Abdellah Haddouche
site manager pipeline at MANCHE-CTCO Contracting- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
MANCHE-CTCO Contracting
-
Algeria
-
Oil and Gas
-
1 - 100 Employee
-
site manager pipeline
-
Aug 2020 - Present
-
-
-
JGC Algeria
-
Algeria
-
Oil and Gas
-
300 - 400 Employee
-
TESTPACKE COORDINATOR
-
Nov 2019 - Present
TESTPACKE COORDINATOR JGC : PROJECT: HMD UP SIDE HASSI MOUASSOUD 16-SEPTEMBRE - / ALGIER / - PETROWORKS-CPECC-SONTRACH LINE CHECK closed the punch list for item (QC/ING) Review Test pack Check Sheets for completeness TESTPACKE Review Test pack Check Sheets for completeness. Verification NDT reports (VT-PT-MT-PMI-HT-RT) Pressure Testing performed as required and completed. Verification of the Equipment’s hydro test (pump of filling pump of prevue; pressure recorder; temperature recorder pressure gage). -verify the certificate of instrument and of Equipment’s hydro test (certificates of conformity of calibration). -hydrostatic program for preparation -verify the boucle in site and installed the group of work -Hydrostatic Preparation (blowing, flushing, increases the pressure; Restatement PROJECT: HMD UP SIDE HASSI MOUASSOUD 16-SEPTEMBRE –17-03-2020 - / JGC / -SONTRACH Show less
-
-
-
China Petroleum Engineering & Construction Corporation (CPECC)
-
Oil and Gas
-
700 & Above Employee
-
PRPJECT MANAGER IN SITE OF CLEANING CHEMICAL
-
Jan 2019 - Present
o Commissioning Department /SUBCONTRACTER PETROZORKS HSE is the first thing. Attend CPECC meetings for project progress. Controls and ensures the quality of CLEANINC CHEMICAL. Completed the anomalies to the project and find the solutions with CPECC Estimate supplies at the store. Follow and program the groups before the cleaning phase verify test pack , marked up P&ID and ISO with the site "cleaning chemical" Verify the battery limit of test-pack as per the scope of chemical Attend the inspection of the chemical cleaning with the client CPECC and SONATRACH Show less
-
-
-
Tecnicas Reunidas
-
Spain
-
Engineering Services
-
700 & Above Employee
-
Piping supervisor / NDT level II-tespack-
-
Dec 2017 - Present
PREPARATION ENGINEERING TEST PACKE verify test pack, marked up P&ID and ISO with weld map “Hydro-test-Pneumatic Test-Test Test-Service" Verify the dispatching PID for hydro test (different: class , pressure ,fluid ,material , other seconder ..) Verify the pressure test and pressure design and temperature as-per line list engineering. WALK DOWN Verify the line as-per isometric or as-per as-built verify of alignment for all line Verify the material of line (check the valves. .supports welded .fitting .instrument….) Establish list of reserves , category A/B/C DOCUMENT REVIEW Qc piping , Fit-up ,welding ,NDE Review Test pack Check Sheets for completeness. Verification and follow-up all QC document for welding. Verify all NDT/ PWHT clearance and coverage as per piping class. Verify the Isometric control sheet to be verified and reviewed by all parties prior to release for testing. - Verify the NDT percentage (PT-MT-PMI-HT-RT.PWHT) as-per WPS. -Verification NDT reports (VT-PT-MT-PMI-HT-RT-PWHT-FT) as per isometric and data base - Preparation the NDT summary and verify (line, fluid, number joints, diameter, schedule, heat number, WPS, number reports, NDT %). QA/QC HYDROSTATIC Pressure Testing performed as required and completed. Check & review preparation of Test-Pack. Verify documents of test pack Verify limit of test Verification of material removed (valves automatic, check valve, instrument, strainer…) Verify provisions for venting/drain Piping pre-cleaning before testing.(Air blowing) Verify the pressure gauges, pressure and temperature chart recorders & testing manifolds hydro testing (calibration certificate) Post-test line cleaning activities and verify drying & draining of piping system Verification of Flange bolts Tightening / Torqueing / Tensioning. Hydro test witness with client o PROJECT: CPF OUED ZINE- DECEMBER2017 - UNTIL TO DATE / ADRAR / - TECNICAS RENIDASS -GTG- Show less
-
-
-
LEAD/petrofac/GRN
-
Algérie/adrar-REGAN-
-
QA/QC mechanical Engineer +NDT level II -service testpacke-
-
Nov 2016 - Nov 2017
