Daniel Nunes

Continuous Improvement Lead at JADE Groupe
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Águeda, Aveiro, Portugal, PT
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Jansley Canuto

Responsável é o primeiro adjetivo que vem em mente quando lembro em descrever o Daniel Nunes. Tive o prazer de colaborar com ele na Schneider, onde fomos parceiros de trabalho na área da qualidade. Fiquei impressionado com senso de responsabilidade, foco e resiliência em lidar com problemas complexos. Com certeza, o Daniel é um trunfo para qualquer equipe que busca resultados.

Jancarle Santos

Tive o prazer de trabalhar junto com o Daniel por alguns anos. Comprometimento, agilidade e adaptabilidade são características que fazem de Daniel um excelente profissional.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Portugal
    • Retail Luxury Goods and Jewelry
    • 100 - 200 Employee
    • Continuous Improvement Lead
      • Sep 2023 - Present

      - Lead the development of the Jade Production System - Leads Kaizen continuous improvement projects through cross-functional team facilitation and project management; - Uses lean manufacturing tools (e.g., value stream mapping, Kaizen, Charters, 5S) to identify and develop solutions that drive operational improvement; - Process mapping, value stream mapping, identifying inefficiencies in productivity; - Demonstrate performance excellence behaviours within the business and champion performance excellence; - Support the business in establishing “best practice”; - Implement standard work, visual factory and error proofing (poka yoke); - Provides leadership by mentoring associates in the use of Lean tools, ensuring transfer of knowledge, and creating a culture of continuous improvement. Show less

  • Triangle’s Cycling
    • Águeda, Aveiro, Portugal
    • Engenheiro Tecnico
      • Apr 2022 - Aug 2023

      Responsabilidade técnica e gestão (produção, manutenção e qualidade) de linha de pintura de quadros de alumínio para bicicletas. Liderança de equipe com 25 colaboradores. A linha de produção conta com células de robores industriais KUKA e controladores de cabeça de pintura. O maior desafio é manter os níveis da qualidade e de produtividade entre os trabalhos manuais e as linhas automatizadas. Responsabilidade técnica e gestão (produção, manutenção e qualidade) de linha de pintura de quadros de alumínio para bicicletas. Liderança de equipe com 25 colaboradores. A linha de produção conta com células de robores industriais KUKA e controladores de cabeça de pintura. O maior desafio é manter os níveis da qualidade e de produtividade entre os trabalhos manuais e as linhas automatizadas.

  • Oneprotect Europe, LDA
    • Sintra, Lisbon, Portugal
    • Industrial Manager
      • Mar 2021 - Mar 2022

      Management of a Medical Devices and PPE factory with a production capacity of 2,000,000 masks per month in which I started from the project phase with the analysis of project needs, project coordination and industrial implementation (Project financed by PT2020). During the plant's StartUp, the biggest challenges were the development of industrial management, the implementation of ERP, the development of the Medical Device Quality Management System (ISO 13485) and obtaining the CE Marking. The implementation of Lean Manufacturing concepts and tools resulted in a productivity growth curve from 0 to 85% in two months. Show less

    • Portugal
    • Food and Beverage Services
    • 1 - 100 Employee
    • Industrial Manager
      • Aug 2019 - Mar 2021

      Management of a coconut derivatives factory with a production capacity of 300 tons per month in which I started from the conception and project phase with the analysis of project needs, project coordination and industrial implementation (Project financed by PT2020). Managed the development and implementation of the Integrated Quality System covering ISO 9001, ISO 14001, NP 4457 and ISO 22000, integrating the departments. In line with SIQ, I structured product development. Management of a coconut derivatives factory with a production capacity of 300 tons per month in which I started from the conception and project phase with the analysis of project needs, project coordination and industrial implementation (Project financed by PT2020). Managed the development and implementation of the Integrated Quality System covering ISO 9001, ISO 14001, NP 4457 and ISO 22000, integrating the departments. In line with SIQ, I structured product development.

    • France
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • Offer Project Quality Leader
      • Sep 2014 - Jul 2019

      Responsible for Product Offering Quality of Schneider Elétric's IT business unit in Brazil and South America region. With total focus on the customer, I work in three main phases: In the development of new products, ensuring maximum attention to the customer experience and lessons learned from previous products. In the solution of design, manufacturing or delivery problems not dealt with in the previous phase, but experienced by the customer, generating the evolution of the product. And in product and process innovation in partnership with a global development center. Promoter of Customer Focus actions in the development center and manufacturing environment. Schneider Electric is a Multinational/Global company, and I had very close collaboration with several other departments (Supply Chain, R&D Engineering, PMO Project Management, Purchasing, CCC After Sales, etc.) in various regions of the world reporting directly to the US . The main results are the reduction in the Warranty Cost: 42% reduction in the warranty cost (reduction of BRL 697K annually) of the offer of products in Brazil, preparation and management of a 5-year Quality Improvement Plan: Reduction of 33.5% in the failure indicator in the field of the offer of products in Brazil, and the leadership of Innovation Projects: Approving 03 projects from the Brazil development center to the Top 10 Global, competing with the USA, China and India. Show less

