Aaron Jara
Project Engineer at PACCAR Engine Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Spanish Native or bilingual proficiency
-
English Native or bilingual proficiency
-
Portuguese Limited working proficiency
Topline Score
Bio
Experience
-
PACCAR Engine Company
-
United States
-
Motor Vehicle Manufacturing
-
100 - 200 Employee
-
Project Engineer
-
Jul 2023 - Present
-
-
-
Safran
-
France
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Project Engineer
-
Nov 2015 - Jun 2023
• Management of human resources to accommodate tasks according design, flammability, tooling, electrical and stress workload located on different sister facilities.• Management of schedule for different project requests from customers.• Presentation of hours budget according schedule to top management.• Creation of Configuration Management Report, which records Part Numbers, First Article Inspections (FAI), Work Orders and Non Conformities (NCR) associated with customer requests.• Constant communication with facilities on USA, Mexico, Brazil and Europe• Approval of team design according customer requirements.• Approval of prototype creation and test for new products.• Creation of Drawing Matrices, which records Part Number of assemblies for manufacturing on floor shop.• Creation of Change Request according customer specifications for modification of already delivered product, which compiles quotation from Design, Flammability, Stress, Certification, Tooling and Planing departments. Show less
-
-
Lead Design Engineer
-
Dec 2013 - Nov 2015
• Management of human resources to accommodate tasks according design workload.• Management of schedule for different requests from customers.• Presentation of Key Performance Indicator (KPI’s) to top management.• Constant communication with facilities on USA and Brazil.• Supervise team design according customer requirements.• Supervise prototype creation and test for new products.
-
-
Design Engineer
-
Dec 2012 - Nov 2013
• Constant communication with floor shop to ensure drawing interpretation• Comunication with different divisions in order to ensure aircraft design• No Conformity Report response for part disposition (Scrap, Rework, Return to Vendor, Repair)• Design for new aircraft main cabin and ceilings configuration in 3D CAD systems• Creation of Rework Instructions for interior modifications on aircraft assembly phase• Reconfiguration of existing aircrafts per client request
-
-
-
RSI Home Products
-
Tijuana Area, Mexico
-
Processes Engineer
-
Jun 2012 - Dec 2012
Manager Assistant •Fixture gold sample drawing, validation and creation •Validate physical components and finished product to go according mechanical design (First Article) •Understanding of critical measures (tolerance compliance) in design and prototypes creation •Scrap control. Develop a scrap monitoring process to ensure defect of components and determine root cause of defect. Ensure quality control training of manufacturing personnel to identify such defects •Develop a monitoring process for Work Orders to control manufacturing process as well to know the quantity of material in the different processes •Developed monitoring process for abbrassives budget, implementing system to calculate use per day per machine, in order to reduce consume and optimize abbrassives Show less
-
-
-
Medtronic
-
United States
-
Medical Equipment Manufacturing
-
700 & Above Employee
-
Engineering Assistant
-
Sep 2011 - Feb 2012
Assistant Quality and Manufacturing Engineering • Transfer product support • Visual aids improvements for manufacturing process • Document translation • Process Monitoring • CAPA project participation • Creation of Device History Record for new product • Migration of Manufacturing Documents and raw material specifications • Fixture drawing, validation as well as create a calibration protocol • Item Master creation for new materials • Preparation and implementation of Change Orders Show less
-
-
-
Plantronics
-
United States
-
Telecommunications
-
500 - 600 Employee
-
Internship
-
Sep 2009 - Jun 2011
NPD Test Engineering 11/2010 – 05/2011 • Mechanical design and documentation of test equipment • Modification of test equipment, Bluetooth test to DECT test • End of life/obsolete equipment disposition including inventory, where used, unit cost, etc. New Product Development 05/2010 – 11/2010 • Preparation and implementation of Engineering Change Orders; Marketing Opportunity Development processes • Mechanical design and documentation support • BOM and drawings documentation for new spare products • Material order from internal wharehouse for pilot runs and evaluations • Product packaging instructions documentation Tool prototype Lab and Mechanical Design 09/2009 –07/2011 • Working as technician in charge of the prototype lab operation • New parts prototype fabrication to support design validation using CNC and Stereo Lithography equipment • Design, fabrication and documentation of fixtures for manufacturing and product testing • Mechanical design of mechanical parts for new products Show less
-
-
Education
-
CETYS Universidad
Diploma, Project Management -
CETYS Universidad
BS, Mechatronic Engineering