Muhammad Touseef Siddiqui

External Member of "Industrial Advisory Board" of Computer Systems Enigeering Department at Dawood University of Engineering and Technology
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK
Languages
  • Sindhi, Urdu, English, Punjabi Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

AMIR AHMAD

Touseef is a detail oriented and very hard working professional who likes to take challenges and gives result with minimal supervision. i highly recommend him for any challenging and hard task in his capacity and experience.

waseem abbas

I found him having good management experience of TI work. Good knowledge of all fields of cellular work.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Education Administration Programs
    • 100 - 200 Employee
    • External Member of "Industrial Advisory Board" of Computer Systems Enigeering Department
      • Apr 2018 - Present

      Giving Inputs to the university for their syllabus contents as per new trends in Industry of Telecom and Computer systems. Liaising b/w Academic and Industry to generate young Graduates with exposure to technologies in the field of ICT. Giving Expert Opinions to the Department. Giving Inputs to the university for their syllabus contents as per new trends in Industry of Telecom and Computer systems. Liaising b/w Academic and Industry to generate young Graduates with exposure to technologies in the field of ICT. Giving Expert Opinions to the Department.

    • Project Manager
      • Jul 2019 - Present

      Project Management role to over see below ICT/IT/Energy Related Projects NEC , Karachi Electric- MW Implementation PTCL-DRS links Up gradation PTCL-Guyed Mast Towers Design, Fabrications and installation and Maintenance PTCL-Renovations of PTCL Exchanges Sindh Government Energy Department-Solar Systems installation and O &M at Government Health units across Province of Sindh. Sindh Government: Online Bio-metric Attendance Systems Deployment Project Management role to over see below ICT/IT/Energy Related Projects NEC , Karachi Electric- MW Implementation PTCL-DRS links Up gradation PTCL-Guyed Mast Towers Design, Fabrications and installation and Maintenance PTCL-Renovations of PTCL Exchanges Sindh Government Energy Department-Solar Systems installation and O &M at Government Health units across Province of Sindh. Sindh Government: Online Bio-metric Attendance Systems Deployment

    • China
    • Telecommunications
    • 700 & Above Employee
    • Design TL (Swap, 2G,3G, LTE , LTE Refarm, MORAN , Core, Transport, Data Center Design Expert)
      • Jun 2012 - Jun 2019

      Telenor Pakistan:Responsibilities/Achievements:• Nationwide project handler of ZTE 4x4 MIMO for Telenor Pakistan for the very first time in Pakistan.• Telenor Data Center Infrastructure Designing and Planning and supervision on its execution.• 3000 sites of LTE/3G Rollout TSS, TSSR, Designing layouts and supervision Execution.• CW/RF/Txn TSS and designing layout and detailed Engineering Designs.• Nationwide Power Swap Survey , designing layout and TSSR preparation• More than 3000 Macro/Micro (IBS) sites planning, survey, design and implementation experience.• Site CW/Electrical Work and Tower Fabrication designing.• Experienced in designing BSC, DWDM, Transport Nodes with Power Plan• 3G RAN/Core/Transport Designs for ZTE BS8700, BS8900, BS8908, PTN, RNC.• Experienced in BOQ, and SOW designing.• Successfully designed more than 2000 Telenor sites for Vega• Successfully design first & 2nd batch of 3G sites of Telenor.• Successfully designed TP rollout project for first/2nd Quarter of 2014.• Ensuring Implementation as per my Designs.• Rollout RAN Designs all over south• Responsible for designing RAN network for the Swap, 3G and Roll-out sites• Preparing, verifications of TSS/LOS reports, DED, RF/Txn/Civil BOQ• Designing RAN, BSC, MSC, PTN sites.• Liaison with RF team to propose Trx configuration, rectifiers, BTS types, DC Power systems.• Involve with Txn team to design Txn networks.• Defining swap solutions, measuring site power load, • Analysis of tower loading, designing tower strengthening if tower is overloaded• Close coordination with implementation to cutover sites as per designed networks.• Site lay out drawings to service suppliers and ensure the quality of drawings from construction and Participate in preparing construction works and site Design RFQ including technical specifications.

    • Site Design Team Lead
      • Jun 2012 - Jun 2019

    • Site Design Team Lead (Mobilink Swap and Rollout Project)
      • Mar 2015 - Dec 2015

      Was fullfiling dual Responsibility of Telenor project with Mobilink Project during Mobilink SwapTeam Lead for BSC Desing in Hyderabad, Sukkur, Quettla Media Gateway.2G /3G Swap RAN Designing.Survey, TSSR, BOQ,BOM compiling Givenn Site Solutions during Cutover nights