Mechanical Piping Engineer –(QA/QC) PREPARATION ENGINEERING TEST PACKE verify test pack , marked up P&ID and ISO with weld map "Hydro-test-Pneumatic Test-Test Test-Service" Verify the battery limit of test-pack verify Piping Material class Verify the pressure test and pressure design and temperature as-per line list engineering. COORDINATOR TESTPACK DOCUMENT REVIEW Visual inspection of welding members and structure as per code requirement Inspection of joint fit-up ,diameter , schedule ,root gap , internal misalignment, rotation Preparation of daily report every day. Review Test pack Check Sheets for completeness. Verify all NDT/ PWHT clearance and coverage as per piping class. Verify the Isometric control sheet to be verified and reviewed by all parties prior to release for testing. Verify the NDT percentage (PT-MT-PMI-HT-RT.PWHT) as-per WPS. Verification NDT reports (VT-PT-MT-PMI-HT-RT-PWHT-FT) as per isometric and data base Preparation the NDT summary and verify (line, fluid, number joints, diameter, schedule, heat number, WPS, number reports, NDT %). PROJECT: CPF REGGANE / ADRAR / - Petrofac -GRN- o LEAD COMPANY -contracting and trading Ltd-November2016 - November 2017-Petrofac Show less
-
-
-
ENGCB/TRC-SONATRACH
-
Algeria area/pipeline illizi
-
Senior Mechanical Engineer / Interim Project Manager
-
Sep 2014 - 2016
Technical Department : GCB / DTC (DIRECTION DES TRAVEAUX CANALISATION) Mechanical Engineer-Piping N2 / Pipeline: • Preparation of pipeline projects (Illizi -Djanet 10 ") / (Tidikelt -Tamanrasset 16"): • Quality control plant / PCQ, procedure management project / PMP. • Estimate the materials for the test. • Preparation of technical sheets of all instruments and Project equipment • Planning of both projects. Pipeline projects (Illizi -Djanet 10 ") -231k m Project responsibility • Mechanical engineer in the technical service of the project. • Principal Mechanical Engineer N3- responsible Quality - • Technical Service responsible • Acting Project Manager. HSE is the first thing. Attend SONATRACH meetings for project progress. Controls and ensures the quality of welding. Completed the anomalies to the project and find the solutions with sonatrach -Estimate supplies at the store. Follow up and program the groups following the project phase. Update project work plan for progress. Monitoring the progress of work. Follow up and check the logistic equipment according to the reports of chief material (diesel refill part maintenance...)- Follow up and install the program of camp GCB/DTC (DIRECTION DES TRAVEAUX CANALISATION) FILLIEL SONATRACH-2013-2016-SONATRACH- TRC- Show less
-
-
-
SOSCITE LEAD
-
Algeria area-hassi masouaad
-
PIPING ENGINEERING
-
Apr 2010 - Aug 2013
PREPARATION ENGINEERING TEST PACKE verify test pack ,marked up P&ID and ISO with weld map "Hydro-test-Pneumatic Test-Test Test-Service" Verify the battery limit of test pack verify Piping Material class Verify the pressure test and pressure design and temperature as-per line liste engineering. o Responsible Construction – Mechanical Completion Hydraulic bolt tightening torque. Close the items of Equipment-punch list- Close the items of piping-punch list- Insulation (cold lime insulation, personal protection, paint) -Commissioning ( general verification of sub-systeme and systeme) o COMPANY LEAD-contracting and trading-Nevombre 2010 Ltd - août 2013-Saipem o PROJECT LPG-LDHP(Liquefied petroleum gas )_ Hassi Messaoud-Saipem *Mechanical Engineer commissioning -verify the lines by system and sub-system - verify Alignment flanges. -Follow the punch-list- item B- -Mechanical Completion - Mechanical preparation before starting (general check of piping and Equipment, Instruments). -operation leak test of verified the torque of bult o PROJECT UTBS (Unity of treatment of oil) Hassi Messaoud-Saipem-o COMPANY: LEAD-contracting and trading Ltd., November 2009 - April 2010 Show less
-
-
-
EURL TGCTP/trc sonatrach
-
Algeria area/
-
Hydrotest Supervisor
-
Nov 2008 - Oct 2009
*Engineer hydrostatic - Verification of the Equipment’s hydro test (pump of filling pump of prevue; pressure recorder; temperature recorder pressure gage). -verify the certificate of instrument and of Equipment’s hydro test (certificates of conformity of calibration). -hydrostatic program for preparation -verify the boucle in site and installed the group of work -Hydrostatic Preparation (blowing, flushing, increases the pressure; Restatement...) -Follow the above-hydrostatic testing with the client-Sonelgaz -preparation daily report every day. o PROJECT POWER PLANT LARBAA BLIDA-Ansaldo-o COMPANY TGCTP-Excavation Engineering and Construction petroleum -April 2009 - October2009 *Hydrostatic testing engineer (pipeline) - Preparation of the Equipment hydro test (certificates of conformity Equipment and Instruments). - Hydrostatic pipeline (blowing, calibration, filling and increases the pressure, drying) - Follow the above-hydrostatic testing with the client-Sonatrach- and ARH o PROJECT MEDGAS II-CANAGAZ-o COMPANY TGCTP-Excavation Engineering and Petroleum-November 2008 work to marc2009 Show less
-
-
-
ABC ain tellout
-
Algérie
-
Mechanical engineer
-
2007 - Oct 2008
engineer of the Town Hall –APC- Ain Tellout Septombre2007-October2008 engineer of the Town Hall –APC- Ain Tellout Septombre2007-October2008
-
-