Aaron Burnett
Operations Manager at Flow Dynamics and Automation- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Microsoft Project 2016 Essential Training
LinkedInFeb, 2021- Nov, 2024 -
Oracle Database 12c: SQL Fundamentals
Emerson Automation SolutionsJun, 2018- Nov, 2024 -
Lean 5S
Emerson Automation SolutionsJan, 2018- Nov, 2024 -
Certified Professional AutoCAD 2013
AlacadApr, 2012- Nov, 2024 -
Lean Six Sigma Green Belt (ICGB)
Pentair Valves & ControlApr, 2010- Nov, 2024 -
SAP Super User
Pentair Valves & ControlMar, 2010- Nov, 2024 -
MAP - Managing at Pentair
Pentair Valves & ControlJun, 2008- Nov, 2024 -
PIMS - Pentair Integrated Management Systems
Pentair Valves & ControlMay, 2008- Nov, 2024 -
Pentair Culture Training
Pentair Valves & ControlJan, 2007- Nov, 2024 -
Machining Level I - CNC Milling: Programming Setup & Operations
BRIDGEPORT MACHINES, INC.Sep, 2004- Nov, 2024 -
First Responder/Emergency/Advance Emergency Medical Technician
Chilton County Area EMSMar, 2003- Nov, 2024 -
Level 1 Inspector - Destructive/Non-Destructive Testing
CWI Consultants - Birmingham, ALDec, 2009- Nov, 2024 -
Certified CPR Instructor
Birmingham Regional EMS System - BREMSSJul, 2014- Nov, 2024 -
CompTIA A+
New Horizons Computer Learning CentersJul, 1991- Nov, 2024 -
CompTIA Network+
New Horizons Computer Learning CentersJul, 1991- Nov, 2024
Experience
-
Flow Dynamics and Automation
-
United States
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
Operations Manager
-
Aug 2021 - Present
-
-
-
Steward Machine Co., Inc.
-
United States
-
Machinery Manufacturing
-
1 - 100 Employee
-
Project Manager
-
Sep 2020 - Aug 2021
-
-
-
Emerson
-
United States
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
Mechanical Engineer/Project Manager
-
Jun 2000 - Apr 2020
Developed and approved all valve operating and control systems (VOS). Led engineering management team responsible for formulating and building hydraulic, pneumatic and electric VOS systems from quotation / creation through sales and implementation. Conducted component torque / speed sizing and sourcing for VOS systems and controls. Performed all estimating and quoting for customers based on prescribed specifications. Directed supervision of in-house factory personnel on assembly and testing of all VOS systems. Senior on-site product engineer, troubleshooting and evaluating implementations nationwide and abroad (Italy and Argentina). Director of pneumatic / hydraulic / electric systems specializing in ESD (sub .5 sec) operation. Built customer relationships with BP, Shell, Chevron, Exxon Mobil, Marathon Oil, Coachella Valley Water, City of Los Angeles Water, Lockheed Martin, Score Energy, DeZurik, Siemens, Petrobras Brazil, Browns Ferry, Circor Energy, and Tennessee Valley Water. Inside and Outside sales engineer and legal subject matter expert.
-
-
-
ABC-NACO INC.
-
United States
-
Pattern Shop Supervisor
-
Sep 1994 - Jun 2000
Responsible for the day to day operation of a matured pattern shop - supervised 10 pattern makers and graphite profile machinists. Worked closely with the AAR (American Association of Railroads) to create profile and tread geometry. Created custom patterns, tooling and measuring devices, as well as programming CNC equipment. Responsible for the day to day operation of a matured pattern shop - supervised 10 pattern makers and graphite profile machinists. Worked closely with the AAR (American Association of Railroads) to create profile and tread geometry. Created custom patterns, tooling and measuring devices, as well as programming CNC equipment.
-
-
-
Citation Foam Casting Co.
-
United States
-
Manufacturing
-
Quality Assurance Manager
-
Jul 1992 - Sep 1994
Supervised 3 quality assurance employees and their daily shift responsibilities. Accountable for daily scrap rates and iron chemistry. Managed hourly tests on chemistry via the mass spectrometer, as well as hourly sand tests and physical (pull) tests. Worked closely with casting supervisor to custom mix an insulator coating for the lost foam process, as well as designing a reclamation system for unused coating. Supervised 3 quality assurance employees and their daily shift responsibilities. Accountable for daily scrap rates and iron chemistry. Managed hourly tests on chemistry via the mass spectrometer, as well as hourly sand tests and physical (pull) tests. Worked closely with casting supervisor to custom mix an insulator coating for the lost foam process, as well as designing a reclamation system for unused coating.
-
-
-
Schreiber
-
Utilities
-
1 - 100 Employee
-
Designer/Estimator
-
Jan 1990 - Jul 1992
Designed and built biological/wastewater treatment plants for various locations throughout the U.S. Designed and built biological/wastewater treatment plants for various locations throughout the U.S.
-
-
-
Vulcan Engineering Co.
-
United States
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Designer/Drafter AutoCAD
-
Oct 1987 - Jun 1990
Implemented the first AutoCAD system at Vulcan. Designed overland conveyors and detailed structural steel projects - moved to Fox Grinders division after they were purchased. Aided in moving the facility from PA to AL. Designed simple industrial grinders to complex semi-robotic cut-off saws and foundry safety equipment. Implemented the first AutoCAD system at Vulcan. Designed overland conveyors and detailed structural steel projects - moved to Fox Grinders division after they were purchased. Aided in moving the facility from PA to AL. Designed simple industrial grinders to complex semi-robotic cut-off saws and foundry safety equipment.
-
-
Education
-
Auburn University at Montgomery
in progress, Business Administration and Management -
Bessemer State
Engineering and Computer Aided Design