    • Brazil
    • Environmental Services
    • 1 - 100 Employee
    • Project Management Coordinator
      • May 2012 - Aug 2014

      Engineering Coordination responsible for developing Basic and Detailed Projects in Photovoltaic Energy Generation, establishing relationships with customers and electricity concessionaires. Coordinated photovoltaic plant deployment projects Focused on innovation, I conducted research and development studies on new technologies for photovoltaic and wind generation, and was responsible for managing the acquisition and processing laboratory for meteorological and generation data. As a main result, we designed and installed 2 MW Photovoltaic Distributed Microgeneration Plant, the largest photovoltaic park in Brazil at the time, with an investment of R$ 8,000,000.00 in Juazeiro/BA, Brazil. Show less

    • Brazil
    • Electric Power Generation
    • 100 - 200 Employee
    • Project Management Coordinator
      • Jun 2011 - Apr 2012

      Coordination of the development of industrial projects team with 1 engineer and 2 technicians responsible for process development, mechanical projects and electrical projects. Project management for the implementation of an industrial unit. Inspection of Delta teams and outsourced equipment manufacturing, assembly of structures, civil and mechanical, electrical and industrial automation installations. Led by the Operational Director. Investment amount R $ 25,000,000. Coordination of the development of industrial projects team with 1 engineer and 2 technicians responsible for process development, mechanical projects and electrical projects. Project management for the implementation of an industrial unit. Inspection of Delta teams and outsourced equipment manufacturing, assembly of structures, civil and mechanical, electrical and industrial automation installations. Led by the Operational Director. Investment amount R $ 25,000,000.

  • RCORREA Tecnologia
    • Fortaleza, Ceará, Brazil
    • Project Management Coordinator
      • May 2010 - Mar 2011

      Engineering Management and Turn Key Implementation of Industrial Chemical Units (Engineering, manufacturing, acquisitions and assemblies). Elaboration of projects (basic and execution) of processes, mechanics, instrumentation and automation. Management and inspection of the implantation of industrial units. Commercial contact with existing and potential customers. Engineering Management and Turn Key Implementation of Industrial Chemical Units (Engineering, manufacturing, acquisitions and assemblies). Elaboration of projects (basic and execution) of processes, mechanics, instrumentation and automation. Management and inspection of the implantation of industrial units. Commercial contact with existing and potential customers.

    • Oil and Gas
    • 1 - 100 Employee
    • Engineering Coordinator
      • Nov 2004 - Apr 2010

      Coordination of development of engineering projects and Project Management Implementation of 06 Biodiesel and Vegetable Oil Extraction plants of medium size (R$ 25,000,000 each plant) with a capacity of 300 tons per day. Responsible for continuous improvement journeys and plant expansions. Preparation and implementation of Maintenance Planning. Experience in managing simultaneous multi-projects and multidisciplinary teams (3 engineers, 3 design technicians, 10 mechanical technicians, 2 implementation supervisors). Preparation of operation, maintenance, logistics, quality, production control procedures. Training of industrial teams (More than 500 trained supervisors, operators and maintainers). Technical support for plant maintenance. Show less

  • Enguia Gen
    • Fortaleza, Ceará, Brazil
    • Maintenance Supervisor
      • Feb 2003 - Oct 2004

      Coordination of the maintenance team (1 supervisor and 2 technicians) responsible for 12 thermoelectric plants (249 MW) in the treatment of anomalies, preparation and execution of the preventive maintenance plan, execution of improvements and maintenance of equipment that required greater knowledge. Coordination of the maintenance team (1 supervisor and 2 technicians) responsible for 12 thermoelectric plants (249 MW) in the treatment of anomalies, preparation and execution of the preventive maintenance plan, execution of improvements and maintenance of equipment that required greater knowledge.

  • Corenav Reparos Navais
    • Fortaleza, Ceará, Brazil
    • Mechanical Technician
      • Jul 2001 - Jan 2003

      Coordination of maintenance teams (03 mechanics) of Diesel Engines, generator sets and vessel structure. Budgeting. Execution planning and control. Coordination of maintenance teams (03 mechanics) of Diesel Engines, generator sets and vessel structure. Budgeting. Execution planning and control.

Education

  • ESTGA - Universidade de Aveiro
    Master of Total Quality Management TQM, Business, Management, Marketing, and Related Support Services
    2022 - 2024
  • Universidade de Fortaleza
    Third, Control and Automation Engineering
    2008 - 2014
  • Unichristus
    Master of Business Administration (MBA), Project Management
    2016 - 2018
  • Instituto Federal de Educação, Ciência e Tecnologia do Ceará
    Third, Automation Engineer Technology/Technician
    2001 - 2007
  • Universidade de Aveiro
    Master of Total Quality Management, Total Quality Management
    2022 - 2024

Community

You need to have a working account to view this content. Click here to join now