Abbas Niknam

Senior Petroleum Production Engineer/Researcher at National Iranian South Oil Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Iran, IR
Languages
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Fekete
    -
  • Kappa
    -
  • MATLAB
    -

Experience

    • Senior Petroleum Production Engineer/Researcher
      • Aug 2013 - Present

      • Production Forecasting – Reservoir Study• Analyzing Production Logs Results and Temperature-Pressure-Density Surveys in Oil and Gas Production or Injection Wells using Kappa or with my own Program• Analyzing Well Test Results (Build Up, Draw Down, Flowing and Static) using Fekete, Pansys and Well Test 200 • Designing Well Completion for High Pressure Oil and Gas Production Wells, Injection Gas Wells, Low Pressure Wells• Designing Gas Lift String Completion• Designing Route Pipe Line using Pipesim and Hysys for Oil and Gas Flow from Well to Well Head Separator and finally to Production Unit • Supervisor of different Wire Line or Slick Line Truck jobs like Production Logging (also with Coiled Tubing), Well Testing, Fishing, Installing and changing inside chokes, 3SV, Dummy, Plug, Prank, SSD• Supervisor of different Well Head Operations Like Changing Well Head Valves, 2SV,and Repairing them• Supervisor of High Volume Acidizing• Supervisor of Perforation Operations using Slick Trucks or Coiled Tubing• Designing a Proper Work Over Program for Oil and Gas Wells• Analyzing and find solution for Well Problems• Experience of Operational Working in conditions with high Pressure up to 8000 psi and H2S up to 150000 ppm

    • Petroleum Production Engineer
      • Jul 2007 - Aug 2013

      • Analyzing Production Logs Results and Temperature-Pressure-Density Surveys in Oil and Gas Production or Injection Wells using Kappa or with my own Program• Analyzing Well Test Results (Build Up, Draw Down, Flowing and Static) using Fekete, Pansys and Well Test 200 • Designing Well Completion for High Pressure Oil and Gas Production Wells, Injection Gas Wells, Low Pressure Wells• Designing Gas Lift String Completion• Designing Route Pipe Line using Pipesim and Hysys for Oil and Gas Flow from Well to Well Head Separator and finally to Production Unit • Supervisor of different Wire Line or Slick Line Truck jobs like Production Logging (also with Coiled Tubing), Well Testing, Fishing, Installing and changing inside chokes, 3SV, Dummy, Plug, Prank, SSD• Supervisor of different Well Head Operations Like Changing Well Head Valves, 2SV,and Repairing them• Supervisor of High Volume Acidizing• Supervisor of Perforation Operations using Slick Trucks or Coiled Tubing• Designing a Proper Work Over Program for Oil and Gas Wells• Analyzing and find solution for Well Problems• Experience of Operational Working in conditions with high Pressure up to 8000 psi and H2S up to 150000 ppm• Production Forecasting – Reservoir Study

Education

  • Petroleum University of Technology
    BSc, Petroleum Engineering
    2002 - 2006
  • Omidyeh Azad University
    Master's Degree, Petroleum Engineering
    2012 - 2014

Community

You need to have a working account to view this content. Click here to join now