      • Oct 2015 - Present

      Shift charge Engineer at RPC which produce and supply utilities to the Rabigh Refining and Petrochemical Company (Petro Rabigh). o Manage and coordinate operations during normal and any abnormal operational situation. o Responsible for communication with all parties involved with the export of water, steam, and power. o Participate in issuing procedures systems. o Strictly apply PTW system making sure zero non-conformities. o Participate in issuing punch list items. Shift charge Engineer at RPC which produce and supply utilities to the Rabigh Refining and Petrochemical Company (Petro Rabigh). o Manage and coordinate operations during normal and any abnormal operational situation. o Responsible for communication with all parties involved with the export of water, steam, and power. o Participate in issuing procedures systems. o Strictly apply PTW system making sure zero non-conformities. o Participate in issuing punch list items.

    • Egypt
    • Construction
    • 700 & Above Employee
    • Mechanical Commissioning and Operation Engineer
      • May 2015 - Sep 2015

      o Balance of plant BOP Commissioning. o GT on base Commissioning o Balance of plant BOP Commissioning. o GT on base Commissioning

    • Egypt
    • Oil and Gas
    • 500 - 600 Employee
    • Commissioning &Shift charge operation engineer
      • Mar 2013 - Apr 2015

      Power Generation Engineering and Services Company (PGESCO) | El Ain El Sokhna Supercritical Thermal Power plant Units 1&2-2x650 MW Gas/Oil fired units.; Coordinate and supervise all operation activities between all contractors. Participate in issuing procedures systems first start up and first operation. Perform work permits and equipment lock out tag out. Train owner operators for the prober equipment operation. Participate in issuing punish list items. Making daily technical reports about the unit activities. Show less

  • Abu Qir Thermal Power plant (2x650 MW).
    • Abu Qir Thermal Power plant
    • Mechanical commissioning and operation engineer for BOP
      • Mar 2012 - Mar 2013

      Commissioning for BOP equipments (CW, BFWP, CP…..) Make motor solo test, air blowing, flashing and chemical cleaning for different systems Commissioning for BOP equipments (CW, BFWP, CP…..) Make motor solo test, air blowing, flashing and chemical cleaning for different systems

    • United States
    • Biotechnology Research
    • 700 & Above Employee
    • Electrical commissioning Engineer
      • Jan 2011 - Mar 2012

      Electrical commissioning of low voltage panels Good dealing with control panels and its wiring Electrical commissioning of motors, valves, diesel generator, and instruments. Electrical commissioning of low voltage panels Good dealing with control panels and its wiring Electrical commissioning of motors, valves, diesel generator, and instruments.

    • Telecommunications
    • 400 - 500 Employee
      • Jan 2010 - Jan 2011

      Upper Egypt Thermal power plant | Assuit (2*312 MW).; AchievementsMaintenance of transformers, motors, valves, control panels.Testing 400 V & 6.3 KV circuit breakers.

      • Jun 2006 - Jan 2010

      Start-up and shut-down procedures for thermal power plant 2*312 MW (Cold, Warm, and Hot Start Up and normal or emergency shut-down).Turbine & auxiliaries operation (Toshiba & Ansaldo). And reporting the equipment condition during normal operation. Boiler & auxiliaries operation (Mitsubishi & Ansaldo) and reporting the equipment condition during normal operation. Good working knowledge of firefighting system.Making connection and disconnection for 220 KV, 6.3 KV, and 400 V.