed and commissioned and operational training was obtained from German Engineers, Also LT Panels, Fire alarm system Key responsibilities include: Preparation of weekly departmental brake down report that facilitates top management in taking short / long term decisions; Maintaining the Preventive maintenance record Electronic and Electrical Troubleshooting of all Plant Electrical & Electronic Supervision of Electrical Installation ( LT panel, Takeoff Panel, P.D.B , L.D.B panel ) Software installing of Touch Panel (Elo), CAN bus software Work on different PLC (Khukhe, Fatek) Work on different type of Inverters (Lenze, Puma) Programming of Inverter and Servo Drive (Lanze)

  • S.G Lyne (Pvt)Ltd
    • Site karachi
    • Assistant Supervisor
      • Jun 2004 - Jul 2006

      Work as Asstant Supervisor with the Company, During One and Half years of my association with the Company, my job responsibilities so far has been the overall monitoring and supervision of Electrical and Electronic. Repairing & programming of inverters(Dienes, Barmag, Puma, Fuji) Repairing & Programming of P.I.D controllers (Eurotherm, DGP) Repairing different type of temperature controlling power cards. (Thyrotakt, Eurotherm, Denies and Barmag) Work on instrumentation recorders(YOKOGAWA & CHESSEL) Work on Pressure transmitters & switches, Temperature sensors Level detector, Air & Liquid flow meter and transmitter, Speed sensors, capacitive sensors & vibrating instrument. Trouble shooting of PLC related problems such as (SIMATIC S5, SIMATIC S7, BARMAG, OMRON) Work on H.S.P (High speed production) DCS control Work on D-TEX, DTW, Cope winder & Ratti machines. Repairing Of Microcontroller Based Board Work on Statimat,Warp Reel, Ultra Sonic Generator

    • Lab Technician
      • May 2002 - May 2004

      Work as Lab Technician with the Company, During Two years of my association with the Company, Repairing & programming of inverters.(Dienes, Barmag) Electronic Card repairing of Dc drive, Inverter, Heating controlling card. Trouble shooting of Zinser machine Arrange the Equipment for Electronic card analysis Work as Lab Technician with the Company, During Two years of my association with the Company, Repairing & programming of inverters.(Dienes, Barmag) Electronic Card repairing of Dc drive, Inverter, Heating controlling card. Trouble shooting of Zinser machine Arrange the Equipment for Electronic card analysis

Education

  • Dada Bhoy
    B-Tech (Hounor), Electronic
    2007 - 2008
  • Ibrahim Ali Bhoy
    Matric, Science
    1990 - 1996

Community

You need to have a working account to view this content. Click here to join now