Abalaji Viswanathasai
Senior Lead Engineer at M/S SIMHAPURI ENERGY PVT LIMITED- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
Hindi -
-
Telugu -
Topline Score
Bio
Credentials
-
higher nation technician grade
ati/epiOct, 1995- Nov, 2024
Experience
-
M/S SIMHAPURI ENERGY PVT LIMITED
-
Oil and Gas
-
1 - 100 Employee
-
Senior Lead Engineer
-
Dec 2011 - Present
Hands on experience SAP MM Preventive maintenance documentation implementation in SAP. Preparation and analysis of trip reports and take corrective actions. Attending online and breakdown maintenance jobs, planning & execution of shutdown jobs. Execution of predictive & preventive maintenance jobs of 600MW Power plant. Developing Standard Operation procedure for all the instruments. Preparation of spares listing and Raising Purchase requisitions and looking after spares procurement for over all plant. Reviewing received quotations and giving technical clearance for the same. Hands on experience of maintenance and trouble shooting of Digital Electro Hydraulic (DEH) System for turbine controlling system Calibration, Installation, commissioning and maintenance of smart transmitter’s pressure, level and flow transmitter &smart Positioners etc. Calibration, commissioning and maintenance of MOV (Auma, Rotork) Control Valves, Pneumatic Actuators & Dampers. Hands on experience of Testing, maintenance and trouble shooting of Emergency Trip System (ETS) and Turbine Supervisory Instrumentation (TSI) for turbine. Show less
-
-
-
Rain Carbon Inc
-
United States
-
Chemical Manufacturing
-
300 - 400 Employee
-
Shift Engineer (C&I).
-
Jun 2001 - Nov 2011
Maintenance of 53.5 MW Co-generation plant, Calibration and troubleshooting of Transmitters, I/P Converters, Control valves, Analyzers, Weigh Feeders & other field Equipments. PLC ladder logic Editing, DCS Point Building, Logic Modifications, Taking of Backup's, Carryout modification jobs, Troubleshooting of various equipment's, Preparation & maintenance of ISO 9001-2000 documents, planning and implementation of jobs as per the preventive maintenance schedules Maintenance of 53.5 MW Co-generation plant, Calibration and troubleshooting of Transmitters, I/P Converters, Control valves, Analyzers, Weigh Feeders & other field Equipments. PLC ladder logic Editing, DCS Point Building, Logic Modifications, Taking of Backup's, Carryout modification jobs, Troubleshooting of various equipment's, Preparation & maintenance of ISO 9001-2000 documents, planning and implementation of jobs as per the preventive maintenance schedules
-
-
-
Lanco Industries Limited
-
Srikalahasti
-
Senior Technician (C&I).
-
Jan 1999 - Jun 2001
Calibration of Pressure, Flow, Level, Temperature Transmitters, Troubleshooting & maintenance of various equipments Calibration of Pressure, Flow, Level, Temperature Transmitters, Troubleshooting & maintenance of various equipments
-
-
-
Tech-Masters
-
Secunderabad
-
Senior Technician (C&I).
-
Dec 1995 - Dec 1998
Calibration and erection of Transmitters, Preparation of cable schedules and loop checking Calibration and erection of Transmitters, Preparation of cable schedules and loop checking
-
-
Education
-
Jawaharlal Nehru Technological University
B. Tech, Electronics and Communication engineering