Abdallah Maamoun

project engineer at SBG
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA
Languages
  • Arabic Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Hussein Fouda

Abdallah is a professional project engineer with very good communication skills.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • IT Services and IT Consulting
    • 700 & Above Employee
    • project engineer
      • Nov 2012 - Present

      (Third Saudi Expansion of Holly Haram Mecca, Security Buildings Plot 1)Owner: Ministry of Finance.Consultant: dar al-handasah (shair and partners). Project Description: 3 Towers for Holy Haram Security Forces ,Total Area of Project 54,120 m² ,Total Height for the 3 Towers: 140 m , Podium Height &Area: 34m & 17620 m² ; 2 Tunnels Through Project at Ground Floor Level Directly to Holy Haram ; HeliPad 42m diameter; 450m Massive & fence Wall Around Back Side for The Project ; 17 Tower crane .Job Description:• In charge of execute rock bolts, reinforced concrete works for Massive & fence Wall, rock anchors, wire mesh, shotcrete and head cages.• In charge of execute reinforced concrete works for zone 2.• Supervise site works.• Handle construction activities. • Coordinate with all the subcontractors. • Liaising with any consultants, subcontractors, supervisors, surveyors, planners, quantity surveyors and the general workforce involved in the project.• Recording of daily activities and resources. • Coordination of Structural Drawings with Architectural Drawings.• Checking plans, drawings and quantities for accuracy of calculations.• Ensuring that all materials used and work performed are as per specifications.• Planning the work and efficiently organising site facilities in order to meet agreed deadlines.• Overseeing quality control and health and safety matters on site.• Preparing reports as required.• Resolving any unexpected technical difficulties and other problems that may arise.

    • site engineer
      • Mar 2009 - Nov 2012

      (Saud Bin Abdul-Aziz University for Health Sciences - Alhassa)Owner: National Guard – Health AffairsConsultant: dar al-handasah (shair and partners) Project value: 2.5 Billion SRProject Description: (Academic Building ; 2 Housing Studios ; 4 Apartments; 28 Villas ; Main Worship ; Housing Worship ; Utilities Buildings ; Sport & Recreation Building ; Service Building ; Parking Areas ; Sewage Treatment Plant ; External Works.)Job Description:• In charge of execute reinforced concrete works for 5 villas, housing worship, cooling tower and transformer room.• In charge of execute reinforced concrete works, steel structure works and finishing works for sport & recreation building 8600 m² area, where my work was in:- All structural works (Footings, flat slabs, Composite slabs, v column, stadium, walkway, swimming pool, retaining walls)- All steel structure works (jogging track, steel canopy 3000 m², jack truss, structural truss system, metal roof 3600 m²)- finishing works ( Block works, Cement and Gypsum board partitions, Glass wall partitions, precast cladding, Aluminum cladding, Glazed curtain wall, stone cladding, GRC cladding, wooden sports flooring, rubber athletic flooring, rubber sheet flooring, marble flooring, Vinyl tiles, fall Ceiling systems)• Supervise site works.• Handle construction and finishing activities.• Coordinate with all the subcontractors. • Recording of daily activities and resources. • Coordination of Structural Drawings with Architectural Drawings.• Checking plans, drawings and quantities for accuracy of calculations.• Ensuring that all materials used and work performed are as per specifications.• Planning the work and efficiently organising site facilities in order to meet agreed deadlines.• Overseeing quality control and health and safety matters on site.• Preparing reports as required.• Resolving any unexpected technical difficulties and other problems that may arise.

    • Site Engineer
      • Jun 2007 - Nov 2008

      June 2007 till October 2007 (Two private Trade fairs in Industrial Abu ftera)Consultant: Quality Construction ManagementProject value: 380 Thousand US DollarsScope of work: Execute Reinforced Concrete Works for Two Trade fairs (1000 m²) area, included semi raft,(Basement, Ground, First and Roof slab) slab-beam system, Execute Builder works and finishing works.October 2007 till March 2008 (Aromatics Complex Project in Shuiba refinery)Work as a Sub Contractor from Kharafi GroupOwner: KPPC & PICConsultant: BechtelMain contractor: Tecnimont & (SK Engineering & Construction)Project value: 210 million US DollarsScope of work: Execute Plastering Works, Painting (internal & external) Works &Roof Water Proofing and Thermal Insulation Works for (Main Control Room & Substations 2 & 3) with 4300 m² areaMarch 2008 till November 2008 (Private Villa in Bayan)Consultant: Al-Bannai Consulting Eng. Center.Project value: 420 Thousand US DollarsScope of work: Execute Reinforced Concrete Works for Villa (750 m²) area, included semi raft, lift, swimming pool, (Basement, Ground, First, Second and Roof slab) (solid slab) slab-beam system & hollow block system, Execute Builder works.Project Contained Shoring & Dewatering Works.Job Description:• Supervise site works.• Follow municipality and authorities approvals.• Handle construction and finishing activities.• Coordinate with all the subcontractors.• Recording of daily activities and resources.• Prepare monthly payments, subcontractors payments, and variations.• Planning of project activities.• Prepare reports as required.• Checking plans, drawings and quantities for accuracy of calculations.• Resolving any unexpected technical difficulties and other problems that may arise.

    • Technical Office Engineer
      • Aug 2005 - May 2007

      (National Museum of Egyptian Civilization N.M.E.C - Egypt) International project with UNESCOOwner: Ministry of Culture.Consultant: Dr .El Ghazali M. Kesseiba.Project value: 320 million EGP.Project Description: Museum building (52,000 m²) area, 5 storey (35.0m height) included 4 intermediate cores (24.5m) clear height and connected with Reception building by concrete bridge (23.5m) length; Reception building (13,000 m²) area, 3 storey panelled beam system, including shopping area, meeting room, Restaurants, main cinema (750 m²), buses parking (5,000 m²), public parking (15,000 m²); mummies area can be seen from glass partition; Auditorium; Workshops; Labs; Repairing School; Electrical and Mechanical Service Buildings. Cut volume (200,000 m³), Raft foundation volume (20,000 m³) rested on (3,500 piles), Reinforced concrete volume (850,000 m³).Job Description:• Prepare shop drawings.• Prepare quantity surveying for all activities.• Prepare and revision quantity surveying for tender drawings in order to make variation orders.

Education

  • Assiut University
    Bachelor's Degree, Civil Engineering Department
    2000 - 2005