Brent Olund

Vice-President, Sustainable Construction at Urban One Builders
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Vancouver, British Columbia, Canada, CA

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Bryan W. Robinson

During the opportunity directly with Brent on 2010 Olympic Athlete's Village remedial work, he proved to be very conscientious, thorough and dependable in negotiation and completion of project. Thank you Brent

Hans Edstrand

Brent is undoubtedly one of the brightest minds I have had the pleasure of working with throughout my time in the construction/development industry. His technical knowledge combined with superior business management insight were instrumental in the success of ITC. Add to this the fact that Brent is a person with very clear sense of right and wrong and I have no doubt UrbanOne Builders will grow to become a force for years to come in the Vancouver landscape.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Canada
    • Construction
    • 1 - 100 Employee
    • Vice-President, Sustainable Construction
      • 2011 - Present

      Urban One Builders is a full service construction company focused on building residential, mixed use, commercial and institutional projects. Our experienced executive team is focused on creating an organization that offers our clients building knowledge and leading-edge processes with ethical leadership and social responsibility. Urban One Builders is a full service construction company focused on building residential, mixed use, commercial and institutional projects. Our experienced executive team is focused on creating an organization that offers our clients building knowledge and leading-edge processes with ethical leadership and social responsibility.

    • Director of Construction, Commercial and Special Projects
      • Nov 2009 - 2011

      Provide strategic and operational planning and business development with specific focus on Commercial and Special Projects sectors which ITC has traditionally had only incidental focus on, in order to provide ITC with long-term business diversification.Create business model (of systems, policies, and procedures), design organizational structure, recruit (internally and externally) and lead team of personnel well suited to the new types of work. Implement customized business controls and reporting / Key Performance Indicators for the new business units, and participate directly in decisions required by all major exceptions identified on each active project.

    • Project Director
      • May 2002 - Nov 2009

      Hire / assemble, train, and oversee project teams from preconstruction phase (~ 8 months) through construction phase (~24 months) of each project. Concurrently oversee 3 to 5 projects. Co-manage warranty phase (several years duration) upon completion of each project.Major responsibility included field management of ITC's Calgary Division (2005-2007) until our Branch Office was set up there, and management of ITC's construction of approximately 45% of Millennium Water / Southeast False Creek Olympic Athletes' Village (April 2007 - November 2009).

    • Estimator
      • 2001 - 2001

      Concept and detail estimating and budgeting from quantity takeoff and unit rates to Trade tendering, value engineering, and contract budget stage. Concept and detail estimating and budgeting from quantity takeoff and unit rates to Trade tendering, value engineering, and contract budget stage.

    • Project Engineer
      • 1998 - 1999

      Marine and on-shore construction of Public Seawall with 75-year design life for City of Vancouver via Aoki Corporation. The work included dredging, vibro-densification, marine fill, pile driving, gabion basket walls, lock block walls, cast in place concrete pile caps, precast deck panels, railings, hard and soft landscaping, watermains, sanitary forcemain, and high-voltage underground services. Much of the gabion basket and lock block wall work was well below the low tide line and had to be done in the winter to suit DFO regulations and at night to suit the timing of the low tides.Performed all on-site administrative functions including scheduling, procurement, purchasing, Change Orders, Progress Billings, progress reports to Client etc.Performed day shift field supervision of average daily workforce of 21 trade personnel and 4 own-forces personnel. Also performed night shift supervision when required.

    • Project Coordinator
      • 1997 - 1998

      Longwood Station Mall - new shopping mall of 11 buildings in train station architectural style and anchored by Thrifty Foods.Carisbrooke Condominium - four storey 69 suite woodframe condominium with one level concrete underground parking.Performed scheduling, construction planning, purchasing, procurement, Change Orders, and all on-site monitoring, tracking, and reporting for these projects. Worked with Superintendents to resolve field issues. Issued formal correspondence to stakeholders to manage schedule, cost, and quality exceptions.

    • Canada
    • Construction
    • 400 - 500 Employee
    • Project Coordinator
      • 1996 - 1996

      IPL Line 2 and Line 13 Capacity Upgrades. Constructed oil pumphouses including 18,000lb. Sulzer-Bingham pumps in metal clad structural steel buildings on concrete foundations including all mechanical, electrical, and controls.Performed scheduling, surveying and layout, purchasing, estimating / pricing / negotiation of Change Orders, preparation and submission of progress billings, and progress reporting to Client (Interprovincial Pipe Lines). IPL Line 2 and Line 13 Capacity Upgrades. Constructed oil pumphouses including 18,000lb. Sulzer-Bingham pumps in metal clad structural steel buildings on concrete foundations including all mechanical, electrical, and controls.Performed scheduling, surveying and layout, purchasing, estimating / pricing / negotiation of Change Orders, preparation and submission of progress billings, and progress reporting to Client (Interprovincial Pipe Lines).

    • Canada
    • Construction
    • 400 - 500 Employee
    • Project Coordinator
      • 1995 - 1995

      Wood-fired cogeneration plant including fluidized sand bed combustion technology.Created project scheduling of Civil construction works in Primavera and interfaced as a subproject into overall master schedule of 3-party Joint Venture (with Sandwell and ABB). Tracked and managed the schedule including weekly communications with stakeholder groups. Performed all on-site calculations / analysis for the weekly and daily planning of the work. Performed safety planning and site orientations for the new facilities and their areas of interface with the existing sawmill operations. Liased with client (Finlay Forest Industries) and all Trades.

Education

  • Ivey Business School at Western University
    MBA, General Management, Strategy, Finance
    2000 - 2002
  • The University of British Columbia
    M.Eng., Civil Engineering: Construction Management
    1996 - 1997
  • The University of British Columbia
    BASc, Civil Engineering, Buildings / Structural
    1992 - 1996
  • Carson Graham High School
    High School Diploma
    -

Community

You need to have a working account to view this content. Click here to join now