    • Manager Telecom Implementation & Coordination
      • Nov 2008 - Apr 2012

      Working as Manager Telecom Implementation on Warid Project. Cow/Colt (Cell –On-Wheels) sites deployment. Supervising LOS and TSS surveys of COWs all over Pakistan. LOS reporting through Pathloss 4.0 and Google Earth Pro . Installation, commissioning and integration of Huawei BTS 3012 & 30121AE. Installation, commissioning & integration of Ericsson RBS (2207,2206,2216,2116,2107,2106). MW Installation and commissioning of Ericson TN& Minilink Classic, NEC Pasolink , Huawei RTN MW & Nera City Link. BER and Sweep Testing by using BERT and Anritsu/Bird Site Master. Supervising Cell and Co-location sites (PTT) dismantling. MW links cutover, Installation, Dismantling & Re-Installation. Working on MapInfo, Pathloss 4.0, Global Mapper and Google Earth Pro. Conducting Acceptance of Sites (PAT/FAT). Preparing RFP,,RFQ,BOQ and PO for customers. Conducting quality audits of sites with customer. Coordination with Vendors, Operator and Sub cons. Directly reporting to CEO.

    • Technology, Information and Internet
    • 1 - 100 Employee
    • Sr. Telecom Implementation Engr.
      • Jan 2006 - Oct 2009

      a). Motorola/Wi-Tribe Wimax Project: Worked as Head of TI Department in South on Motorola Wi-Max Project. Prepared TSS/LOS reports. Worked on Path Loss, Global Mapper and Mapinfo. b). ALCATEL/CMPAK Project: Worked as Sr. Telecom Engineer on Alcatel-Lucent Project for CM PAK sites. Supervised the installation and done commissioning BTS and Microwaves of more than 70 CMPAK (Paktel) sites in North. Conducted TSS and LOS with Vendors (Alcatel). Worked on Pathloss 4.0 and MapInfo softwares. Performed LOS activity. Prepared TSS report. Have been involved in acceptance of TI works on CM-Pak sites. c). PAKTEL Project: Worked as TI Engineer on Paktel Project in Central and South region and got experience on following equipments i) ALCATEL & ERICSSON: Supervised the installation of ALCATEL BTS & Microwaves IDU/ODU Commissioned and done panning of the Microwaves. Performed BER Testing for the Microwaves and cleared the media ii) ZTE: Installed the BTS. Done its electrical connection and checked the power of the BTS. Configured and commissioned it. Troubleshooted its hardware and software problems. Done sweep test (VSWR, Return Loss and Distance to fault ratio) for feeder cables & jumpers. Done the Power attenuation test for the BTS. Done the sites On-Air and handed over to Paktel. Acceptance: Got acceptance of more than 70 sites from Paktel Operation and Project both. Managed and carried out ATPs/PACs/FACs. During the acceptance, performed Power Attenuation test and removed all snags. Performed the Call Test/Drive Test for allotted frequency (ARFCN), cell identifier, call quality and other related technical parameters.

    • Sr. ImpementationEngineer
      • 2005 - 2007

      TI over Rollout sites.DCS ExpansionMW implementationTSS RF and LOS SurveyProject Coordination.Post installation troubleshoortings

    • Sr. ImpementationEngineer
      • 2005 - 2007

    • Trainee Engineer
      • Jun 2005 - Oct 2005

      i) MSC Inter-Connectivity: Worked at Switch and Transcoder end to ensure the connectivity of various DIUs and Atters. Successfully handled the Routine daily DIU down time activity. Involved in ATM cutover and Alarms removing on transmission media Patched DIUs and Atters for MSC and Transcoders and Basks. ii) Huawai (Optical Fiber Junction Access Network): Involved in Commissioning and patching of SDH Equipment with Huawai Engineers. Involved in Testing of Electrical (E1) & Optical Interfaces for STM-1, STM-4, STM-16, and STM-64 in the SDH Equipment at Involved in the Installation of OSN (optical-fiber site network). iii) Motorola: Involved in BTS and BSC Commissioning with Motorola Consultants. Successfully done routing /patching for Motorola BTS and BSCs. Involved in Calibration of Motorola BTS with Motorola Consultants. Involved in daily Alarms handling of Motorola BSC & Transcoder. iv) Routine Activities: Successfully Done Preventive Maintenance. Worked with On-Call Engineer for BTS and BSC sites. Successfully handled the routine daily DIU down time activity.

    • Internee
      • Jun 2004 - Aug 2004

      HARDWARE & NETWORKING DEPT. Handled the daily activity of networking issues. Working on ATM networks of the Bank Managed the rectification of hardware issues. Operating systems installation with Application softwares. Day to Day troubleshooting of hardware, Software and networks. HARDWARE & NETWORKING DEPT. Handled the daily activity of networking issues. Working on ATM networks of the Bank Managed the rectification of hardware issues. Operating systems installation with Application softwares. Day to Day troubleshooting of hardware, Software and networks.

Education

  • University of Karachi
    MBA, Executive
    2013 - 2015
  • Quaid-e-Awam University of Engineering, Sciences and Technology Nawabshah
    B.E, Computer Systems Engineering
    2000 - 2005
  • Quaid-e-Awam University of Engineering, Sciences and Technology Nawabshah
    Bachelor of Engineering - BE, Computer Systems
    2000 - 2005

Community

You need to have a working account to view this content. Click here to join now