Andrés Vargas Serrano

Commercial Manager at ACCIONA Energía
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chile, CL
Languages
  • English Native or bilingual proficiency
  • Spanish Native or bilingual proficiency
  • German Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Spain
    • Electric Power Generation
    • 700 & Above Employee
    • Commercial Manager
      • Jul 2017 - Present

    • Chile
    • Paper and Forest Product Manufacturing
    • 700 & Above Employee
    • Project Engineer
      • Jun 2012 - Aug 2015

      I was project engineer for a 130 MW wind farm project in one of Chile´s most privileged locations. I managed the communications with engineering, wind energy and electrical line consulting firms, and was in charge of all wind related aspects of the development (7 mast measurement campaigns, production studies, layout optimization), reporting directly to the General Manager of the company. In addition my work entailed the identification of wind farm and hydroelectric development opportunities within the company’s 2.7 million acres of forestry assets. I identified and assessed 27 potential wind farm sites, and worked with a consultant engineer on the preliminary feasibility studies and the assessment of 12 hydroelectric projects ranging from 1 to 60 MW. Another aspect of my work involved managing the interaction with the firm that conducts the process of obtaining an easement strip for a 33 km transmission line project that is part of a US$2.1 billion wood pulp facility project. Show less

  • La Caja Negra
    • Santiago, Chile
    • Business Associate
      • Nov 2008 - Jul 2014

      http://www.lacajanegra.cl/ La Caja Negra is a small business for building and renting video booths, founded with my brothers as a student. This enterprise was awarded the 2010 Speed Business Plan Contest organized by the Universidad de los Andes. http://www.lacajanegra.cl/ La Caja Negra is a small business for building and renting video booths, founded with my brothers as a student. This enterprise was awarded the 2010 Speed Business Plan Contest organized by the Universidad de los Andes.

  • Cristalerías Toro S.A.I.C.
    • Lebu, Chile and Santiago, Chile
    • Lebu Wind Farm Chief Operations and Maintenance Engineer
      • Sep 2010 - Jun 2012

      Cristalerías Toro SpA is a glass products manufacturing company that is also active in the wind energy sector. In 2009 the company installed the third existing wind farm in Chile (Cristoro Lebu), initially a five turbine 3.5 MW project, with two 1.5 MW turbines added in 2011. As chief engineer I worked on-site managing the operation and maintenance of the wind farm and leading a team of four technicians. My work included defining the preventive maintenance protocols and schedules, managing corrective maintenance activities, and producing reports for authorities. I also managed related projects, including the environmental permitting and engineering of an electrical substation project and the initial stages of an expansion project completed in 2014. My work also involved leading the daily operation of the facilities with responsibilities over a housekeeping staff of two, three guards and two night watchmen. In 2011 I traveled to China, Denmark and Spain to visit wind farms and facilities from the turbine manufacturers HeWind, Envision and Vestas, and present the Cristoro Lebu Wind Farm project to the president of HeWind. Show less

    • Chile
    • Higher Education
    • 700 & Above Employee
    • Project Engineer
      • Jul 2009 - Apr 2010

      Pre-graduate thesis and further work as Project Engineer on the design and implementation of a battery energy storage system inverter, in a full practical isolated micro-grid. My pre-graduate thesis (http://goo.gl/oB1Eqp) was inserted as an original and essential part of a renewable energies microgrid project from the Energy Center of the University of Chile that gained funding from a mining company. The project granted continuous electricity supply to Huatacondo, a small, isolated, oasis village community in the Atacama Desert. Previous to our work the village had just a few hours per day of electricity supplied by a diesel generator. The project installed solar panels and a wind turbine. My work consisted in the development of a power inverter that allows the integration of these different energy sources. It was awarded the 2011 Academic Excellence Prize by the Transmission Studies Network Initiative from Transelec S.A.. The design was published at the "Anales del Instituto de Ingenieros de Chile"​ journal (http://goo.gl/wAk3qw; pp. 89-98) and the control system was published and presented at the IECON 2012 (http://goo.gl/9tsUxh). The inverter remains fully operational (as of 2015). Show less

Education

  • Eidgenössische Technische Hochschule Zürich
    MSc in Energy Science & Technology
    2015 - 2017
  • Universidad de Chile
    Electrical Engineer, Electric power generation and transmission, power electronics, smart grid, power markets
    2004 - 2010

Community

You need to have a working account to view this content. Click here to join now